0% found this document useful (0 votes)
22 views12 pages

Example Problems

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views12 pages

Example Problems

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

Example for multifacility plant location (Brute Force Approach)

Demand cost table


Location
Customer 1 2 3 4 5
A 500 300 200 800 500
B 150 250 100 300 350
C 750 300 0 150 0
D 400 200 1600 400 600
E 900 600 1200 0 1200
Total 2700 1650 3100 1650 2650

Location Pairs
Customer 1&2 1&3 1&4 1&5 2&3 2&4 2&5
A 300 200 500 500 200 300 300
B 150 100 150 150 100 250 250
C 300 0 150 0 0 150 0
D 200 400 400 400 200 200 200
E 600 900 0 900 600 0 600
Total 1550 1600 1200 1950 1100 900 1350

Then we choose location pairs 3&4 because min cost is 700


We allocate customers A, B, and C to location 3
We allocate customers D,E to location 4
3&4 3&5 4&5
200 200 500
100 100 300
0 0 0
400 600 400
0 1200 0
700 2100 1200 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0
Example for Location problem with fix cost

Cost to meet demand


Location
Customer A B C D E
1 100 500 1,800 1,300 1,700
2 1,500 200 2,600 1,400 1,800
3 2,500 1,200 1,700 300 1,900
4 2,800 1,800 700 800 800
5 10,000 12,000 800 8,000 900
Fix cost 3,000 2,000 2,000 3,000 4,000
Total cost 19,900 17,700 9,600 14,800 11,100

If only 1 warehouse should be located choose C because it has the lowest cost

If more than 1 warehouses should be selected use savings method

Suppose we chose C and A


What will be the total cost reduction if any?
Step 1. Compare the costs of C and A
Serving 1&2 customer will be less costy from location A. Total savings = 1100+ 1700 = 2800
The rest is cheaper from location C

Savings for location A


Location
Customer A B C D E
1 1,700
2 1,100
3 2,500 2800
4 2,800
5 10,000
Fix cost 3,000

Step 2: Compare it with fix cost of A which is 3000 > 2800


No savings

Step 3: Compare C&B now


Serving 1,2&3 customer will be less costy from location B. Total savings = 1300+ 2400+500= 4,200
The rest is cheaper from location C

Savings for location B


Location
Customer A B C D E
1 1,300
2 2,400
3 500
4 1,800
5 12,000
Fix cost 2,000

Step 4: Compare it with fix cost of B which is 2000 < 4200


Savings of 2,200

Step 5: Compare C&D now


Serving 1,2&3 customer will be less costy from location D. Total savings =500+ 1200+1400= 3,100
The rest is cheaper from location C

Savings for location D


Location
Customer A B C D E
1 500
2 1,200
3 1,400
4 800
5 8,000
Fix cost 3,000

Step 6: Compare it with fix cost of D which is 3000 < 3100


Savings of 100

Step7: Compare C&E now


Serving 1,2 customer will be less costy from location E. Total savings =100+800 = 900
The rest is cheaper from location C

Savings for E
Location
Customer A B C D E
1 100
2 800
3 1,900
4 800
5 900
Fix cost 4,000

Step 8: Compare it with fix cost of E which is 4000 >900


No saving

Customer 1 will be served by B


Customer 2 will be served by B
Customer 3 will be served by B
Customer 4 will be served by C
Customer 5 will be served by C
0+ 1700 = 2800

0+ 2400+500= 4,200
1200+1400= 3,100
Transportation Model with minimizing cost

Factory Supply Warehouse Demand


Indianapolis 15 Columbus 10
Phoenix 6 St. Louis 12
New York 14 Denver 15
Atlanta 11 Los Angeles 9

Shipping Costs per Case (in Dollars)


Factory
From Columbus St. Louis Denver Los Angeles Supply
Indianapolis 25 35 36 60 15
Phoenix 55 30 25 25 6
New York 40 50 80 90 14
Atlanta 30 40 66 75 11
Destination
requirement 10 12 15 9 46

Candidate Total
Solution Columbus St. Louis Denver Los Angeles Shipped
Indianapolis 0 0 15 0 15
Phoenix 0 0 0 6 6
New York 10 4 0 0 14
Atlanta 0 8 0 3 11
Destination
requirement 10 12 15 9 46

Cost
Calculations Columbus St. Louis Denver Los Angeles Total Cost
Indianapolis 0 0 540 0
Phoenix 0 0 0 150
New York 400 200 0 0
Atlanta 0 320 0 225
400 520 540 375 1835
Transportation Model with minimizing cost and adding a new facility

Factory Supply Warehouse Demand


İstanbul 15 Bursa 12
İzmir 6 Antalya 15
Gaziantep 14 Ankara 14
Adana 11 Bodrum 13
Konya 8
total 54 54

Shipping Costs per Case (in Dollars)


Factory
From Bursa Antalya Ankara Bodrum Supply
İstanbul 25 45 36 60 15
İzmir 40 50 35 25 6
Gaziantep 80 50 60 90 14
Adana 55 40 66 75 11
Konya 50 22 15 50 8
Destination
requirement 12 15 14 13 54

Candidate Total
Solution Bursa Antalya Ankara Bodrum Shipped
İstanbul 12 0 3 0 15
İzmir 0 0 0 6 6
Gaziantep 0 4 10 0 14
Adana 0 11 0 0 11
Konya 0 0 1 7 8
Destination
requirement 12 15 14 13 54

Cost
Calculations Bursa Antalya Ankara Bodrum Total Cost
İstanbul 300 0 108 0 408
İzmir 0 0 0 150 150
Gaziantep 0 200 600 0 800
Adana 0 440 0 0 440
Konya 0 0 15 350 365
Total Cost 300 640 708 150 1798