0% found this document useful (0 votes)
83 views48 pages

SAP110 Separations User Manual

This document provides end users with information about the E-Separation process in 3 steps: 1. Employees can raise an E-Separation request which triggers approval and exit interview processes. 2. An HR person runs a trigger program to move the request to the approval process where approvers are notified. 3. Employees receive an exit interview form via email which they fill out and submit.

Uploaded by

Top Ngô
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views48 pages

SAP110 Separations User Manual

This document provides end users with information about the E-Separation process in 3 steps: 1. Employees can raise an E-Separation request which triggers approval and exit interview processes. 2. An HR person runs a trigger program to move the request to the approval process where approvers are notified. 3. Employees receive an exit interview form via email which they fill out and submit.

Uploaded by

Top Ngô
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 48

END USER DOCUMENT

ERP - PROJECT

SUGAMYA

END USER DOCUMENT

FOR

HUMAN CAPITAL MANAGEMENT

PERSONNEL ADMINISTRATION

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

TABLE OF CONTENTS

1 DOCUMENT CONTROL…………………………………………………………………..3
1.1 DOCUMENT HISTORY ................................................................................................ 3
1.2 DISTRIBUTION ............................................................................................................. 3
2 PROCESS NAME ............................................ERROR! BOOKMARK NOT DEFINED.
2.1 OVERVIEW ............................................................................................................... 4
2.2 PREREQUISITES ...................................................................................................... 4
2.3 TIPS & TRICKS ....................................... ERROR! BOOKMARK NOT DEFINED.
2.4 TIPS & TRICKS ....................................... ERROR! BOOKMARK NOT DEFINED.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

1 DOCUMENT CONTROL

This is a controlled document and will be maintained on UJVNL portal.

Changes to this document will be recorded below and must be published to all interested parties.

1.1 DOCUMENT HISTORY

Version Date Author VERSION DETAILS


V01 15.02.2018 Vinay First ISSUE

1.2 DISTRIBUTION

Date Name Purpose

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

1. PROCESS NAME AND DESCRIPTION

ESS Loan request process for employees.

1.1. OVERVIEW
E-Separation facilitates organization to process end to end separation process online on ESS/MSS.
Process enables each participant of the process to actively record their inputs on portal and complete
the process with minimum manual or unorganized communication. E-separation process can be
describing in the following steps.
1. Separation request – Employee or HR team can raise separation request

2. Counselling process – HR person can assign counsellor to the separation request so get employee
counsel as and when required.

3. Exit interview – System sends Exit interview form to the employee separation inbox. Employee can fill
this interactive PDF file and submit form to the HR person.

4. Approval process – Separation request will have five approval levels as per UJVN policy i.e. Reporting
manager, HOD, ED HR, Director HR and MD according to the Post applicable.

5. Before 7 days of the final relieving date, system triggers dues clearances tasks to the corresponding task
owners. Task owners will have to clear tasks pending at their end with proper status and recovery
amount if there is any.

6. On the separation date i.e. final actual relieving date, system will update all the dues clearances
recovery amounts to the payroll additional infotype master data.

7. Also on the separation date system will create batch separation action session to let user choose and
run separation action. This will make employment status to withdrawn.

8. Also on the separation date system will fill the separation inbox with the separation letters i.e. relieving
and service experience letter. Employee would require taking print out and take signature from the GM
HR as per UJVN policy.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2. PROCEDURAL STEPS

2.1. EMPLOYEE E-SEPARATION REQUEST


Employee raise ESS loan request.

2.1.1. MENU PATH AND TRANSACTION NUMBER

ESS LINK: HTTP://ERPSRV.UJVN.CO.IN:50200/IRJ/PORTAL

2.1.2. INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW


(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Login as employee over ESS:

Go to Benefits and Payments section:

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Go to work events area:

Click on the E Separation request service inside work events Area,

E-Separation overview screen –

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Click on the Create button to create new E-Separation request,

Complete the separation details required on the screen and submit request with the ‘Save and Exit’ button on the
application toolbar.

Employee can also write in detail language if required in the notepad provided in the second window
‘Note/Remarks’ by clicking on ‘Note button’.

Once submitted and refresh and system provides unique Separation request number and displays request in the
overview window.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Employee can go and display the request. System has added few more field on the request screen inside as per
business logic.

Notice period for employee: Defaulted from the employee infotype 0016 – contract elements
Notice period for employer: Defaulted from the employee infotype 0016 – contract elements
Level details: Defaulted from the employee infotype 0000 – Last change in the employee subgroup i.e.
designation.
All three field above would be always non-editable to all the participants of the process.

Relieving Date: Defaulted as the notice period end date from the ‘Notice period for employee’ shown above.
Relieving date is the actual last calendar date of the employee in the organization.
Physical Date: Defaulted as the notice period end date from the ‘Notice period for employee’ shown above.
Physical date is the actual last date of the employee when employee would be physically present in the
organization. This would be more relevant when last date as per notice date falls on the weekday or public
holiday.

Relieving and physical dates are editable to only HR Person Role of the process.

System will send the Separation request initiation mail notification to employee, Reporting manager, and HR
Person of the employee. Mail notification will be as show here,
Check SOST transaction for mail notification,

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Field Name Description R/O/C User Action and Values Comments

2.2. TRIGGER NEXT PHASE – APPROVAL PROCESS

Process requires to run trigger program to process e-separation request from‚ ‘Initiated‘ to ‘in-process‘
phase.

2.2.1. MENU PATH AND TRANSACTION NUMBER

Human Resources  Payroll  Asia  India  Utilities  E-Separation Solution -


HINU_ESEP_TP - E-Separation: Trigger Processes

Transaction code: HINU_ESEP_TP - E-Separation: Trigger Processes

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.2.2. INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW


(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Field Name Description R/O/C User Action and Values Comments

Execute and Run program coupe of times to let system trigger E-Separaation process to the next stage i.e.
Approval process.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Output of the Trigger program above showns two process stages have been triggered here.

1. Approval process
2. Exit interview

With the Approval process trigger system will send mail to first approver informing separation approval
required. Mail intimation would be as follows,

Check SOST for mail,

Also employee will receive email notification along with the ‘EXIT INTERVIEW‘ Adobee interactive
form as shown below.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Employee can download Exit interview PDF form from the mail. Open interactive PDF exist interview
file.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Complet Exit interview form in detail and click on the submit button at the

bottom

System will prompt default email application in the system as a pop up with the Exit interview completed
form as attachement in the email.

Send email to the promoted address only and that will complete the exit interview process at the
employee end.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Authorized person from the HR End will only have access to the email inbox used for collecting
separation exit interview.

During any point of time employee, Reporting manager or HR Person will always be able to track the
separation request from their separation service on the ESS or MSS as follows,

Select the request and go to the other action – process overview option. Sytem will prompt Flex process
flow as follows,

Users can always track yello boxex as pending processes whereas green for the completed steps.

2.3. MSS APPROVAL PROCESS

E-Separation approval process has five levels as follows, all approvers will receive email notification as
earlier approver approves request. Approve can approve or forward separation request to some other user
id.

1. Reporting Manager – A002 Relation in the organization hierarchy

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2. Department HOD – A012 relation in the organization hierarchy


3. GM HR Department – UJVN GM HR position number
4. UJVN Director HR – UJVN DC Position
5. UJVN Managing Director – UJVN MD Position

2.3.1. MENU PATH AND TRANSACTION NUMBER

MSS LINK: HTTP://EPQQASDB.UJVN.CO.IN:56400/IRJ/PORTAL

2.3.2. INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW


(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Login as Reporting Manager over MSS:

Go to MSS – E-Separation approval service on the left panel

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose the request in the Separation request approval window.

Edit the request,

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Refresh screen to clear the approver inbox.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Separation request approval window is clear. System will send next approver email notification for approval.

Check SOST for the mail notification as follows,

System will keep on triggering each level of approval as earlier level gets approved.

Similar to the level one approval, we can login to all remaining four level approvers in MSS separation request
approval service and approve the request.

Level 2 - HOD Approval:

Go to MSS – E-Separation approval service on the left panel

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose the request in the Separation request approval window.

Edit the request,

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Refresh screen to clear the approver inbox.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Separation request approval window is clear. System will send next approver email notification for approval.

Level 3 – GM HR Approval

Go to MSS – E-Separation approval service on the left panel

Choose the request in the Separation request approval window.

Edit the request,

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Refresh screen to clear the approver inbox.

Separation request approval window is clear. System will send next approver email notification for approval.

Level 4 – Director HR Approval

Go to MSS – E-Separation approval service on the left panel

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose the request in the Separation request approval window.

Edit the request,

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Refresh screen to clear the approver inbox.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Separation request approval window is clear. System will send next approver email notification for approval.

Level 5 Managing Director Approval

Go to MSS – E-Separation approval service on the left panel

Choose the request in the Separation request approval window.

Edit the request,

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Refresh screen to clear the approver inbox.

Separation request approval window is clear.

Thus, all the approval levels are clear. Stage trigger program will trigger next stage i.e. ‘Dues clearance’ before 7
days of the physical reliving date only.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.4. COUNSELLING PROCESS

HR Person can assign any employee from the UJVN as a counsellor to the employee. Counsellor will be
notified with the email. Counsellor has to held discussion with the employee and try to counsel employee
on the separation decision taken by the employee.
Counsellor will be update the details of the counsellor and submit details back to HR Person.
Counsellor process can be initiated by the HR Person n number of times and can be done in parallel or
before approval process.

2.4.1. MSS COUNSELLING INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW
(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Login as HR Person over MSS:

Go to MSS – E-Separation HR Admin service on the left panel

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Edit request in the ‘My employee’s Separation requests’ window.

Go to the counselling Details window inside request,

Click on the Counsellor Button in the toolbar,

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Choose approve option, write in detail Remarks if any and click on the ‘Save and exit’ button to approve request.

Save and Back the request.

Counsellor should receive the mail notification to counsel the employee.

Check SOST for email notification.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.4.2. MSS COUNSELLOR PROCESS

Counsellor needs to contact employee and take appointment for the counselling. Once counselling is done with
the employee, counsellor needs to record the result in the separation request of the employee.

Login to counsellor MSS,

Go to separation approval service in the left panel.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Go to counselling window in the service. Fine pending counselor request.

Edit request and fill the details of the counselling.

Select counselling done or cancel radio button and fill the details of the counselling discussion done along with
the counselling date with the employee.

Save and exit the request.

System will send Email notification to the HR Person notifying counselling is done.

HR Person needs to login MSS HR Person separation request again. Edit the request and go to the counselling
window. Edit counselling request.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Read counselling details feed by the counsellor. HR Person need to decide whether counselling done is
successful or not with the Details feed by the counsellor in the counselling request.

Write remarks of the counselling process done and choose drop down option at the end of counselling request
line as counselling is successful or unsuccessful.

Save and exit the request. Refresh window to clear counselling request window.

If counselling is successful HR Person can discuss in person with the employee and initiate separation request
withdrawal. Once withdrawal process complete, separation request status will turn to the withdrawn and process
is close.

If counselling process is unsuccessful then HR Person can initiate n number of more counselling request and
arrange further counselling to the employee or stop the counselling process and continue with the process of
separation.

With the counseling done by the counsellor, HR Person will receive email notification that counselling process is
been completed.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.5. TRIGGER NEXT PHASE – DUES CLEARANCE PROCESS

Process requires to run trigger program to process e-separation request dues clearances stage. System is
configured to trigger dues clearance stage 7 days before physical separation date.
As per UJVN policy, Employee separating from the organization needs to take clearance for the 12
items/Tasks as follows with their owner i.e. Task owners.

SR. NO. Department/Task/Item Task Owner


1 TOOLS REPORTING MANAGER
2 FILES/FOLDERS REPORTING MANAGER
3 ADVANCE/LOANS FI EXECUTIVE
4 ASSETS/WHITE GOODS FI EXECUTIVE
5 SAP ID IT EXECUTIVE
6 ESS ID IT EXECUTIVE
7 DOMAIN ID IT EXECUTIVE
8 LAPTOP IT EXECUTIVE
9 DESKTOP IT EXECUTIVE
10 DATA CARD ETC. IT EXECUTIVE
11 TRAINING BOND TRAINING ADMN.
12 OTHER ACCESSORIES HR DEPARTMENT

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

System will create Workflow task for each of the above clearance item and create pending task/item at
the separation approval application against task owner. Task owners needs to open respective task at their
end and complete the task by putting status and remark if required.
Also, some of this task are Finable for which if required, task owners can put the recovery amount and
close the task. This amount will be updated to the payroll master data to the 0015 additional deductions
infotype. Payroll run will take care of recovery from the employee.
Tasks would be assign to the user ids in the configuration which required to be maintain as per latest data
always.

2.5.1. MENU PATH AND TRANSACTION NUMBER

Human Resources  Payroll  Asia  India  Utilities  E-Separation Solution -


HINU_ESEP_TP - E-Separation: Trigger Processes

Transaction code: HINU_ESEP_TP - E-Separation: Trigger Processes

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.5.2. INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW


(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Field Name Description R/O/C User Action and Values Comments

Execute and Run program coupe of times to let system trigger E-Separaation process to the next stage i.e.
Dues Clearance.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Output of the Trigger program above showns Dues Clearance stage is been triggered here.

2.5.3. MSS TASK CLEARANCE INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW
(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Login as Reporting Manager over MSS: Reporting manager has two dues clearance task pending at his/her end.

Go to MSS – E-Separation Approval service on the left panel

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Go to the Tasks/Dues Clearance window in the service. There are two pending tasks at the reporting manager
end.

Edit the task line item to open the task item.

Choose the status of the tasks to close the pending task from the drop down. Also if tasks provides option to put
recovery amount then user can put amount if recovery is required to be done. Recovery amount field is optional.
User needs to choose the status, put details remarks and click on the save and back button in the toolbar.

Tools Task pending against reporting manager means to collect mechanical or any other tools given to the
employee for work. It’s reporting manager duty to collect them from the employee before separation and
complete the dues clearance pending Tools task.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Refresh dues clearance window to clear the dues clearance pending tasks.

Similarly Reporting manager will be clearing second pending Task which is to collected filed/folders to be
collected from the employee as follows.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Reporting manager needs to clear two pending tasks for separation request.

Also all other dues clearance task owners needs to close pending tasks at their end and note the results.

Employee or HR Person can always keep track of the dues clearance tasks and their progress with the details in
the separation request. Go to the separation application as shown earlier and edit the separation request, go to the
dues clearance i.e. Tasks list window as shown below to view and track details of the task.

2.6. TRIGGER NEXT PHASE – SEPARATION PROCESS

Process requires to run trigger program to process e-separation request separation stage. System is
configured to trigger separation stage only on the physical separation date of the separation request. Dues
clearance stage 7 days before physical separation date.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Also with the separation action, system updates all the recoverable collected from the separation process
to the payroll master data to process with the separation payroll run.
Also with the separation action, system updates Experience and Relieving Letter in the separation
request’s attachment window. Employee, HR Person, and Reporting manager can check and download
this letters from the separation request service on the ESS/MSS.

2.6.1. MENU PATH AND TRANSACTION NUMBER

Human Resources  Payroll  Asia  India  Utilities  E-Separation Solution -


HINU_ESEP_TP - E-Separation: Trigger Processes

Transaction code: HINU_ESEP_TP - E-Separation: Trigger Processes

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.6.2. INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW


(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Field Name Description R/O/C User Action and Values Comments

Execute and Run program coupe of times to let system trigger E-Separaation process to the next stage i.e.
Dues Clearance.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Output of the Trigger program above shows separation stage is been triggered here. Output log shows,
system has generated two separation letters and updated Payroll master data with dues clearance
recoverables.

2.6.3. SEPARATION ACTION - MENU PATH AND TRANSACTION NUMBER

Transaction code: SM35 Batch session


Transaction code: PA30 HR Master data

System updates separation action to be run by the administrator as batch session. Check SM35 Batch
session created by the system. Select session and run separation action in the foreground. Delimit
employee data as required and change employement status to the withdrawn.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Run action similar way currently UJVN is performing leaving action during separation process.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Continue running leaving action and delimit required infotypes. Infotypes will come in the sequence as
configured to come with the separation/leaving action.

2.6.4. CHECK UPDATED PAYROLL DATA - MENU PATH AND TRANSACTION NUMBER

Transaction code: PA30 HR Master data

System updates recovrables collected in the dues clearance process over MSS from the verious
departments to the payroll master data.

As shown above, during dues clearance process from the reporting manager, we had 5000 rs recovarable
against Tools/Accessories to be return to the department.

Check PA30 – infotype 0015 – additional deductions is been updated with the recovery amount from
dues clearance by the trigger program.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.6.5. CORRESPONDENCE LETTERS - MENU PATH AND TRANSACTION NUMBER

Transaction code: PA30 HR Master data

System updates infotype 0906 with the letter data which enables correspodance letters to process in the
Employee, HR Person and Reporting manager separation request attachment inbox.

Go to PA30 – infotype 0906 – Corrospodance letters

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

2.6.6. MENU PATH AND TRANSACTION NUMBER

MSS LINK: HTTP://EPQQASDB.UJVN.CO.IN:56400/IRJ/PORTAL

2.6.7. CORRESPONDENCE LETTERS INPUT FIELDS ALONG WITH SCREENSHOT AND FLOW
(Note: In the below table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)

Login as employee or HR Person over ESS/MSS:

Project SUGAMYA HCM – E-separation For Internal Circulation


Only
END USER DOCUMENT

Go to E-Separation service,

Edit request and go to correspondence letters window of the request inside.

System has created two letters i.e. Relieving and Experience here as attachment which can be downloaded.

Further user needs to take print of this letters and take signature of the authority person (GM HR) of the UJVN.

This will be completing E-Separation process of the employee.

Project SUGAMYA HCM – E-separation For Internal Circulation


Only

You might also like