CONTENTS
1 Introduction
1
2 Mission Statement and Vision
3
3 Guiding Principles
5
4 Main Strategies
9
4.1 Risk reduction 9
4.2 Enlargement of access to banking and payment services 14
4.3 Enlargement of electronic networks of individual banks and interoperability 17
5 Business Process Modeling and Architecture of the New NPS
19
5.1 The central role of electronic data exchange in the new NPS 19
5.2 Centralized clearing of large value payments 21
5.3 Centralized versus decentralized clearing of retail payment instruments other
than cheques 22
5.4 Centralized versus decentralized clearing of cheques 24
5.5 Overall architecture of the NPS 25
5.6 The NPS communication network 31
6 Outline of the Strategic Plan
38
6.1 Core elements of the strategic plan 38
6.2 Systems and facilities to be acquired 39
6.3 Efficient use of modern technology to reduce investment costs and to
avoid possible underutilization of the systems 39
7 Working out of the Core Elements
43
7.1 Development of a legal framework and physical infrastructure that will
Support the new NPS 43
7.2 The communication network 46
7.3 The infrastructure for large value and time critical payments 48
7.4 Payment instrument mix and access to payment services 52
7.5 The upgrading of the systems for payment processing of commercial banks and
connection of branches to the head office 54
7.6 The infrastructure for clearing and settlement of retail payments 55
7.7 Cross border payments 60
7.8 The infrastructure for the clearing and settlement of securities 62
7.9 The oversight framework 67
8 Phasing and Setting of Priorities: the implementation plan
68
8.1 Possible constrains and the need for setting of priorities 68
8.2 Highest priorities: implementation of an RTGS system 69
8.3 Retail payments: highest priority the interoperability of ATM and POS networks 69
i
8.4 Clearing of Cheques First priority: standardization 69
8.5 The implementation plan 70
List of Abbreviations
AACO Addis Ababa Clearing Office
ACH Automated Clearing House
ACSI Amhara Credit and Saving Institution
ADB African Development Bank
ADSL Asymmetric Digital Subscriber Line
ATM Automated Teller Machine
BFWA Broad Band Fixed Wireless Access
CBE Commercial Bank of Ethiopia
COC Clearing Office Committee
CPI Consumer Price Index
CPO Cashier’s Payment Order
CPSIPS Core Principles for Systemically Important Payment Systems
CPSS Committee for Payments and Securities Settlement
CSD Central Securities Depository
DESCI Dedebit Credit and Saving Institution
DVP Delivery versus Payment
EASSy Eastern Africa Submarine cable
ECP Electronic Cheque Presentation
ECX Ethiopian Commodity Exchange
EFT Electronic Funds Transfer
ii
EFTPOS Electronic Funds Transfers at Point of Sale
EFY Ethiopian Fiscal Year
EICTDA Ethiopian Information and Telecommunication Technology
Development Agency
ETA Ethiopian Telecommunication Authority
ETC Ethiopian Telecommunication Corporation
GDP Gross Domestic Product
IBFEM Inter-bank Foreign Exchange Market
ICT Information and Communication Technology
IFAD International Fund for Agriculture Development
IFMIS Integrated Financial Management Information System
IMF International Monetary Fund
IP Internet Protocol
ISIN Internal Security Identifying Number
MFI Micro-Finance Institution
Mbps Megabit per second
MICR Magnetic Ink Character Recognition
MIS Management Information System
MSE Micro and Small Enterprise
MW Megawatt
NBE National Bank of Ethiopia
NGO Non-Governmental Organization
NPS National Payment System
OCR Optical Character Recognition
OTC Over The Counter market
PASDEP Plan for Accelerated and Sustained Development to End Poverty
PKI Public Key Infrastructure
POS Point of Sale
PVP Payment Versus Payment
iii
RFP Request For Proposal
RSP Remittances Service Provider
RTGS Real Time Gross Settlement System
RUFIP Rural Financial Intermediation Program
SACCO Savings and Credit Corporative Office
SEPA Single European Payment Area
SLA Service Level Agreement
SSS Securities Settlement System
STP Straight Through Processing
SWIFT Society for Worldwide Inter-bank Financial Telecommunication
USD United States Dollar
VPN Virtual Private Network
iv
1. Introduction
The Vision and Strategic Framework is the third report drafted within the framework of
the modernization of the National Payment System in Ethiopia. The first or Inception
Report was meant to lay out the project structure and project governance and define
overall critical success factors for the project. In the second report a thorough and
comprehensive stocktaking of the socio-economic background and the infrastructure for
payments and financial markets was conducted. The stocktaking report describes the
supply of key utility services as telecommunication and electricity, the existing legal
framework for payments and the structure of the financial sector in Ethiopia. It analyzes
the strength and weaknesses of the existing payment systems and payment instruments
and the conduciveness of the external environment for the modernization of the National
Payment System (NPS). A description of the different financial markets is given and the
report indicates in which stage of development these markets are. Important issues for the
modernization process are highlighted in the Stocktaking Report.
In this third report a vision and strategic plan is developed for top-level consultation.
Based on this report the discussion will focus on:
(i) The mission statement for the modernization process;
(ii) The guiding principles;
(iii) Main Strategies;
(iv) Business process modeling and architecture of the future NPS;
(v) The strategic plan for modernization of the NPS;
(vi) The implementation plan.
Guiding principles are dealt with in chapter 3. Guiding principles are a prerequisite for
the development, deployment and management of the NPS. Their aim is to dispel any
ambiguities about the roles, responsibilities, ownership and participation of different
1
stakeholders in the NPS and avoid confusion about different payment system processes.
Once agreed upon the principles become non-negotiable and the basis upon which
disputes and conflicts will be solved.
The main strategies (chapter 4) form the basis for working out the strategic plan for a
new NPS. In this chapter policy recommendation are made on issues as: (i) risk
reduction; (ii) promotion of the access to banking and payment services; (iii) enlargement
of the electronic networks of commercial banks and the interoperability of these
networks.
In the business process modeling and architecture (chapter 5) major issues such as the
role of electronic data exchange are discussed. For the settlement of retail payments the
advantages and disadvantages of a centralized and decentralized clearing and settlement
infrastructure are laid out. The overall architecture of the clearing and settlement
infrastructure is discussed and due consideration is given to the type of network used for
communication in the payments and securities settlement area.
Taking into account the mission statement and the objectives for the modernization of the
NPS, as well as the strategies and proposals for the business modeling and architecture, a
strategic plan is drafted. In the outline of the strategic plan in chapter 6 the core elements
of the strategic plan are defined and worked out in more detailed in chapter 7.
Since the present infrastructure for payments is in a rudimentary stage the modernization
of the NPS will require a large amount of work and investments. Taking into account the
scarce financial resources and available manpower, as well as the need to reduce initial
losses in the infrastructure for clearing and settlement, priorities have to be set and the
implementation of the strategic plan has to be carefully planned. In chapter 8 a proposal
is made how to set priorities and an implementation plan is drafted.
If the NBE, the Steering Group and the National Payment Council agree on the vision,
guiding principles, objectives, main strategies and implementation plan, they shall be put
in a Memorandum of Understanding (MOU) that will be signed by all parties involved.
2
2. Mission Statement and Vision
In the inception report the objectives and expected results were defined for the
Modernization of the NPS (see annex 2). Based on these objectives and expected results
the mission of the National Payment System (NPS) modernization and the foundations on
which it will be built can be formulized as follows:
Mission statement
The mission of the modernization of the National Payment System in Ethiopia is to
develop an efficient, reliable and safe infrastructure for payments and securities
settlement that:
(i) complies with international standards and best practices;
(ii) fits into the Ethiopian environment and takes into consideration Ethiopian
customs and business practices and fully supports the needs of the users;
(iii) is cost effective and affordable for its users;
(iv) buoys up international remittances and financial markets;
(v) is conducive to the development of the Ethiopian Economy.
This shall lead to concrete results that are defined in the following overarching vision:
Vision
On its way to a cashless society in the Ethiopian year 2010 1 Ethiopia shall have in place a
modern payment infrastructure that not only effectively supports the emerging financial
markets and monetary policy but also forms the heart of a developed market for retail
payments. The new National Payment System will cover the whole country and will offer
the users a broad range of modern payment instruments. In 2010 at least two third of all
households will have access to these financial services.
1
The Ethiopian year 2010 starts mid 2018 on the Gregorian calendar
3
The Ethiopian fiscal year (EFY) 2010 is chosen to have a clear but realistic target that: (i)
takes into account the technical skills, knowledge, and capacity in the banking industry;
(ii) recognizes that non-cash payment instruments other than cheques are virtually non-
existent at present; (iii) the two existing payment systems are outdated; (iv) the legal
framework is inadequate and has to be updated drastically; and, (v) acknowledges that
financial markets still have to be developed.
The vision makes clear that, next to the effective support of the emerging financial
markets in Ethiopia, the ultimate goal of the NPS modernization project is to broaden the
access of the public to financial services and gain further momentum in the development
of the banking industry by, among others, developing the market for retail payments. In
this context the goal is to redouble the access to payment services and at least two third of
all house holds in Ethiopia shall have opened an account with a commercial bank or MFI
in the EFY 2010.
Strategic approach
The approach to implement the modernization project shall be strategic rather than
operational. In a pure operational approach the changes targeted – in the main – are those
that address clearly recognized problems whereas the strategic approach addresses such
problems too but also exploits additional improvement opportunities such as those
stemming from efficient use of technology and tries to develop markets and payment
services.
4
3. Guiding Principles
The determination of guiding principles is a prerequisite for the development,
deployment and management of the NPS. These principles cover certain areas such as
cooperation, competition and access, responsibilities and risk management. They form in
some sense the constitution for the NPS. Once agreed upon the principles become non-
negotiable and form the basis upon which possible disputes and conflicts will be solved.
The NBE shall set procedures to monitor the effects of the guiding principles and, if
necessary, make proposals to update them.
Cooperation
Collaborative approach
The development of the NPS infrastructure is a co-operative responsibility and the
commitment and active participation of all stakeholders should be ensured. A safe,
reliable and fast NPS infrastructure is crucial for the development and smooth
functioning of the economy and financial sector and the development of financial
markets. All stakeholders will therefore loyally cooperate to achieve the objectives and
goals of the NPS modernization project. A special role in this process will be played by
the banking community. Banks are the key players in the NPS due to their central role as
payment services providers.
The National Bank of Ethiopia takes the lead in the modernization process
Due to its overall responsibility for a sound currency the central bank has a central role in
the development of the use of money as an effective means of payment. It will take the
lead in the modernization process, establish a proper project structure and project
management and ensure that all stakeholders will be involved in the project.
5
of the National Payment System and as catalyst for change and development. It will
establish a permanent framework for consultation, cooperation and decision taking that
will ensure the awareness of stakeholders of payment issues and developments and the
adequate adaptation of the NPS to a changing environment and demands.
6
realized. Therefore banks should be willing to connect their networks. No incentives
should be built in that prevent customers to send payments to clients of other banks or
using the ATM and POS network of other banks, for instance by charging prohibitive
fees for such activities. Neither should a bank charge such prohibitive fees to another
bank for inter-bank transfers.
Recovery of costs
Inter-bank payment and securities settlement systems should operate cost effectively and
should, after the markets have reached maturity, recover all costs.
Responsibilities
The NBE provides settlement services to banks and the government
The NBE acts as the banker of banks and the cashier of the government. Settlement of
inter-bank payments takes place in central bank money.
Banks are eligible to provide clearing and settlement services to the public
Clearing and settlement of payments is the exclusive domain of banks and other
institutions licensed by the NBE to provide payment services and to participate in the
inter-bank clearing and settlement infrastructure.
7
Risks
Settlement is subject to the availability of funds
All inter-bank settlements require sufficient funds. Banks shall monitor and manage the
liquidity in their settlement account closely and take appropriate actions to ensure timely
settlement.
8
4. Main Strategies
In this chapter three main strategies are presented that will highly affect the design and
structure of the new NPS. The strategies are:
1. To reduce the risks in the present infrastructure and especially in the clearing of
cheques;
2. To promote access to banking and payment services and double the amount of
households with a payment or saving account;
Due to the lack of effective risk management measures in the clearing of cheques, the
present infrastructure exposes the banking industry to liquidity risk, credit risk and
systemic risks. The present system is used, among others, for large value and time
critical payments (average value of a cheque: Birr 87.557 or around 30 times the national
income per capita) and is with a turnover of 108% of GDP systemically important.
According to the Core principles for such systems the risk should be contained. To
reduce the risk in the AACO there are two options:
2. Reduce the volume in the clearing and shift payments to other more safe systems.
Option one: Implement effective risk management measures to contain the liquidity,
credit and systemic risk in the AACO.
9
Explanation: The present AACO system clears and settles cheques issued in Addis Ababa
on a deferred multilateral basis. 2 However, no risk management exists “to ensure the
timely completion of daily settlement in the event of an inability to settle by the
participant with the largest single settlement obligation” 3 . No liquidity and loss-sharing
arrangements are in place to ensure timely settlement, neither are debit or credit caps set
to limit the risk. Also other measures, for instance, strengthening the legal framework,
dissemination of information on the risks participants are exposed to, automation of the
processing etc. have to be taken to ensure compliance with the Core Principles 4 .
Moreover, it is very difficult for a Clearing and Settlement System for Cheques to
comply in full with the Core Principles for Systemically Important Payments Systems
due to the returned cheque procedures that delays the finality 6 and the difficulties in this
type of systems to place a limit on the maximum settlement obligation of participants 7 .
Participants cannot manage the payment flows in a cheque system.
Special Cheque procedure Without adequate risk management measures in the AACO
itself, the presenting banks should not be allowed under the present special cheque
2
The system uses no netting in the sense that the amount to be paid by a participant to all other participants
and the amount to be received from all other participants are settled separately
3
See Core Principle V
4
See the “Assessment of observance of the AACO of the CPSS-Core Principles for Systemically Important
Payment Systems”, Annex 1 of the Stocktaking report
5
See IMF and the World Bank, “Guidance note for Assessing Observance with the Core Principles for
Systemically Important Payment Systems (CPSIPS)”, Washington, 2001, p.17 point d
6
See CPSS, Core Principle IV, “the system should provide prompt final settlement on the day of value
preferable during the day and at a minimum at the end of the day”
7
IMF/World Bank, 2001, p.17 point e
10
procedures to credit the accounts of the beneficiary prior to the moment on which the
settlement of the inter-bank clearing outcome becomes irrevocable and final. Special
cheques are for inter-bank clearing and settlement incorporated in the settlement matrix
of the AACO via so called “vouchers”. These vouchers are normally included for
settlement one or several days after the cheque is honored and the presenting bank has
credited the account of the beneficiary. This brings forward that collecting banks are
exposed to credit and liquidity risk during at least one and maybe several days, the period
in which there is no certainty that the paying bank will be able to fulfill its obligations in
the clearing, while they have already credited the cheques to the account of their
customers. How large the risk is, is not known exactly, but the amount of cheques cleared
via the special cheque procedure is possibly huge (in some cases up to 50% of all cheques
presented by a bank). If a paying bank fails to settle, a complex legal issue will arise
around the question who will bear the losses: (i) the beneficiary who in that case has to
pay back the received funds; (ii) the bank of the beneficiary who has already credited the
account of his client but has not receive the funds in the clearing; or, (iii) the payer who
has still an payment obligations since the first transfer was not final. Both the beneficiary
and the payer will claim that the payment is final and that the liability to pay is fulfilled.
The problem will be even more complex when the funds are already used by the
beneficiary to fulfill his own payment obligation.
However, abolition of this facility without having an alternative would deteriorate the
service level and would not be in line with the needs of the users, who like to reduce the
settlement time and have the funds available as fast as possible.
Option two: Reduce the volume in the AACO by shifting payments to other systems
Reducing the volume and value in the clearing means simply reducing the risks. There
are three ways to reduce the volume and value of cheques cleared in the AACO:
1. Shifting large value payments to an efficient and safe large value payment system;
11
2. Introducing an on line real time express payment service for time critical
payments;
Sub 1 Shifting large value payments to a large value payment system The most effective
way would be to shift large value and time critical payments to a large value
payment system, preferably an RTGS system that complies in full with the Core
Principles for Systemically Important Payment Systems. Large value cheques are
especially initiated by the government and the banking industry itself. After the
new RTGS system will be established a code of conduct could be agreed under
which the National Bank of Ethiopia, Commercial Banks and the Government will
not issue any longer cheques above a certain specified amount or will not issue
any cheques at all. For specified categories of large value payments, for instance
for transaction in the inter-bank financial markets, no cheque will be used under
any circumstances. In the aforementioned situation the payments have to be settled
directly in the new large value system.
Sub 2 Express payment services for time critical payments Time critical payments as
they are now cleared and settled via the so-called “special cheque procedures”
could possibly also be settled on line real time via a so called express payment
service facility 8 for customers in the new large value environment. Such a facility
opens the possibility to customers to request their bank to arrange an immediate
final settlement of the payment with notification to the beneficiary and the payer
by telephone or SMS. This kind of service makes it possible to arrange delivery
versus payment in the trading sector or in the industry. Immediately, on the
notification of the receipt, the goods will be released by the seller. It can even be
arranged that the payer will be notified by the bank of the seller by telephone or
8
This kind of services is in place in certain countries for instance the Netherlands and in Hungary
12
SMS after the payment is received and providing him with a code or password that
can be used to pick up the goods at the warehouse.
There are two ways to initiate the express payment: the first possibility is that it is
initiated by the payer, requesting his own bank to make an express payment via the
large value system with telephonic notification to the beneficiary of the receipt, for
instance to release goods such as cars etc that are bought (credit push). The
request could be made by using a special credit-transfer order form that is
delivered to the bank, or by using telephone, SMS or internet to send in the order
to the bank. The bank of the payer is obliged to execute the payment immediately
and same day funds for the recipient should be ensured.
The other method is using the present debit pull. In this case the present special
cheque procedure will be changed and cheques presented by the beneficiary to his
bank for quick settlement shall, after being presented to the bank of the
drawer/payer and after being honored by the receiving bank, be settled by the
receiving bank via the express payment facility in the RTGS-system to ensure a
final payment with same day funds. After having received the payment, the bank
of the beneficiary will immediately credit the account of the beneficiary in his
books and notify his customer. In both ways the present credit risk in the special
cheque procedure is eliminated while also the turnover in the AACO will possibly
decrease substantially.
Sub 3 Developing alternative retail payment instrument A third way to reduce the
amounts of cheques is to introduce alternative retail payment instruments, such as
credit transfers, payroll schemes, direct debits etc. Developing such products will
not only reduce the risk in the present cheque clearing by replacing cheques but is
also a goal on its own. The new payment instruments will bring down costs for the
banking sector and their customers, shorten the settlement period and reduce the
amount of float in the infrastructure. Due to the cumbersome clearing and
settlement procedures, the cheque is for all parties involved the most time
13
consuming and expensive retail payment instrument to fulfill a payment obligation.
The introduction of a broad range of other payment instrument will satisfy better
the needs of the users due to their convenience and shorter settlement time of these
instruments. Alternative retail payment instruments will also influence the
attractiveness to open a bank account for special groups (see par 4.2). Last but not
least, alternatives for the cheques will promote the trust of the public in non-cash
payment instruments since the confidence in the cheque in Ethiopia is low due to
the relatively high amount of bounced cheques.
In order to reduce the risks in the existing infrastructure it is recommended to shift all
large value and time critical payments which, at present, are cleared and settled via the
AACO to a new large value payment system and to develop alternatives for cheques in
the retail area (option 2). The new large value payment system should clear and settle on
a real time gross basis (RTGS) and should fully comply with the Core Principles for
Systemically Important Payment Systems. If the volume and value of the cheques to be
cleared in the AACO still remains large, measures have to be taken to reduce the risk in
this system and to ensure the timely settlement.
14
However, access to payment services in rural areas is almost non-existent at the moment
since most of the branches of commercial banks are established in more densely
populated centers and other providers of financial services such as the MFI’s are not
connected to the payment infrastructure. The following measures could be taken to
enlarge the access to payment services:
1. Connect the MFI’s to the inter-bank payment infrastructure and promote the
development of payment services in this sector that fits the need of the rural
population. Connection of the MFI’s and development of payment services within
the MFI’s would broaden the outreach of the payment system substantially. MFI’s
have around 2.2 million customers and that would broaden the customer base for
payment services in potential from 3.4 million to 5.6 million, reaching around one
third of all households. It will also bring forward that the rural area are covered by
the new NPS.
2. Develop payroll schemes and start as soon as possible with payroll schemes for
government employees. If government employees would open an account to
receive their wages via a bank account, the customer base could grow around 10%
and even more if also large government enterprises and social benefit and pension
schemes are involved in the promotional action. In most western countries payroll
scheme have brought forward an exponential grow in the number of bank clients
and in some countries, at present, almost all households have access to banking
services. However, this promotional action of payroll schemes will only be
successful if banks offer terms and conditions for account holders and payment
services that are attractive for the employees involved in these payroll schemes.
Otherwise, there might be a tendency for the new customers to withdraw
immediately the full amount of their wages, the moment they will receive it in
their account. This has happened in some countries in Latin America.
3. The development of efficient bill payment facilities might be convenient and thus
attractive for customers. At present, they have to go in person to the tellers of
utility companies, insurance companies or the government to pay their bills or
taxes. This might be a time consuming activity since long waiting queues may
15
exist on days when everybody has to fulfill his payment obligations. Opening of a
bank account and to pay recurrent payments by using standing orders or direct
debits could save a lot of time for customers. These payment instruments will
reduce drastically the processing costs for banks and the collecting costs for
companies receiving the payments.
5. Develop retail bank products for households such as housing loans (mortgages),
consumer credits etc. In these cases the consumer will normally open a bank
account or an account with an MFI on which his salary is paid in etc.
6. Broaden the existing branch network and reduce the traveling time to visit a
branch of a bank or an MFI. At present in the rural area some customers have to
travel more than 20 kilometers.
Comments: With respect to the linking of the MFI’s to the central clearing and settlement
infrastructure there are three possible solutions:
(i) to connect the head offices of MFI’s to a central inter-bank clearing and
settlement system for retail payments and give the head offices the possibility
to open an account with the NBE for settlement purposes;
(ii) to establish a central service organization for MFI’s that connects the MFI’s to
the central clearing and settlement infrastructure, routing the payments to the
individual MFI’s, support them with the development of in-house payments
services and offers liquidity management services to the MFI’s. The central
16
service organization will participate in the payment infrastructure for retail and
large value and opens a settlement account with the NBE;
(iii) the implementation of a two tiered system in which the MFI’s will be
connected via one or more commercial banks that act as clearing member(s).
In order to achieve that in EFY 2010 around two third of the households have access to
payment and other banking services an active strategy should be developed that includes
the connection of MFI’s to the payment infrastructure.
Payment systems is all about network economies and the benefits for all parties will be
the largest if the network is as large as possible and, ideally, covers the whole country.
However, the present outreach of the electronic networks of individual banks is still
limited since only a minor part of the branches are connected to the core banking systems
of their head office 9 , especially outside Addis Ababa. Furthermore, at present, the
payment infrastructure in Ethiopia is heavily fragmentized. The networks of the different
banks are not inter-connected via an efficient inter-bank clearing and settlement structure
for retail payments. Although, it is possible for some customers to send a payment to a
customer of another bank, this transfer is extremely cumbersome due to the paper based
design of the Bankmaster system of the NBE that will be used for inter-bank settlement
of the payment. Due to the design of the latter system no straight through processing
(STP) is possible, even if both involved bank are able to receive and to process electronic
funds transfers.
9
Core banking systems are applications responsible for processing and posting transactions in the domain
of payments, current and saving accounts, loans and securities. They perform current and deposit
accounting, maintaining loan accounts, holding securities positions and clearing payments. Core banking
systems normally support modern payment facilities such as Electronic Funds Transfers (EFT), Automated
Teller Machines (ATM), Electronic Funds Transfer at Point of Sales (EFTPOS) and e-banking and form
the interface with inter-bank clearing and settlement systems outside the bank for instance a local RTGS, an
Automated Clearing House (ACH) or a Central Switch for card transactions
17
Also the existing networks for ATM’s and POS terminals are not connected and the
network of an individual commercial bank cannot be used by clients of other banks.
To realize economies of scale, support the needs of the users, enlarge the convenience for
customers and have in place a payment infrastructure that covers the whole country:
• The networks of the different banks should be improved. Banks that do not have a
core banking systems should implement one. Where necessary the existing core
banking systems have to be upgraded to ensure speed, quality and availability;
• The networks should be extended by connecting all the branches to the core banking
systems of their head office;
• The networks of the different banks should be connected via an efficient inter-bank
clearing and settlement infrastructure and the interoperability of the networks of
ATM’s and POS terminals should be ensured.
18
5. Business Process Modeling and Architecture in the New NPS
5.1 The central role of electronic data exchange in the new NPS
Data exchange between the system providers and the participants in the systems
At the moment, in Ethiopia electronic data exchange is not used in the infrastructure for
clearing and settlement of inter-bank payments. The clearing of cheques is fully manual
and paper-based, including the link between the AACO and the Bankmaster system, the
large value payment system of the NBE. Also the NBE Bankmaster system itself is fully
paper based. Participants (commercial banks and government agencies) have to send in
payment orders via letter of instructions. Information on settled incoming and outgoing
payments and balances in the account at the end of the day is sent by the NBE on the
following morning to the participants also on paper.
In order to enhance efficiency, reduce costs and enlarge speed in modern large value
payment and securities settlement systems, communication between the system provider
and the participants in the system is based on electronic data interchange in standardized
formats sent through public data transmission networks.
In the clearing and settlement of retail payments too, internationally electronic data
exchange is used more and more to exchange information between the system provider
and the participants and to send in payment orders for inter-bank clearing and settlement.
In order to speed up the clearing process electronic data exchange is also used in the
clearing and settlement of cheques to exchange information on cheques presented to other
banks (Electronic Cheque Presentation). Cheques but also other paper based payment
orders are for that purpose captured in electronic formats via so called Optical Character
Recognition (OCR) or Magnetic Ink Character Recognition (MICR) techniques. In some
countries even an electronic image of the cheque is exchanged instead of the exchange of
the physical cheque.
19
Policy recommendation with respect to electronic data exchange between banks and
system providers in the new NPS
Electronic data exchange should be central in the new NPS in order to:
(i) enhance efficiency in the clearing and settlement;
(ii) reduce the settlement period;
(iii) promote straight through processing; and;
(iv) allow banks to receive on line real time information.
In the large value and securities settlement area, information on balances and for
reconciliation purposes should be exchanged via standardized electronic messages and
the present paper based payment order in the large value system of the NBE should be
fully replaced by an electronic funds transfer. Also in the retail area the exchange of
paper should be reduced as much as possible for inter-bank clearing and settlement.
In the new NPS environment customers will still be able to use paper based payment
orders and cheques. They can still send in credit transfer orders or cheques by post or
deliver them directly to his or her bank for processing and collecting. The bank is
responsible for the conversion into electronic formats for inter-bank processing if, in case
of a credit transfer order, the beneficiary has an account with another commercial bank
or, in case of a cheque, the issuer of the cheque has an account with another bank.
However, customers should have also the possibility to use public telecommunication
channels to send in electronically payment orders to their bank and to get electronically
information on payment flows and balances in their accounts (inquiries). These
communication channels will be, among others, telephone, SMS and internet. Also
ATM’s could be used to initiate a credit transfer by the customer. To reduce costs and to
offer convenience to their customers, some banks in Ethiopia are already implementing
this kind of facilities and establish electronic bank networks that make use of the
aforementioned communication channels for exchange of information between
10
Or between other licensed payment service providers and their customers
20
themselves and their customers. At present these communication channels are not yet
used for sending in payment orders but it is expected that this facility will be
implemented in the near future as e-banking and e-commerce will develop.
Policy recommendation with respect of data exchange between banks and their
customers in the new NPS
It is recommended to allow customers to use as well as paper-based as electronic funds
transfers in the new NPS. Whereas paper-based documents have to be converted into an
electronic format for inter-bank processing, it is recommended to standardize the paper
forms used by the clients in such a way that the information can be captured easily and
convert into electronic formats using Optical Character Recognizing or Magnetic Ink
Character Recognition technology.
In case of electronic data exchange minimum standards should be set for authenticity,
integrity and confidentiality and access controls. Fraud or other problems in an electronic
network of one bank can easily deteriorate public confidence in the whole payment
infrastructure even if other banks may use a far higher level of security. These so called
“negative third party effects or spillovers” can be avoided by setting minimum security
standards. Bank networks should also be protected adequately against unauthorized
access and measures should be taken to prevent phishing 11 .
At present, the clearing and settlement of large value via the NBE Bankmaster system is
fully centralized. Only the head offices of the different commercial banks have opened a
settlement account in the books of the NBE. A centralized system supports liquidity
management within a commercial bank and supports the execution of monetary policy.
For that reason also in the new NPS the clearing and settlement of large value payments
will be based on a centralized clearing and settlement system located at the premises of
11
Phishing is a fraudulent process of attempting to acquire sensitive information such as usernames,
passwords and credit card details from the customers using different techniques, for instance using fake
emails and websites to fool users/customers and give them the illusion that they communicate with their
bank
21
the NBE in Addis Ababa. Only head offices of the commercial banks and government
agencies will be connected to the new Real Time Gross Settlement-system (RTGS) 12 .
12
Depending on the decision to be taken possibly also MFI’s might be given access (see par. 4.2).
22
A centralized clearing and settlement infrastructure for the clearing and settlement of
other retail payments than cheques is preferable since:
1. The majority of commercial banks (eight out of twelve banks) in Ethiopia has
already implemented centralized internal systems by implementing a core banking
system at the head offices level and is in the process to connecting the branches to
the central system. Most of the other banks will follow soon;
2. A centralized structure facilitates central liquidity management. Banks can
concentrate their liquidity in the settlement accounts held with the NBE and
automatically liquidity shortages in some branches are compensated by surpluses
in others. For an individual commercial bank a lower level of liquidity is
sufficient. This will be in line with the present situation where only head offices
have opened settlement accounts with the NBE;
3. In a decentralized structure the branches (or regional head offices) have to open
an account with the regional branch of the central bank for settlement purposes.
However, the NBE has no branch network;
4. Central liquidity management is more cumbersome for commercial banks in a
decentralized design and might complicate also the execution of monetary policy;
5. A centralized design enlarges the grip of the bank management on their branches
and promotes the availability of adequate and accurate management information
and information for banking supervision and monetary policy;
6. Banks are connected via their core banking systems in their head office connected
to SWIFT 13 , allowing them to receive remittances send in via the international
correspondent network and distribute them to the customers of their branches via
the internal network. Since branches do not have a connection to SWIFT, in a
decentralized network internal payments including remittances have to be cleared
and settled via regional ACH-links;
13
Only a very few specialized branches of the largest banks, normally not more than one or two, have a
SWIFT connection, but this is more an exception than a rule since a SWIFT connection is costly
23
7. A decentralized infrastructure is more costly to implement since multiple
(regional) systems have to be established. The system is also more complex due to
the regional ACH links and thus more expensive to operate.
Policy recommendation with respect to clearing and settlement structure for retail
payment instruments than cheques
A centralized clearing and settlement structure for retail payments other than cheques
should be established since this fits the Ethiopian situation the best and is the most
economical solution.
24
5.5 Overall architecture of the new NPS 14
If the financial markets emerge and the market for retail payments matures there is a need
for clearing and settlement facilities for:
• Large value and time critical payments (RTGS);
• Clearing and settlement facilities for securities (SSS);
• Switching and clearing and settlement of card operations conducted in ATM’s
and POS-terminals (Central Switch);
• Clearing and settlement of cheques (Cheque Clearing);
• Clearing and settlement of all other retail payment instruments (ACH).
The RTGS-system settles all large value payments on a gross basis. The RTGS forms the
heart of the infrastructure and all other systems settle their payment flows in this system,
either on gross or on a (multilateral) net basis. The Central Switch processes card-based
inter-bank operations. It is connected to all ATM’s and POS-terminals of the different
commercial banks and the system switches requests for authorization automatically to the
core banking system of the bank where the cardholder has its account. It also calculates
the commission banks owe each other for the use of the facilities of other banks and,
depending on which option is valid, calculates the net balances resulting from these
operations and sends this to the RTGS for settlement. The cheque system clears and
settles cheques either on a centralized basis using cheque imaging or as a system in which
the central cheque clearing system is linked to a set of regional clearing centers (see
paragraph 5.5). The ACH clears and settles all other retail payments. Settlement normally
takes place on a multilateral net basis at a designated time(s) during the day but could
also be executed on a batch basis with each batch settled gross. The Securities Settlement
System is connected to the RTGS to settle the cash leg on a delivery versus payment
(dvp) basis in which delivery of securities occurs, if and only if a payment takes place
and vice versa. Clearing and settlement can be executed on a netting basis, both on the
securities side and on the cash side (net-net), on a gross basis on the securities side and on
14
This paragraph is taken over from Dr. Leila Elmasry and Eng Vladislav Babin, “Phase 2:, Technological
Design of the NPS”, Addis Ababa, February 2009, page 6-12
25
a net basis on the cash side (gross-net) and on a gross basis as well on the securities side
as on the cash side (gross- gross).
In the stand alone option there are specialized entities for the clearing and settlement of
card payments, cheques and other retail instruments. Most European countries have
adopted this option, because the volume of transactions in each system is extremely high.
This results from a percentage of account holders close to 90% of the population as well
as laws regarding the mandatory use of scriptural payment instruments for most
transaction categories.
26
The advantages of this stand alone architecture for retail payments are:
The total independence of the various modules, which facilitates their
implementation in a phased way;
This independence allows settlement of a given category of cleared payments
even in case of failure of the other set-ups, provided that the settlement system
(RTGS) is in operation.
Option 2: A central Switch that clears all card payments and an integrated ACH for all
other retail payments
In this option there is only a specialized clearing and settlement system for card payments
while all other retail payment instruments are cleared and settled by the Automated
Clearing House (ACH). In Africa, Libya and Algeria and the eight West African
countries managed by BCEAO have adopted this structure. It is also in place in the
United States of America and in some European countries.
27
The advantages of this global architecture are:
The separation of cards operations from other retail payments can be justified by
the proper nature of these operations that usually need faster settlement. It is to be
noted that even though clearing balances of card operations are calculated by the
Switch, the operations still need to be sent to the banks in order for them to post
them to their customers’ accounts;
The cost of one of the systems (that of check clearing) is eliminated, as well as its
management effort;
Banks have one less telecommunications link to set up and RTGS receives one
list of net balances to settle for retail payments (except card operations) instead of
two.
The disadvantages are:
Cost: two separate configurations (one for the cards and one for all other retail
payments categories) may not be justified by the volume of transactions in
Ethiopia;
Management effort: two systems have to be operated and managed separately;
28
Telecommunications requirements: in addition to the link with the RTGS and the
SSS, participating banks need to have links with two different clearing systems;
Load on RTGS: The RTGS receives two separate lists of net balances to settle, in
addition to the exchange with the SSS.
The fact that check operations are combined with other retail instruments cannot be
considered as a disadvantage.
Option 3: A fully integrated clearing and settlement infrastructure for retail payments
In this option all payment instruments are cleared by one entity that calculates a
settlement matrix on a multilateral netting basis and sends the clearing results to the NBE
for settlement. The Central Switch for Card payments concentrates on routing the
requests for authorization and verification to the bank of the cardholder and on the
calculation of the interchange fees bank owe each other for the use of ATM’s of other
banks. Most African countries have adopted this structure in order to reduce the cost and
management effort. In addition, it represents the present trend in Payment System design.
29
The advantages of this architecture are:
One single list of net balances is sent to the RTGS for settlement, which relieves
the banks from having to watch their liquidity several times during the same
business day and the system itself to have interfaces with several others;
The card operations switch’s functions are reduced: the system would switch
request for authorization between the card processing systems of the commercial
banks involved. It only calculates the interchange commissions and sends the
operations and the commissions to banks’ Management Information System
(MIS). The card transactions can either be sent to the Clearing system directly
from the card switch after pre-processing (calculation of interchange
commissions) or the transactions of clients of other banks conducted in the
network of a commercial bank could be sent by the owner bank itself together
with other retail payments;
In terms of cost, system management effort, telecom requirements and load as
well as RTGS performance and banks’ treasurer liquidity management effort, this
architecture is the most optimized.
Policy recommendation with respect to the overall architecture of the new NPS
In a mature market for retail payments a fully integrated architecture for retail payments
is the most adapted to the Ethiopian environment and the most economic.
30
5.6 The communication network 15
To exchange data electronically in the new National Payment System between the system
provider and the participants in the NPS there are two options: (i) to build a proprietary
network or Virtual Private Network (VPN); or, (ii) to use the existing SWIFT network.
A VPN can be used to separate the traffic of different user communities over an
underlying network using leased lines or the public telecommunication facilities via
ADSL and dialup connections. Normally, for clearing and settlement activities, a VPN
uses strong security features such as restricted access, encryption and other measures to
ensure integrity and authenticity. A VPN can be used for different clearing and settlement
activities, such as large value payments, transactions in securities, card payments,
cheques and other retail payments between banks (interbank), as within a bank (intrabank
or inhouse clearing and settlement). It can also be used for other communication purposes
between banks and the central bank, between commercial banks and between a head
office and its branches for instance for regulatory reporting activities, inquiries and
updating of central databases of the credit information bureau etc., making the initial
investment more cost-effective.
15
This paragraph is a summary of the report of Dr. Leila Elmasry and Vladislav Babin, “Phase 1,
Assessment of the Technology Situation and Recommendations”, p 30-44
16
At present two banks do not have a direct connection and make use of the SWIFT service bureau
31
The advantages of the SWIFT-network are that it is an existent network that is highly
secure, reliable and has implemented standardized payment messages. The disadvantages
are that the use of SWIFT is costly; next to a service fee, a message based fee has to be
paid, whereas in case of a VPN prices can be negotiated with the telecom provider.
SWIFT
National Bank Commercial Bank
Commercial Bank
Bank Main Office SWIFT CBT SWIFT CBT Bank Main Office
RTGS
Especially, for retail payments where volumes are high but the average value low
transaction fees forms a barrier for the use of SWIFT. The SWIFT-network is also less
flexible than a VPN. A VPN can not only be used for a broad range of settlement services
and other communication needs, it can also be used for a broad range of communication
services such as telephone, email, video conferencing etc.
32
An additional complicating problem for the use of SWIFT is that government entities are
not connected to SWIFT. At present around 560 government agencies have an account in
the large value payment system of the NBE.
The communication system provides connections between the different systems and
between the participants and the different systems. With respect to latter the architecture
of the VPN can be based on:
• Centralized access points;
• A network of decentralized access point.
VPN with centralized access points and centralized communication between system
providers and participants
In the centralized access design the architecture of the VPN is characterized by the
provision of one access point for each bank to each of the different systems. Normally,
the head office where the central processing center is located is connected via the
communication network to these systems. Branches send in their payment or securities
settlement order via an intra-bank network to the head office and the head office
conveyed them to the relevant system (RTGS, ACH or SSS).
33
The centralized access design makes the VPN relatively easy to build since it connects
only entities located in the capital and the necessary investment are relatively low.
However, the effectiveness and the outreach of the NPS is in this design fully dependent
on the performance of the intra-bank communication networks of the individual
commercial banks (speed, number of branches connected, quality of this networks etc.)
and of the quality of their core banking systems.
The centralized access architecture has been adopted by most European countries and the
USA where commercial banks have advanced intra-bank networks and core banking
systems.
Architecture of the VPN with decentralized access points and direct communication
between clearing systems and branches of banks
In the VPN design with decentralized access points there are several regional access
points to the system. They can be set especially in the cities with most payment activities,
but can also be located at strategic points in the rural areas to connect the MFI’s. Banks
head offices and branches can link to the geographically closest access point to send their
34
operations to the ACH. No processing occurs at the access points, which are just facilities
to reach the system. For instance all retail payment transactions are sent directly by the
branch to the ACH to be included in the calculation of clearing balances, which are in
turn sent by the ACH to the RTGS for settlement. Although, branches can directly
communicate with the ACH and maybe with the SSS if there might be a need, the
settlement of their transactions will still be settled via the account of their head office
with the NBE (central liquidity management).
In this design it is not mandatory that banks already have implemented an intra-bank
network or having connected all their branches to their head offices. For the time being,
branches, not connected to their head office, will submit their operations to the clearing
system through a link established with the closest access point. If the telecom link
between bank branches and the access point fails, they can present their operations for
clearing on physical media at the access point. Head offices of the banks in Addis are
linked to the system through Addis Access point (which is most probably located at the
premises of the NBE).
The advantages of the VPN architecture with decentralized access point are:
• It reduces the requirements in terms of telecom links capacity and performance;
35
• It does not require that all banks have installed a VPN for intra-bank
communication between branches and the head office. Therefore it creates more
flexibility for the banks and takes into account that at present not all banks have
an intra-bank network in place or, if there is a network, not all branches are
connected;
• Banks and other payment providers can still opt for the time being for a fully
decentralized organization in which their branches send the operation directly to
the clearing system in stead of sending them via the head office as will be done in
a centralized commercial bank organization;
• Country wide coverage can be achieved more faster if adequate and affordable
telecommunication and electricity facilities are available in all parts of Ethiopia
and will not be subordinate to the connection of branches to their head offices;
• If banks have an intra-bank network in place the NPS communication network
can be used as a backup for the communication between the head office and the
branches;
• Banks that chose for a centralized banking organization and want to install an
intra-bank network or need to upgrade their existing network can opt to use this
NPS-network for the communication between the branches and the head office in
stead of building or upgrading their own VPN;
• It might strengthens the negotiating position of the banking industry to achieve
better and affordable telecommunication services from ETC if the network is used
also for internal communication between head offices and their branches;
• Bank branches or other payment providers with low volumes of operation for
which a telecom link with the access point might not economical could be
allowed to present their operations on physical media to the access point where
they are conveyed to the clearing and settlement system.
The disadvantage of this architecture is that the network is more costly due to the costs of
servers to be installed on the access points.
36
The VPN design with decentralized access points is especially adopted by countries
where the NPS is still in a developmental stage and the telecom facilities are insufficient
such as the eight BCEAO countries, Egypt and Tanzania.
37
6. Outline of the Strategic Plan
Taking into account the objectives, mission statements, the overarching vision, strategies
and the recommendation with respect to centralization and the architectural design the
1. Adaptation of the legal framework and the upgrading of the infrastructure for
telecommunication and other utility services to ensure an environment that is
conducive for the NPS;
3. The implementation of a Real Time Gross Settlement (RTGS) system for large
value and time critical payments;
4. The introduction of a broad range of new payment instruments and the working
out of a strategy to develop the market for retail payments and the development
of a plan to enlarge the access to banking and payment services in Ethiopia;
6. The modernization of the clearing and settlement system for cheques by: (i)
introducing standardized cheques with MICR lines; (ii) electronic cheque
presentation; and, (iii) improvement of the facilities for clearing of cheques
38
issued outside Addis Ababa either by introducing cheque imaging or a system of
regional cheque clearings;
In the strategic plan there is a need for the following systems and facilities for inter-bank
clearing and settlement:
5. Facilities for inter-bank clearing and settlement of all other retail payment
instruments;
39
The modernization of the NPS requires large investments in inter-bank clearing and
settlement facilities, building up of an infrastructure for ATMs and POS terminals,
improvement of the payment processing systems within commercial banks and expansion
of the branch network. Furthermore, investments (including promotional campaigns) are
needed to establish a broad range of payment instruments. Given the scarce resources in
terms of available staff and funds priorities have to be set and there is a need to spread
out the investment over a longer period.
Another problem is how to recover costs in inter-bank clearing and settlement systems.
Experiences in other countries show that it will be difficult to recover the costs in new
systems in the first years and initial losses will arise. However, normally systems should
reach the break-even point after three or four years and should be able to recover also the
initial losses. Due to: (i) the rudimentary stage of the present infrastructure for retail
payments in Ethiopia; (ii) the underdevelopment of the physical and telecommunication
infrastructure; and, (iii) the small part of the population that has opened a bank account at
the moment, recovering of costs will take time. Reaching the break-even point may even
take the full period that is set for the modernization project.
Especially, recovering costs in the clearing and settlement facilities for the new retail
payment instruments such as credit transfers, direct debit, standing orders, payroll
schemes etc. will be difficult, since these products have to be developed first. In this
context a chicken and egg problem may arise: the development of payment instruments
and the market for retail instrument is impossible if no clearing and settlement facilities
exist. However, the exploitation of the settlement facilities will be extremely costly
during the developmental stage when the turnover will be very low and underutilization
cannot be avoided. This brings forward a tendency to postpone the investments in
clearing facilities.
The necessity to reduce or spread the investment, as well as the problem how to avoid
large losses due to underutilization in the building up phase, could be tackled by making
efficient use of modern technology. Modern technology makes it possible to use the same
system for processing as well individual large value payments as bulk files of retail
40
transactions destined for the same recipient in an on-line real time mode. This would
eliminate the need to develop separate Large Value and Low Value electronic solutions
for credit transfers and avoid the risks that both the large value payment system and the
retail payment system are potentially underutilized in the period that the new retail
instruments are developed.
The large value system should for that reason be able to handle a facility like FileAct in
which a file (batch) of retail payment is sent within the header the total value and the
number of underlying payments. This file is attached to a (large value) payment order for
the same value as in the header and, after the payment is settled, the file is forwarded by
the system to the receiving bank. The receiving bank should be able to open
automatically the file and process the underlying payments in his internal system. This
facility was develop for the Single European Payment Area (SEPA) and is for instance
internationally used for forwarding and settlement of remittance payments in the
international correspondent network. The solution is also available for use in local
systems. According to the World Bank a large value payment system that can also handle
bulk files of low value payments is for instance in place in Turkey.
An additional advantage is that the facility will allow the integrated ACH to use the
Swift-net for as a contingency facility in case the NPS communication network is down.
17
Hybrid systems use bilateral and multilateral netting to settle periodically payments placed in the queue
of these systems due to insufficient funds in the settlement account
41
Another disadvantage might be that banks have to sort out the outgoing payments per
receiving bank and bundle them in files for the same recipient, like it is now done for
cheques. However, sorting out of the new payment instruments can be executed
automatically since all payments that will be sent in for inter-bank clearing and
settlement are in electronic formats. These formats can be easily sorted out and bundled
by the internal systems of the commercial banks.
42
7. Working out of the Core Elements in the Strategic Plan
Objective
The modernization and updating of the legal framework is an essential prerequisite for
the success of the whole modernization of the National Payment System. Based on a
thoroughly stocktaking and gap analysis, proposals for the amendment of the present
legal framework should be worked out and relevant bills of law should be drafted. Where
necessary and appropriate, secondary laws, such as directives, should be enacted and
contractual arrangements should be put in place to complete a sound, safe and flexible
legal framework that complies with international standards.
43
3. Endorse electronic signature for payment purposes and the use of electronic
data on payments and securities settlement for evidence in courts 18 ;
4. Introduce banking industry wide “general terms and conditions for the use of
payments instruments and the offering of payment services;
5. Establish an efficient and impartial conflict resolution scheme for payments
related issues;
6. Ensure a safe and sound legal basis for clearing and settlement of payments
that complies with the CPSS-Core Principles for Systemically Important
Payment Systems. The legal basis should encompass a finality regulation and
the recognition of multilateral netting;
7. Allow for the introduction of Electronic Cheque Presentation (ECP) and
cheque truncation in order to modernize the inter-bank clearing and settlement
of cheques;
8. Strengthen the arrangements for collateral taking and the enforceability of
contracts in order to facilitate risk management measures in payment systems;
9. Modernize the legal provisions for custody and clearing and settlement of
securities by introducing legal protection of client’s securities against claims
of creditors of a custodian or other third parties;
10. Introduce immobilization and/or dematerialization of securities and the legal
framework to establish a Security Settlement System (SSS) with transfer of
ownership of securities based on book-entry.
18
Often referred to as “Cyber laws”
19
Beginning of January 2009 a legal working group has been established and an international legal
consultant has started work to draft a new legal framework for payments and securities settlement
44
Critical success factor
Timely completion of the new comprehensive legal framework is a critical success factor
for the whole modernization project. The whole project for the modernization of the legal
framework should not take more than one and half year since the new legal framework
should be in place at the end of 2002 20 to support the newly established systems.
Adequate, reliable and affordable utility services are a prerequisite for the development
of a modern payment and clearing and settlement infrastructure. Especially, availability
of affordable and fast telecommunication services in all parts of the country is crucial
since electronic funds transfers will be the heart of the new NPS.
20
Ethiopian calendar, 2010 in the Gregorian calendar
45
7.2 The communication network 21
As recommended by the IT consultants a Virtual Private Network (VPN) shall be
developed to ensure reliable, fast and secure communication and exchange of data in the
New Payment System (see par. 5.6).
21
This paragraph is based on the reports of the IT consultants Dr. Leila Elmasry and Vladislav Babin
22
See Elmasry and Babin, “Phase 1, Assessment of the Technology Situation”, page 36
46
Connectivity
It is strongly recommended that the NPS participants have at least two independent data
channels to connect to the VPN: primary and backup. Primary channel should be at least
an ADSL connection (fiber is recommended for main offices and most important
branches). Dialup should be used for backup only.
Security
Security is of paramount importance for the national payment system. The NPS
communication network should provide adequate isolation and segregation for
participants. Access to the network should be restricted and the network should deny
access from one host to another if not authorized by a security officer. Proper
organization of IP address space in the network is important for convenient and reliable
maintenance of access control lists 23 .
Hosts in the network should be protected by adequate firewall software. While access
restriction serves to avoid unwanted traffic in the network, shielding hosts by firewall is
meant to protect the servers and workplaces against attacks from within the network.
23
For a further elaboration see Elmasry and Babin, “Phase 1” page 37-38
24
Core Principles for Systemically important payment systems, page 41
47
Critical success factors
Since it is expected that NPS-communication network will be implemented and
maintained by ETC as service provider, the performance of the network should be closely
monitored/ supervised by authorized personnel from NBE.
It is important that ETC as service provider ensures the service level required by the NPS
and the availability of the network during 24 hours a day and seven days a week 25 . ETC
should also maintain backup communication facilities for the NPS-network so that failure
in the main line would not leave any participant disconnected from the system. Backup
communication facilities should be tested regularly. The level of services such as
operating hours, guaranteed bandwidth and backup facilities should be specified in a
service level agreement (SLA).
7.3 The infrastructure for large value and time critical payments
Objective
A modern large value payment system should be implemented. The new system should at
a minimum be able to handle large value payments and time critical payments and should
relieve the present cheque clearing system. The system should be based on on-line real
time gross settlement (RTGS).
25
To be online 24 hours during seven days a week is necessary for card processing purposes
48
4. The system should at a minimum focus on inter-bank large value payments and
time critical payments. An express payments facility for the private sector to
replace the present special cheque clearing procedures should be studied and, if
there is a business case, should be introduced. As indicated in the strategic plan,
the large value system should also be able to settle batches of retail payments;
5. Transactions in the new system should be irrevocable and final under all
circumstances;
6. Participants should be able to manage their liquidity effectively and sufficient
sources of liquidity should be available to ensure an effective throughput in the
system;
7. The system should support the execution of monetary policy and other tasks and
internal functions of the NBE such as the execution of Foreign Exchange Policy,
the distributions of banknotes and coins, internal accounting and general ledger
etc.;
8. The operational reliability of the system should be ensured, well structured
business continuity measures should be in place and effective crisis management
should be implemented;
9. Audit trails should be possible for all transactions and reconciliation should take
place at the end of the day;
10. Inter-operability with other payment systems for instance the clearing of retail
payments should be ensured;
11. Inter-operability with the securities settlement systems (SSS) to ensure delivery
versus payment should be a standard facility.
49
be provided in the near future when the new Financial Management Information System
(IFMIS) of the Government will be in place. A smooth transition should be supported.
50
Ownership and Governance
The large value system should be owned and operated by the NBE but a governance
system should be in place that leaves room for regular consultation of the users on the
functioning of the system, fees etc.
Deliveries
In first instance the working group should focus on the technical specifications of the
system and the terms of reference for a bidding procedure.
After the technical specifications and the TOR for a tender procedure have been
completed the working group should:
• Draft information bulletins and organize information meetings with all relevant
stakeholders and the public;
• Conduct an impact analysis of the new system on the functioning of the NBE, the
commercial banks and other participants;
• Coordinate the drafting of the rules and regulations of the system, agreements
and all other necessary legal documents;
• Coordinate the drafting of a code of conduct for participants;
• Coordinate the adaptation of procedures and systems within the NBE;
• Coordinate the adaptation of systems and procedures of participants;
• Coordinate the training of staff;
• Coordinate the implementation, testing and the roll out of the system.
26
Beginning of January the NBE has established a NPS Technology Group
51
7.4 Payment instrument mix and access to payment services
Objectives
Broadening the range of retail payments, the development of the market for retail
payments and enlarging the access of the public to payment services is of utmost
importance for the success of the new NPS.
In the new NPS electronic funds transfers should replace the cheque as the main
instrument. All new payment instruments should be exchanged in electronic form
between banks. New payments instruments that could be developed are:
1. Ordinary credit transfer;
2. Payroll schemes or direct credit;
3. Standing orders;
4. Direct debit;
5. Card payments.
There are already initiatives in the banking industry with respect to some of the
aforementioned instruments. However, for the good functioning of the market there is a
necessity to develop and to standardize the new instruments. Common products with
general legal terms and conditions should be developed to enlarge transparency and to
promote the confidence of the public in the new instruments. For the development of
debit and credit cards operations minimum securities standards should be set.
Also new forms of payment services could be analyzed and the business case for the
introduction of prepaid cards and e-cash should be studied. In this framework, especially,
the use of mobile-phone money services might be of interest, if the amount of mobile
phones in Ethiopia will grow from around 1.8 million to 15 million in the coming years,
as expected by the Government. Mobile-phone money service allows the subscribers to
use their mobile phone to manage a payment account and transfer money to other holders
of mobile phones. Most often, M-banking is based on the prepaid card principle, in which
e-money is stored on the mobile phone by depositing cash at an agent of the operator in
52
the same way as buying prepaid phone balances, or by transferring money to the bank
account of the operator. The money in the bank account of the operator backs the amount
of e-balances on all mobile phones. Subscribers/customers can withdrawn their e-
balances by exchanging them in cash at the teller of the agents of the operator or request
a transfer of the e-balance on the mobile phone to his own bank account, if any. These
schemes are in place in several developing countries for instance Kenya and Pakistan27 .
Development of the market for retail payments and the enlargement of the outreach of
the NPS
As was already pointed out in chapter 4, there is a strong interrelation between the
development of new payment instruments and the development of the market. New
services could enlarge the number of customers substantially and more customers would
enlarge the volume of payments and make economies of scale possible. An action plan to
develop the market should be worked out taking into account the measures outlined in
chapter 4. Initiatives should be worked out with respect to the awareness of the public of
these new instruments. The action plan should also encompass measures to establish
confidence of the public in the new payment instruments.
27
Mobile Banking known as M-banking is a term used for performing balance checks, account
transactions, sending in payments orders etc. via a mobile device such a mobile-phone. In Kenya the
system is called M-PESA. The system in Kenya is not linked to any clearing system. Customer can use
their M-PESA account to buy goods and service from other users, but the most common use of M-PESA is
for long-distance person to person remittances
53
3. Describe the new communication channels, such as internet, telephone, mobile
phone and SMS, that can be used for exchange of information and for sending in
payment orders by the customers;
4. Set minimum safety requirements for all payment products and channels used;
5. Develop common promotional actions to enlarge the awareness of the public and
to promote confidence in the new instruments.
Albeit, that due to the proposed NPS communication network with decentralized access
points the NPS also support a decentralized banking organization with branches that are
not integrated and not linked to the centralized automated payment processes of the head
office, in the longer term, banks with a decentralized organization have to switch to a
centralized organization and should connect their branches. This is not only necessary to
strengthen internal control and management, it is also necessary to be able to effectively
support modern payment instruments and services, such as: (i) an express payment
28
This paragraph is based on Elmasry and Babin, “Phase 1,Assessment of the Technology Situation”,
p. 42-44
54
facility for time critical and large value payments (only head offices are connected to the
RTGS system); (ii) card payments (an efficient interface and automated processing is a
prerequisite to be connected to the switch and far too expensive to install on a branch
level); (iii) an efficient in-house distributions of remittances and payments between
accountholders of the same bank; and (iv) for the introduction of e-banking. Integration
of the branch network will progressively lead to abandon the paper-based exchanges that
cause so many delays and additional costs.
Individual bank should plan carefully how and when to introduce a state of the art core
banking system or to upgrade their present system if necessary, reorganize their internal
payment processes and develop a time schedule to connect their branches. For the
connection of branches they can use the NPS communication network (see par. 7.2) or an
own VPN.
55
To speed up the discussions it is recommended to hire an international consultant with
experiences in the modernization of cheque processing and in the introduction of cheque
imaging.
Automation of the cheque processing is also important for the processing of so called
“cheques on us”, cheques for which both the payer and the beneficiary have an account
with the same bank. The amounts of internal cheques are not known by most of the banks
and the amount of cheques cleared internally by banks might be even larger than the
amounts cleared via the AACO. This leads to a substantial underestimation of the
advantages of standardization and automation of cheque processing.
Within the framework of standardization of cheques the East African Cheque standards
could be adopted (see also par. 7.5).
For the improvement of the clearing of cheques outside Addis Ababa a network of
regional cheque clearing centers could be set up if the feasibility of cheque truncation is
deemed not economically or if the legal barriers for electronic exchange of cheques could
not be removed. These regional clearing centers could be located at the access points of
the NPS communication network. In paragraph 5.3 of this report a possible design of a
regional cheque clearing network is given.
For the clearing and settlement of card payments it is necessary to put in place a central
switch to organize the interoperability of the different networks of ATM’s and POS
terminals. Interoperability ensures that customers of one bank can use the ATM’s and
POS terminals of another bank. At the moment there are two networks of ATM’s while
one bank has a network of around 400 POS-terminals. More banks have plans to install
ATM’s and/or POS-terminals.
There are two options for the connection of the networks of ATM’s and Pos-terminals:
56
1. Each bank owns his own switch and bilateral links are organized between the
financial institutions;
2. A central switch is implemented to which all the ATM’s and POS-networks of
the individual banks are linked;
Of the two options the second option has the most advantages. Under option one a
multiplicity of links would be necessary. This could lead to a complex infrastructure
while it is not ensured that all banks will have access under the same conditions.
57
Based on this study a choice has to be made and the technical specifications and the terms
of reference for a public tender procedure should be drafted to acquire the preferred
system.
The inter-bank clearing and settlement facilities for other payment instruments are
especially used for the settlement of credit transfers, payroll schemes, direct debits and
other bill payment instruments. These facilities are especially meant to handle bulk
payments, i.e. large amounts of low value retail payments.
There are different divisions of tasks possible between the participating banks and the
ACH. Banks can outsource quite a lot of work to the ACH for instance: the conversion of
paper based payment orders into a standardized electronic format that can be processed
automatically and the sorting out of payment orders per receiving bank. In some countries
some categories of customers can send directly their payment orders to the ACH using
special procedures agreed upon between the ACH, the customer and the bank involved.
This is for instance the case for files in the framework of payroll schemes and direct
debits.
In this context attention needs to be given to the business continuity and operational
reliability of the ACH and the protection of the netting to ensure timely settlement even
29
The bank where the ultimate beneficiary have opened an account
58
in the event that one of the participants is not able to fulfill its payment obligations.
Although, clearing and settlement is mostly done on an end of day multilateral netting
basis, other solutions are possible for instance multiple multilateral net clearing cycles
during the day or even multiple cycles with gross settlement of batches of outgoing and
incoming payments of each bank.
An integrated ACH that clears all retail payments including card transactions and cheques
In chapter 5 an integrated ACH that clears and settles all retail payments including
cheques and card payments was recommended. This means that as soon as the decisions
have been taken about: (i) the modernization of the cheque clearing and the way the
networks of ATM’s and Pos-terminals will be connected; and, (ii) the processing and
clearing and settlement of card payments will be organized, the bidding documents for an
integrated ACH can be prepared, even if decisions about the payment instrument mix still
has to be taken. The new ACH should have a modular character in which facilities for the
different instruments can be activated separately. This makes it possible to develop the
market for retail payments bit by bit.
The business and function specifications for an integrated ACH should encompass:
1. The types of payment instruments to be cleared and settled;
2. Life cycle of the operations (presentment, cancellations, rejections, return by the
system);
3. The standardized payment formats to be used;
4. The division of tasks between the ACH and its participating banks;
5. The clearing procedures;
6. The settlement procedures;
7. The procedures for reconciliation;
8. The risk management measures;
9. The measures to ensure operation reliability and business continuity of the
system;
59
10. The ownership, governance structure and operation of the system 30 ;
11. The investment plan and the financing of the operational activities.
Facilities for cross border clearing and settlement can be important, especially, if there
are certain economic arrangements with countries in the region about free convertibility
of the local currencies or specific treaties on free trade areas, monetary and economic
unions etc. However, at the moment, the Ethiopian Birr is not freely convertible and there
exist no explicit trade-arrangements with neighboring countries that need to be supported
by cross border links whether retail or large value.
As long there is no free convertibility of the birr there is no business case for ACH links
with neighboring countries in Ethiopia. But there are also other factors that make such
cross border links for the moment not feasible. The market for retail payments in Ethiopia
is still underdeveloped and non-cash instruments other than cheques that could be cleared
via the aforementioned cross border links have still to be developed in Ethiopia.
Furthermore, the potential amount of payments that could be settled via these links is still
small, since most of the international trade of Ethiopia is with Asia (imports) or with
Europe (exports). The amount of cross border payments with neighboring countries is
30
During the workshop of Mid-March the stakeholders preferred a governance structure in which the ACH
should be owned and operated by the banking sector, while the new RTGS should be owned and operated
by the NBE
60
relatively small and most of these payments will be settled via the correspondent banking
network or in cash. Cross border trading with neighboring countries could be endorsed
more effectively by creating the possibilities to use international debit or credit cards, for
instance Visa or MasterCard. However, to keep options open some future developments
could be anticipated by adopting relevant standardization for payment instruments; for
instance to adopt the East-African standards for cheques and card payments.
At present, it is not allowed to use foreign currency as legal tender in Ethiopia. The
Foreign Exchange Policy directives of the NBE oblige residents to convert foreign
currency in birr within a certain time period. Residents are not allowed to open foreign
currency accounts in Ethiopia. Only Ethiopians living abroad are permitted to open such
accounts. However, the number of foreign currency accounts is still limited and payments
between such accounts are too low to justify clearing and settlement arrangement for
payment instruments denominated in foreign currency, as is for instance the case in
Kenya with respect to dollar cheques.
Clearing and settlement arrangements for inter-bank forex transactions to reduce Herstatt
risk could be arranged but require concentration of correspondent banking business or
settlement of forex transactions via the international Continuous Linked Settlement
System (CLS). In the first option all or at least part of foreign deposits in a certain
currency have to be held with an inter-bank institution in Ethiopia, for instance the NBE,
that will held the counter value on an account with a correspondent bank abroad. In that
case the commercial banks have birr settlement accounts and foreign currency accounts
with the NBE and copies of the large value payment systems could be used to settle
transactions in foreign currencies between Ethiopian banks. By linking the different
systems a payment versus payment (PVP) could be arranged to reduce Herstatt risk.
These kind of arrangements are in place for instance in the Dutch Antilles where inter-
bank transactions in several currencies could be cleared and settled, for instance
61
transactions in US dollars and in Euros. Also some economies of scale could be reached
in this construction with respect to outgoing or incoming cross border payment since the
concentration might enlarge the negotiating power to get better terms and conditions from
foreign correspondent banks.
The concept of a Central Securities Depository (CSD) and the advantages for developing
a market in government bills and bonds outside the banking sector should be studied and
understood by the stakeholders.
Certain aspects of the structure and organization of the Central Security Depository and
of custody arrangements have to be discussed to see what fits the Ethiopian market the
best. These aspects are:
62
7. Links with the large value payment system to ensure Delivery versus
Payment (DVP);
8. The settlement model (gross-gross, gross-net or net-net);
9. Risk management;
10. Cross border links for securities transaction with other countries;
11. Governance structure and ownership of the CSD.
63
In case of dematerialization physical certificates or documents of title which represents
ownership of securities are eliminated so that securities only exist as accounting records.
Some CSDs are allowed to act as a trusted third party. In that situation, participants allow
the CSD, for instance in case of repos, to substitute collateral in the form of one security
for another type of securities with the same value if the original collateral is needed for
transaction purposes. The CSD will in this framework also transfer, automatically, more
securities to the third party collateral account if the market value of the collateral drops
below a certain value.
64
value system of the NBE via the settlement accounts the participants in the CSD hold
with the NBE.
Risk management
Dependent on the choice of the settlement model adequate risk management measures
should be implemented to comply with international standards.
65
Governance structure and ownership
Decisions have to be made about the ownership, consultation of participants, operations
of the CSD and the way costs will be recovered. Since there is no stock market and most
of the securities issued in Ethiopia are government bills or bonds, the CSD could be
commonly owned by the banking industry, the NBE and the Government and operated by
the NBE.
After the terms of reference have been completed and approved the working group
should:
• Draft information bulletins and organize information meetings with all relevant
stakeholders and the public;
• Conduct an impact analysis of the new system on the functioning of the NBE, the
commercial banks and issuers;
• Coordinate the drafting of the rules and regulations of the system and all other
necessary legal documents;
• Coordinate the drafting of a code of conduct for participants;
• Coordinate the adaptation of procedures and systems within the NBE;
• Coordinate the adaptation of systems and procedures of participants;
• Coordinate the training of staff;
• Coordinate the implementation and testing of the new system and the roll out of
the system.
66
7.9 The oversight framework
This module encompasses:
1. Determination of the scope of the oversight policy and the instruments used;
3. Drafting of a mandate and mission statement for the oversight task of the NBE;
67
8. Phasing and Priority Setting: the implementation plan
The project will be financed partly under the Financial Sector Capacity Building Project
of the World Bank. The available donations under these schemes will be used especially
for financing international consultants. The Financial Sector Capacity Building Project
will expire at the end of June 2010. To get approval for the financing of the acquisition of
necessary systems, the strategic plan has to be approved first. Thereupon the technical
specifications for the systems have to be worked out, a public tender procedure to be
organized and a choice between the offers of different system-providers to be made, all
before the expiration date of the Financial Sector Capacity Building project. In that case
the systems have to be implemented tested and taken into operation before that date,
since the last payment in the acquisition process is normally done after it has been proven
that the system functions adequately.
However, the development of the market for retail payments will take time and the
amounts of retail payments to be settled will be low during the developmental stage. For
that reasons it is recommended to set priorities. Systems should not be implemented all at
the same time and, as recommended in par 6.3, efficient use of technology should be
made to combine the large value and retail system in order to facilitate the clearing and
settlement of retail payments during the period that there is no ACH in place and to avoid
large initial losses in the retail payment area. In the retail area the ACH should have a
modular structure and facilities should be activated the moment a payment instrument has
68
been developed and launched, thus creating the possibility to develop the market for retail
payments bit by bit.
The introduction of a card switch to connect the different networks of ATMs and POS-
terminals should also be given high priority and the negotiation between banks on the
interoperability rules and on the design of the switch should be started as soon as
possible.
The card switch will be linked to the integrated ACH to integrate the card operation in the
multilateral netting of all retail payments. However, if an agreement could be reached and
the bidding procedure for the card switch will be launched and the system will be
procured before the ACH is installed the Switch should be able to clear the card
operations itself and send it in for settlement to the RTGS. Integration with the clearing
and settlement of other retail payments will take place the moment the ACH will be taken
into operation.
69
electronic form by the commercial banks and sorting out of the cheques. Based on the
standardization, the second step would be to introduce Electronic Cheque Presentation
(ECP) and to automate the calculation of the settlement matrix. In case of ECP banks
exchange information electronically, either bilaterally or via the AACO, and could
already check whether their clients have sufficient funds in their account to cover the
cheque before the settlement takes place at that day.
Parallel to these steps the business case for the introduction of cheque truncation and
cheque imaging should be analyzed. Cheque imaging could be used to facilitate the
clearing and settlement of cheques issued outside Addis Ababa. If there is no business
case for cheque imaging and cheques have to be exchange physically, a decentralized
system for the clearing of cheques outside Addis Ababa has to be established (see
chapter five).
31
A proposal for the project bureau (project coordinating office) has been drafted by the NBE
32
A legal working group and a NPS technology group were established in January 2009
70
Implementation of the strategic plan
1. Short-Term (2000 - 2003) 33
• Upgrade the legal framework (for more details see the working schedule of the
legal consultant)
• Develop a financial plan for the modernization of the NPS and ensure proper
resource management;
• Discuss the necessary improvements in the telecom infrastructure and the
electricity network and gear to another the NPS development plan and the
development plans for the physical infrastructure, negotiate an affordable fee
structure and service levels;
• Discuss the task and responsibilities of the different stakeholders and service
providers in the new NPS and incorporate this in the strategic plan;
• Develop the business requirements for a communication infrastructure (VPN) that
can be used for large value payments, the clearing and settlement of retail
payments and securities and (as back up) for the communication between head
offices of banks/MFI’s and their branches. Define an adequate security policy and
ensure access control to and confidentiality, integrity, authentication, non-
repudiation, availability and auditability in the network (see the report of the IT
consultants);
• Launch the RFP for the VPN network and negotiate with ETC the building of this
network, the service levels and fees. Conduct a SLA and monitor/supervise the
building of the network and performance thereof;
• Develop the business requirements, draft the functional specifications and procure
and install the equipment for a Real Time Gross Settlement System for large
value and time critical payments to replace the present Bankmaster system of the
NBE. The system should be able to clear and settle also batches of retail
payments;
• Develop a strategy to develop the market for retail payments and a plan to enlarge
the access to payment services;
• Introduce new payment services to the government using the RTGS system;
• Develop a broad range of standardized retail payment instruments next to the
cheque, introduce the possibility to exchange and clear and settle electronic fund
transfer for retail payments (credit transfer orders) via batch files and marketing
and implement payroll schemes starting with the government;
• Find a solution on the ownership of the ATM and POS network (making a choice
between proprietary networks of individual banks or a commonly owned network)
and draft the bidding documents and launch a RFP to procure the system;
• Introduce new core banking systems or upgrade the existing core banking systems
of commercial banks, implement and connect at least 50% of all branches in the
sector;
• Standardize the cheque and introduce MICR technology;
• Introduce electronic cheque presentation (ECP).
33
In the Ethiopian calendar
71
• Draft the bidding documents for the procurement of an integrate ACH.
• Implement an integrated ACH;
72
ANNEX 1
73
of the NBE is fully paper based without proper liquidity management or queuing
facilities. In its present form it cannot fulfill the core function in a modern
payment infrastructure as is normally the case in most other countries;
6. Deficiencies in the AACO, the clearing and settlement system for cheques in
Addis Abba. The volume of cheques cleared in the AACO is rapidly growing.
However, the processing of cheques in the AACO is still fully manual and may
reach in the near future its capacity boundaries. The system is used for large value
and time critical payments and is systemically important but does not comply with
the CPSS-Core Principles for Systemically Important Payment Systems;
7. No efficient inter-bank infrastructure for clearing and settlement of other retail
payment instruments. Payments, for instance credit transfers, from a bank account
in one commercial bank to an account in another bank have to be cleared and
settled via the system of the NBE which is not designed to handle these payment
flows efficiently, bringing forward long delays and high costs. This forms a major
barrier for development of the retail market and the introduction of electronic
funds transfers for retail purposes;
8. No interoperability of ATM and POS networks. Some banks have installed
Automated Teller Machines (ATM’s) and Point of Sales (POS) terminals and
others have plans to do so. At present, the number of ATM’s and POS terminals is
still limited and most of the facilities are located in the capital. The networks of
the different banks are not linked via a central switch and thus cannot be used by
customers of other banks;
9. Limited outreach of the electronic payment networks of banks. Banks have
connected only one third of their branches to their core banking system 34 and four
banks do no have installed such a system till yet. Only clients of a branch
connected to a core banking system can be provided with modern payment
instruments;
34
A core banking system facilitates transfer of money between branches and between accountholders of
different banks. It supports various payment activities such as electronic funds transfers (EFT), the
collection of cheques, cash withdrawals via Automated Teller Machines (ATM’s) and card transactions via
Point of Sales (POS) terminals.
74
10. Insufficient support of the legal and physical infrastructure. Last but not least, the
legal framework, the information and telecommunication (ICT) infrastructure and
the electricity network are not conducive for modernization of the National
Payment System (NPS). The legal infrastructure does not support the introduction
of a broad range of payment instruments, the modernization of the cheque
clearing and the introduction of electronic clearing and settlement systems. The
physical infrastructure for electricity and for ICT-services do not cover the whole
country and the fees for telecommunication services are relatively high and do not
encourage the introduction of modern banking methods such as inter-bank
electronic funds transfers, e-banking and e-commerce. The present fees form a
barrier for banks to connect their branch network to their core banking systems
and for customers to use e-banking devices.
75
ANNEX 2
Objectives
The modernization project should achieve at least the following primary objectives:
1) To provide a variety of payment instruments;
2) To put in place mechanisms and processes that can safely and cost-effectively
support the transfer of money from payer to payee;
3) To manage and minimize risks inherent in clearing and settlement systems in a
cost-effective manner;
4) To put in place an adequate legal and regulatory framework that effectively
support modern payment and securities settlement systems and modern payment
instruments such as electronic funds transfers, card payments etc;
5) To establish an effective oversight framework for payment systems.
Expected results
Within this framework of objectives the ultimate goals of the project could be set as:
1) To establish a good balance between co-operation and competition in the banking
industry and allow private customers and enterprises the freedom to choice and to
use their own bank for all their payment activities;
2) To broaden the access of the public to banking services and especially to payment
services;
76
4) To implement a modern system for large value and time critical payments,
preferable on a Real Time Gross Settlement (RTGS) basis, that relieves the
present cheque clearing. The large value payment system should comply with the
Core Principles for Systemically Important Payment Systems, support the
execution of monetary policy and allow participants to manage the liquidity in
their account efficiently and to use telecommunication channels for the exchange
of information and sending in of payment orders;
5) To automate the processing of cheques by introducing MICR technology and
broaden the scope of the clearing facilities to ensure country wide coverage;
6) To implement an efficient and safe infrastructure for inter-bank clearing and
settlement of all other retail payment instruments;
7) To achieve inter-operability of the different networks for ATMs and POS-
terminals of individual banks or to put in place a network of ATM’s, commonly
owned by the banking industry with open access for all financial institutions that
are allowed to offer payment services;
8) To broaden the outreach of the electronic networks of individual banks. To achieve a
payment infrastructure for electronic funds transfers that cover the whole country, the
range and the operational reliability of the electronic networks of individual banks
should be extended and improved. Where necessary core banking systems should be
introduced or the existing core banking systems of individual commercial banks
should be upgraded. The branches all over the country should be connected and the
availability, capacity and business continuity procedures and facilities should be
improved.
77
Annex 3. Project Management and Governance
The governance and management structure should ensure involvement of all relevant
stakeholders and well structured discussions on the present and future needs, goals,
objectives, principles and measures to be taken. It should ensure adequate decision
taking on the appropriate level and commitment of all involved parties for the
execution thereof.
Constitution
The National Payment Council consists of:
78
7. A representative of the Remittance Service Providers;
8. The chief Clearing and Settlement Officer of the Ethiopian Commodity
Exchange;
9. A high ranking official of the Ministry of Finance & Economic
Development (MoFED);
10. A high ranking official of the Federal Inland Revenue and Custom
Authority;
11. A high ranking official of the Ethiopian Postal Service;
12. A high ranking official of the Ethiopian Telecommunication Agency;
13. A high ranking official of the Ethiopian Telecommunications Corporation;
14. The General Director of the Ethiopian Information Technology
Development Agency;
15. General Manger Ethiopian Electric Power Corporation;
16. Chairman of Ethiopian Chamber of Commerce;
17. A high ranking official from Pension and Social Security Authority.
Chairman
In line with international practices the National Payment Council should be chaired by
the Governor of the NBE.
79
Constitution
The Steering committee should be formed by:
Chairman
The Steering Committee should be chaired by the Governor of the NBE.
Conflict resolution
In case of difference of opinions on critical issues with respect to the reform process,
which could not be solved by consensus building, the decision shall be made by voting.
80
The Project Bureau
The project bureau should support the project director and the project team, is charged
with al the administrative tasks as filing, reporting, organizing meetings, workshops,
providing back ground information, conduct analysis, build a database on the
infrastructure etc. and the head of the project Bureau will join the meetings of the
different working groups.
The Technology Working group should (i) work out the business requirements and
technical specifications for the systems for large value and retail payments and the
settlement of securities, in which the interoperability and connectivity of these systems to
achieve settlement in central bank money is ensured and (ii) draft the technical
specifications of the communication network. It shall organize (iii) the public tender
procedure to acquire these systems, (iv) define the selection criteria and the selection of
the provider(s); (v) organize the implementation and roll out of the new infrastructure
(including coordination of the adaptation of procedures and systems of the NBE and of
participants and the reorganization of the IT –infrastructure within the NBE if necessary)
and (vi) formulate the procedures for acceptance of the systems to be delivered and the
testing thereof and organize, in cooperation with the system provider(s), the training of
staff to operate these systems. The working group should pay special attention to (vii)
risk management and liquidity management in the infrastructure; and should (viii) carry
out impact analysis for the different stakeholders. Finally the working group should draft
(ix) clear descriptions of the functioning of the different systems including a stylish
diagram of the lifecycle of payments, the, message processing, validation and checks to
which messages are subjected, risks participants are exposed to and should give a
81
overview of the risk management in the systems, crisis management etc and organize the
dissemination of information among participants and the public. .
The Policy, Standardization and Bancarization Working Group should: (i) develop the
policy for retail payments in Ethiopia, (ii) make proposals to enlarge the access to
banking services in general and to payment services in particular; (iii) develop new
payment instruments taking into account the business needs and requirements in the
market; (iv) set inter-bank standards; and, (v) make proposals to development the market
for these instruments (banking industry-wide marketing actions, programs to enlarge the
awareness of and confidence of the public in the new payment instruments etc.). The
instrument mix should encompass at least ordinary credit transfers, payroll schemes,
direct debits and card payments.
The Operation Working group should focus on: (i) the modernization of the AACO and
a country wide coverage of the cheque clearing; (ii) inter-bank clearing and settlement
arrangements for other payments instruments such as credit transfers, payroll schemes
and direct debits etc.; (iii) clearing and settlement of card payments and the
implementation of an automated switch for ATM and POS-transactions; (iv) the
integration of the different clearing and settlement arrangements for retail payments into
one overarching entity or ACH; (v) the functioning and scope of this system; (vi) the
infrastructure for registry and clearing and settlement of securities; (vii) the need for and
structuring of cross border arrangements for payments and securities settlement; work out
(viii) the roles and responsibilities of the different stakeholders in the payment reform;
make proposals for: (ix) the governance structure for the different systems; fee structures
etc.; (x) the development of a money market and (xi) achieve inter-bank agreements on
codes of conduct and settlement times.
82
The Legal Working group should focus on the necessary adaptation in the legal
framework to accommodate the modernization process and in working out of rules and
regulations and all other necessary legal documents for the systems to be developed.
Constitution
Since the NPS is a national asset the members serving on the various teams should be
recruited from all key stakeholders. Also the chairman/woman could be recruited from
outside the NBE. Good team selection and continuity is critical for the success of the
project.
83
ANNEX 4
Glossary
Term Definition
Acceptor any trading or service establishment that accepts, on its own behalf
or on behalf of its network, the payments of goods or services via an
electronic money instrument.
84
typically take the form either of advances or overdrafts on an account
holder's current account which may be secured by a pledge of securities
(also known as lombard loans in some European countries), or of
traditional rediscounting of bills.
Central counterparty an entity that is the buyer to every seller and seller to every buyer of
a specified set of contracts, eg those executed on a particular
exchange or exchanges.
Central Security depository a facility (or an institution) for holding securities, which enables
securities transactions to be processed by book entry. Physical
securities may be immobilised by the depository or securities may
be dematerialised (ie so that they exist only as electronic records).
In addition to safekeeping, a CSD may incorporate comparison,
clearing and settlement functions.
Certificate physical document which evidences an ownership claim in, indebtedness
of, or other outstanding financial obligations of the issuer.
Cheque a written order from one party (the drawer) to another (the drawee,
normally a bank) requiring the drawee to pay a specified sum on demand
to the drawer or to a third party specified by the drawer. Cheques may be
used for settling debts and withdrawing money from banks. See also bill
of exchange.
Clearing/clearance the process of transmitting, reconciling and, in some cases,
confirming payment orders or security transfer instructions prior
settlement, possibly including the netting of instructions and
establishment of final positions for settlement. Sometimes the
term is used (imprecisely) to include settlement.
85
Counterparty the opposite party to a financial transaction such as a securities
trade or swap agreement.
Credit risk the risk that a counterparty will not settle an obligation for full value,
either when due or at any time thereafter. In exchange-for-value
systems, the risk is generally defined to include replacement cost
risk and principal risk.
Credit transfer a payment order or possibly a sequence of payment orders made for
the purpose of placing funds at the disposal of the beneficiary.
Both the payment instructions and the funds described therein
move from the bank of the payer/originator to the bank of the
beneficiary, possibly via several other banks or intermediaries
and/or more than one credit transfer system.
Custodian an entity, often a bank, that safe keeps and administers securities
for its customers and that may provide various other services,
including clearance and settlement, cash management, foreign
exchange and securities lending.
Custody the safekeeping and administration of securities and financial
instruments on behalf of others.
Delivery versus payments a link between a securities transfer system and a funds transfer
system that ensures that delivery occurs if, and only if, payment
occurs.
Dematerialization the elimination of physical certificates or documents of title which
represent ownership of securities so that securities exist only as
accounting records.
Depository an agent with the primary role of recording securities either
physically or electronically and keeping records of the ownership of
these securities.
Direct debit preauthorised debit on the payer’s bank account initiated by the payee.
Electronic data the electronic exchange between commercial entities (in some
interchange (EDI) cases also public administrations), in a standard format, of data
relating to a number of message categories, such as orders,
invoices, custom documents, remittances advices and payments.
EDI messages are sent through public data transmission networks
or banking system channels. Any movement of funds initiated by
EDI is reflected in payment instructions flowing through the
banking system.
End user a customer of a financial institution to which the financial institution
provides payment instruments and services to facilitate the
completion of their commercial or financial transactions.
Encryption the use of cryptographic algorithms to encode clear text data
(plaintext) into chiphertext to prevent unauthorised observation.
Finality irrevocable and unconditional.
Gross settlement system a transfer system in which the settlement of funds or securities
transfer instructions occurs individually (on an instruction-by-
instruction basis).
Immobilization placement of physical certificates of securities and financial
instruments in a central securities depository so that subsequent
transfers can be made by book entry.
86
Institutional arrangements practices and organisational arrangements to provide various types
of payment services from financial institutions and other
organisations to users. They include market arrangements, the
legal and regulatory framework, and mechanisms for consultation
and coordination among stakeholders in the national payment system.
Interoperability a situation in which payment instruments belonging to a given
scheme may be used in systems installed by other schemes.
Interoperability requires technical compatibility between systems,
but can only take effect where commercial agreements have been
concluded between the schemes concerned.
Intraday credit credit extended for a period of less than one business day; in a
credit transfer system with end-of-day final settlement, intraday
credit is tacitly extended by a receiving institution if it accepts and
acts on a payment order even though it will not receive final funds
until the end of the business day. Also called daylight overdraft,
daylight exposure and daylight credit.
Intraday liquidity funds which can be accessed during the business day, usually to
enable financial institutions to make payments in real time.
Large-value payment a payment, generally involving a very large amount, which is mainly
exchanged between banks or between participants in the financial
markets and usually requires urgent and timely settlement. They
are often related to important financial market transactions such as
money market or foreign exchange transactions as well as many
commercial transactions.
Large-value payment system a system which processes mainly large-value payments.
Legal risk the risk of loss because of the unexpected application of a law or
regulation or because a contract cannot be enforced.
Liquidity risk the risk that a counterparty (or participant in a settlement system)
will not settle an obligation for full value when due. Liquidity risk
does not imply that a counterparty or participant is insolvent since it
may be able to settle the required debt obligations at some
unspecified time thereafter.
Loss-sharing (or loss an agreement among participants in a clearing or settlement system
allocation) agreement regarding the allocation of any losses arising from the default of a
participant in the system or of the system itself.
National payment system the institutional and infrastructure arrangements in a financial
system for initiating and transferring monetary claims in the form of
commercial bank and central bank liabilities.
Net settlement system a settlement system in which final inter-bank settlement of individual
transfer instructions occurs on a net basis at one or more discrete,
specified times during the processing day.
Netting an agreed offsetting of positions or obligations by trading partners
or participants. The netting reduces a large number of individual
positions or obligations to a smaller number of obligations or
positions. Netting may take several forms, which have varying degrees
of legal enforceability in the event of default of one of the participants
87
Network operations all the processes and arrangements related to the functioning of a
network (such as those related to operating hours, fees, sanctions,
delivery of items, formats, etc).
Non- Repudiation the ability to prevent denial or repudiation by the sender or receiver
of a payment message.
Novation the replacement of existing obligations by new obligations between
the existing or substitute parties that satisfactorily and legally
discharges the original obligation.
Operational risk the risk that deficiencies in information systems or internal contra Is
could result in unexpected losses.
Oversight a central bank function whereby the objectives of safety and
efficiency in payment and settlement systems are promoted by
monitoring existing and planned systems, assessing them against
these objectives and, where necessary, inducing change.
Payment the payer's transfer of a monetary claim on a party acceptable to
the payee. Typically, monetary claims take the form of banknotes or
deposit balances held at a financial institution or at a central bank.
Payment instruction the entirety of network facilities, technologies and procedures for
accessing and transacting payment instruments and for processing,
clearing and settling related payments.
Payment infrastructure services provided through the payment infrastructure for accessing
services and transacting payment instruments and for processing, clearing
and settling the related payments.
Payment order (instruction) an order or message requesting the transfer of funds (in the form of
a monetary claim on a party) to the order of the payee. The order
may relate either to a credit transfer or to a debit transfer. Also
called payment instruction.
Payment service markets arrangements that coordinate the production and pricing of payment
instruments and services and their delivery from payment service
providers to users. Particular markets are characterised by their
specific market practices, service providers and users, and factors
influencing the demand for and supply of that specific service.
Payment system a specific set of instruments, banking procedures and inter-bank
funds transfer (eg clearing and settlement) systems that ensures
the circulation of money.
Point of Sale this term refers to the use of payment cards at a retail location
(point of sale) The payment information is captured either by
paper vouchers or by electronic terminals, which in some cases are
designed also to transmit the information. Where this is the case,
the arrangements may be referred to as “ electronic funds transfers
at the point of sales” EFTPOS).
Principal risk the risk that the seller of a security delivers a security but does not
receive payment or that the buyer of a security makes payment but
does not receive delivery. In this event, the full principal value of the
securities or funds transferred is at risk.
Real-time transfer the transmission, processing and settlement of a funds or securities
transfer instruction at the time that it is initiated.
Retail payment a payment between various consumers, businesses and
governments of relatively low value and urgency. It is a payment
88
which is not captured in the definition of a large-value payment (see
large-value payment)
Retail payment infrastructure mechanisms used for transaction, clearing and settlement of
relatively low-value non-urgent payments initiated through payment
instruments such as cheques, credit transfers, direct debits and
payment cards.
Securities infrastructures full set of arrangements for the trading, registration and custody of
securities and for the confirmation, clearance and settlement of
securities transactions.
Securities systems the institutional arrangements and infrastructures for issuing and
administering securities liabilities, administering and safekeeping
holdings of securities issues, and initiating, confirming, matching,
transferring and settling securities transactions.
Settlement an act that discharges obligations in respect of funds or securities
transfers between two or more parties.
Settlement risk general term used to designate the risk that settlement in a transfer
system will not take place as expected. This risk may comprise both
credit risk and liquidity risk.
Stakeholder in a payment system, stakeholders are those parties whose
interests are affected by the operation of the system.
Straight through processing the automated end-to-end processing of trades/payment transfers
(STP) including the automated completion of confirmation, matching,
generation, clearing and settlement orders.
Systemic risk the risk that the failure of one participant in a transfer system, or in
financial markets generally, to meet its required obligations will
cause other participants or financial institutions to be unable to
meet their obligations (including settlement obligations in a transfer
system) when due. Such a failure may cause significant liquidity or
credit problems and, as a result, might threaten the stability of
financial markets.
Systemically important a payment system is systemically important where, if the system
payment systems were insufficiently protected against risk, disruption within it could
trigger or transmit further disruptions amongst participants or
systemic disruptions in the financial area more widely.
SWIFT Society for World wide Inter-bank Financial Telecommunication: a
cooperative organisation created and owned by banks that operates
a network which facilitates the exchange of payments and other
financial messages between financial institutions (including inter-bank
system providers) throughout the World. A SWIFT payment message
is an instruction to transfer funds: the exchange of funds (settlement)
takes place over a payment system or through corresponding banking
relationships.
89