This document provides a list of repair and renovation work items with descriptions, units, quantities, and pricing. It includes demolition of existing fixtures and MEP work. Walls and ceilings will be repaired with primer, stucco and paint application. A kitchen sink, doors, joinery works, marble counter, and aluminum fly nets will be replaced or repaired. The total cost of materials and labor for all items is estimated at $22,000.

Uploaded by

Hm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

BOQ (3) Flat

This document provides a list of repair and renovation work items with descriptions, units, quantities, and pricing. It includes demolition of existing fixtures and MEP work. Walls and ceilings will be repaired with primer, stucco and paint application. A kitchen sink, doors, joinery works, marble counter, and aluminum fly nets will be replaced or repaired. The total cost of materials and labor for all items is estimated at $22,000.

Uploaded by

Hm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Descrpition Unit Total

SI. No Remarks Item QTY


Price Amount
B.Demolition and Mep WORK
1 Demolition of existing WC with flooring of Shower and cart sway debris as per Dubai Municipality Norms. Janitor Bathroom
2 chasing for drain pipe of washing machine in new location Janitor Bathroom Item 1 3,900 3,900
3 Demolition of wash Basin and close all MEP provision Janitor Bathroom
D-Wall Finishes 0
1 Supply and application of primer, stucco and1 top coats of fenomastic paint to walls full flat msq 295 18 5,310 168
E. Ceiling 0
Supply and application of Gypson Bord with ,primer, stucco and 2 top coats of fenomastic paint to plain gypsum
2 ceiling.for work opening in lower floor and working floor Janitor Room msq 16 135 2,160
Supply and application of primer, stucco and1 top coats of fenomastic paint to walls Janitor Room msq 16 25 400
Remove and refix Mep work in the exsiting ceiling Janitor Room no 4 55 220
G. Ktichen Sink 0
1 Supply and installation of of SS (Grade 316) kitchen sink as per the exsiting ,Teka Brand or equevelant kitchen ITEM 1 490 490
H. Doors 0
Repairs to wooden doors, with wooden frames of any size and kind, work to include all required materials,
1 wood, glue screws, hinges, nails, repair to frame , painting and architrave, excluding lock, handle, All flat Nos 7 550 3,850

I- Joinery works 0
Repairs to wooden furniture (kitchen cabinet and other). Work to include all required materials, wood, glue,
1 screws, hinges, nails, repair to frame,painting and architrave, excluding lock, handle, glass . Kitchen and Other No 1 4,900 4,900

K. Marbel Work 0
1 Apply Bolishing , with criztalzation coat of main toiet counter with fixing the wash basin Main Bath Room No 1 1900 1,900
K. Aluminum Work 0
1 Changing damaged fly net mish , Balcony Door No 2 280 560