0% found this document useful (0 votes)
255 views1 page

Column Schedule:: Column Reinforcement Plinth Level Mid of Roof Above PL Clear Cover 2 " Clear Cover 1 "

The column schedule document provides reinforcement details for two columns, C1 and C2, at different heights of a building. Column C1 is a 15x15 square column reinforced with 8 diameter 16mm bars up to the plinth level and 8 diameter 16mm bars from the plinth level up to the roof. Column C2 is also a 15x15 square column reinforced with 4 diameter 20mm bars and 4 diameter 16mm bars up to the plinth level, and 4 diameter 20mm bars and 4 diameter 16mm bars from the plinth level up to the roof. The document also specifies requirements for column tie details.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
255 views1 page

Column Schedule:: Column Reinforcement Plinth Level Mid of Roof Above PL Clear Cover 2 " Clear Cover 1 "

The column schedule document provides reinforcement details for two columns, C1 and C2, at different heights of a building. Column C1 is a 15x15 square column reinforced with 8 diameter 16mm bars up to the plinth level and 8 diameter 16mm bars from the plinth level up to the roof. Column C2 is also a 15x15 square column reinforced with 4 diameter 20mm bars and 4 diameter 16mm bars up to the plinth level, and 4 diameter 20mm bars and 4 diameter 16mm bars from the plinth level up to the roof. The document also specifies requirements for column tie details.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COLUMN SCHEDULE:

COLUMN REINFORCEMENT COLUMN TIE DETAIL

COLUMN INDEX PLINTH LEVEL MID OF


UPTO PLINTH LEVEL ROOF

Above PL CLEAR COVER = 2½" CLEAR COVER = 1½" LEGEND

1'-5" 1'-3"
212" 112"
C1 (15" X 15")
1'-5"

1'-3"

8- Ø 16mm 8- Ø 16mm

1'-5" 1'-3"

SPLICED WITHIN CENTER HALF OF COLUMN


212"

MAXIMUM SLOPE 1:6


MAXIMUM 50% COLUMN REBAR MAY BE
C2 (15" X 15") 112"
1'-3"
1'-5"

LAP LENGTH
4- Ø 20mm + 4- Ø 16mm

Ø 10 @ 5" C/C
4- Ø 20mm + 4- Ø 16mm

6"
= Ø 20mm
= Ø 16mm
4"

TIE HOOK