Sites Inspection Report: Visit Details
Sites Inspection Report: Visit Details
Visit Details
INSTRUCTIONS: Complete the following table with details of the visit.
Completed by Mr.Jabar
Dates 17/11/2021
Agenda
INSTRUCTIONS: Complete the following table with the visit agenda.
17/11/21 ADRIC Inspection of current waste management practice executed at site Mr.Jabar & Mr. Ahmed
Saleh
17/11/21 SAS AL Inspection of current waste management practice executed at site Mr.Jabar & Mr. Nelon
NAKHEEL
General Observations
INSTRUCTIONS: Insert your general observations from the monitoring visit here. This may be a few
paragraphs up to a few pages. Include photos, case studies and quotes to illustrate your points.
For inspiration see our article What does “monitoring” actually mean?
During the site visit below listed have been observed for the said location.
1
No designated waste management
team
No record of waste generation at
site
Non -Compliance to Tadweer
guidelines for the implementation of
E manifestation
Action Plan
INSTRUCTIONS: List the specific issues / problems that were identified during the visit. Then
identify the actions that need to be taken to solve the problem. This should include the specific
individual responsible for taking the action, and when it should be completed by.
No designated garbage room for the ADNOC client has to provide a designated room for
storage of waste the storage of waste as well as to carry out waste
segregation activity.
No waste sorting activity at site and all After establishment of contract with waste
waste is transferred to Tadweer bins hauler ,all the waste generated at site will be
which is strictly prohibited stored in 1100 ltr bins provided by waste hauler
and Tadweer bins will not be used hereinafter
No designated waste management team Provision of Waste Management operatives is subject to approval
of SPM –Mr Usman Ali as well as ADNOC client
<Insert> <Insert>
<Insert> <Insert>
2
<Insert> <Insert>
<Insert> <Insert>
<Insert> <Insert>
Next Visit
INSTRUCTIONS: Provide details of when the next monitoring visit will be. The objectives of the
next visit should match the issues and actions identified in this visit. For example, if the quality of
activities is an issue then the next visit should observe those same activities to make sure the
quality has improved.