1 2 3 Dummy A 20 B 15 C 20 20 15 10 10 Cost of Transportation: Test For Improvement

The document describes transportation costs for supplies from various warehouses to projects. It provides tables with supply amounts and costs to transport from each warehouse to different projects or dummy locations. Test calculations are shown to verify improvements from an initial plan. The optimal transportation plan is described that results in a total cost of 70 rubles.

Uploaded by

Angelica Rose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

1 2 3 Dummy A 20 B 15 C 20 20 15 10 10 Cost of Transportation: Test For Improvement

The document describes transportation costs for supplies from various warehouses to projects. It provides tables with supply amounts and costs to transport from each warehouse to different projects or dummy locations. Test calculations are shown to verify improvements from an initial plan. The optimal transportation plan is described that results in a total cost of 70 rubles.

Uploaded by

Angelica Rose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1 2 3 Dummy

A 5 2 2 20
10 10 ❑ ❑0
B ❑4 52 102 ❑0 15
C ❑1 ❑2 04 100 20
20 15 10 10

Cost of transportation: Test for improvement:

A 1:10 ( 5 ) =5 0 A 3 :2−2+2−1=1
A 2 :10 ( 2 ) =20 Adummy :0−2+2−1=−1
B 2:5 ( 2 )=10 B1 : 4−2+ 2−5=−1
B 3:10 ( 2 )=20 Bdummy :0−1+ 4−0=3
C 3 :0 ( 4 )=0 C 1 :1−4+1−2=−4
C dummy :1 0 ( 0 )=0 C 2 :2−4+1−2=−3
Total=90

1 2 3 Dummy
2 2
A ❑ 5
5 10 50 20
b ❑4 102 ❑2 50 15
c 201 ❑2 ❑4 ❑0 20
20 15 10 10

Cost of transportation: Test for improvement:

A 2 : 5 ( 2 ) =10 A 1:5−2+2−0=5
A 3 : 10 ( 2 )=2 0 B1 : 4−2+ 2−2=2
Adummy :5 ( 0 )=0 B 3:2−0+0−2=0
B 2: 10 ( 2 )=2 0 C 2 :2−1+0−0=1
B dummy :5 ( 0 )=0 C 3 : 4−2+ 2−2=2
C 1 :20 ( 1 )=2 0
Total=70

Decision:
From warehouse A to Project 2 = 5 supplies
From warehouse A to Project 3 = 10 supplies
From warehouse A to dummy = 5 supplies
From warehouse B to Project 2 = 10 supplies
From warehouse B to dummy = 5 supplies
From warehouse C to Project 1 = 20 supplies
Total Cost: ₽70