The School Implementation Plan is a roadmap that delineates the school’s target
solutions designed to eliminate or reduce the impact of identified priority improvement
areas to which the school and community members should undertake in a period of three
years. It aims to provide the spectators with activities that are organized, child-centered,
evidence and results-based to improve the school’s access, quality and governance as key
result areas in basic education. Moreover, the SIP must be geared toward the
accomplishment of goals mandated by the Schools Division of Bulacan, reflecting its
corresponding development plan, to better respond to the school’s current situation (DepEd
Order no. 44, s. 2015).
It is with high hope that this plan will be thoroughly implemented and assessed; its
subsequent activities and the entire processes including their objectives will be managed
and attained. May this plan be an instrument for further improvement and continuous
progress of every educational aspect; an act to consider learners’ total development as the
heart of this endeavor.
- P. E. Dela Cruz
Table 4.1 Project Work Plan and Budget Matrix for Project Learning AT Page 14
HOME
Table 4.2 Project Work Plan and Budget Matrix for Project PROTECT Page 15
Table 4.3 Project Work Plan and Budget Matrix for Project STREAM Page 16
Table 4.4 Project Work Plan and Budget Matrix for Project GEM Page 17
Table 4.5 Project Work Plan and Budget Matrix for Project BUILD Page 18
Table 4.6 Project Work Plan and Budget Matrix for Project DAP Page 19-20
Table 4.7 Project Work Plan and Budget Matrix for Project SIESS Page 21
CHAPTER 1 C
H
A |5
School Improvement Plan
P
T
E
Department of Education Mission, Vision, and Core Values
Statement
On its vision DepEd was coined as “a learner-centered public institution”, for the
team, it exactly defines the school’s role, which is to provide by all means, everything that is
needed, and will be needed for the welfare of the learners and for their future. It was also
said that the DepEd “continuously improves itself”, the SPT members described it as an
effort to cope up with the changing world, to be at par with the current standards. These
visions were also the SPT’s aspirations for our school and our school-children.
Under the quarantine set-up brought about by COVID-19 pandemic the school
planning team also gave their thoughts on the words indicated in DepEd’s Mission
statement. For them, its sole mission was to gather all the stakeholders to work hand in
hand and be equally responsible in providing students with positive environment as well as
meaningful learning experiences when all the stakeholders share efforts, its mission to
provide quality, equitable, culture-based and complete education is never impossible to
happen. DepEd’s mission statement clearly fosters an advocacy for all the components of
the educational system to work altogether to cater quality basic education to every Filipino.
The remaining part of the vision sharing was used at looking through DepEd’s Core
Values. For the SPT, these core values should be developed among the youth because these
are indeed of high relevance at the present times, if these values would be imbibed by the
future generations there would probably be no cases of injustice, corruption, armed
conflicts and divisiveness which hinder our nation’s progress.
Activities Schedule
Preparatory Activities (1 Month)
1. Distribution of the invitation letter to the school’s January 7, 2019
stakeholders
2. Organization of SCPT and SPT January 14, 2019
3. Retrieval of CBMS Forms from LGUs January 15, 2019
4. Conduct of SPT orientation, vision sharing, and January 25, 2019
scheduling.
5. Start of early registration and child-mapping January 26, 2019
6. Organize data using the School-Community Data January 22-31, 2019
SPT TIMETABLE
CHAPTER 2 C
ASSESS H
School’s Current Situation A
P
1. Current Status of Children
T
The influx of relocates in Pandi brought about sudden changes in E
terms of Matias B. Salvador Memorial Elementary School’s population. It has R
currently a total of 1, 293 school children in its enrolment last school year.
These changes were contributory to having high absenteeism and drop-out 2
2. School Goals
One main goal which MBSMES aims to improve is the pupils’ proficiency level as well
as their ability in performing basic mathematical operations. Provision of relevant learning
resources and improving teacher’s competence in all learning areas were identified to be
primary supplemental to this goal. With these, the teachers of MBSMES have been actively
participating in various trainings and seminars in order to acquire more and up-to-date
teaching strategies that will make them more competent in imparting knowledge skills to
the minds of their young pupils. These efforts will certainly contribute to the realization of
the school target which is to further improve the pupil’s proficiency level and basic
computation skills.
Our school is committed to ensure educational continuity admits the challenges.
Therefore, education must continue to give hope and stability for development of the
learners but health and safety of learners and school personnel are of utmost importance
and must be protected at all times.
Each grade level has one appointed grade chairman who shall act as a focal person
in receiving information and who’s also responsible in disseminating such to other faculty
members. Through this system, it is ascertained that everyone is duly informed and notified
of all the programs, activities and reports that the school was required of. Further, Master
Teachers have been assigned to assist the school head in performing the task of monitoring
and evaluating teachers’ performance, provided that the results were also properly relayed
to the school head for further verification, at the same time to give her information on her
teaching staff’s strengths and weaknesses.
B. SCHOOL PERFORMANCE
B1. B2 CURRENTLY B3. INHIBITING B4. PROJECTS B5.
DATA CONTRIBUTING FACTORS IMPLEMENTED GROUP
NEEDED S THAT
A. REQUIR
TARGETS E
ATTEN
TION
YES/ EXPLANATION
NO
PLANNING WOKSHEET
PRIORITY SY SY
SY
IMPROVEMENT GEN. OBJECTIVES ROOT CAUSES ‘1 ‘2
‘21
AREA 9 0
Reproduction of To reproduce and provide
learning appropriate learning resources Limited learning materials for
/
materials for pupils during the quarantine the modular learning
period
Medical Identify the pupils at risk and
Lack of medical supplies for
assistance provide them school learning /
the pandemic
kit
Awareness in Enhance gender Sensitive
Lack of time and financial
gender sensitive Teaching strategies /
resources
teaching
Preparedness in Poster-making and other There are hazards and threats /
calamities and enjoyable activities about in the school that may be
emergencies DRRM triggered by natural hazards
PLANNING WOKSHEET
GOVERNANCE
PRIORITY GEN. OBJECTIVES ROOT CAUSES SY SY SY
IMPROVEMENT ‘19 ‘2 ‘21
AREA 0
Assessment of facilities with the Increase population /
urgency of buildings demands for additional
Physical Implementation of the project buildings
facilities need BUILD by providing convenient, /
Old facilities need to be
to be improved safe, spacious and enough space improve and rehabilitate
and maintained Post assessment on the including water supply
improvement of the facilities /
CHAPTER 3 C
PLAN H
A
Project Title: Project Learning AT HOME (Learning thru Alternative Teaching, P
Honing Opportunities thru Modular Experience) T
E
R
Problem Statement: Education must continue to give hope and stability for
development of the learners but health and safety of learners and school
3
personnel are of utmost importance and must be protected at all times.
Table 4.1 shows the Project Work Plan and Budget matrix for Project Learning AT HOME.
Project Title: Project PROTECT (PROvide The Essential needs to avoid Covid Transmission)
Project Objective Statement: To provide medical assistance to pupils and teachers as they
safely return to new normal mode of education
Root Cause: Due to this pandemic we need to prepare not only the schools, learners,
administrators, and teaching and non-teaching personnel, but also the parents or guardians
of the learners
Table 4.2 shows the Project Work Plan and Budget matrix for Project PROTECT.
Problem Statement: Capacitate teachers to attend orientation and training activities on the
utilization of the distance learning delivery modalities, prepare instructional materials, and
plan the organization of classes in consideration of the learning delivery modalities to be
employed.
Root Cause: prepare appropriate alternative work arrangements guidelines to the field to
comply with prevailing policy, and to ensure safe work environment.
Table 4.3 shows the Project Work Plan and Budget matrix for Project STREAM.
Problem Statement: Administrative staff, teachers, parents, and pupils have limited
knowledge on Gender and development
*Information on gender
mainstreaming in K to 12
Education is improved
*Teachers participation
on gender trainings is
ensured 100%.
Table 4.4 shows the Project Work Plan and Budget matrix for Project GEM.
Project Title: Project BUILD (Building Unique and Intelligent Learners through physical
Development)
Problem Statement: Provide convenient, safe, spacious, enough space for teachers/pupils
where they could develop their talents, skills, self-esteem and confidence towards total
development
Project Objective Statement: Provide convenient, safe, spacious and enough space for pupils
and teachers
Problem Statement: There are different types of calamities like earthquakes, fires and floods
happening in our country.
Root cause: Some people are not aware on the do’s and don’ts during these calamities.
Project Title: Project SIESS (Sustainable Instant Enough Services and Supplies)
Project Objective Statement: To pay for the school’s bills, purchases and other MOOE
Keeps record
and liquidate
properly
Table 4.7 shows the Project Work Plan and Budget matrix for Project SIESS.
CHAPTER 4 C
MONITORING AND EVALUATION H
A
Progress Monitoring and Report Form P
T
To ensure that the implementation is properly reviewed for continuous E
improvement, the school’s monitoring and evaluation system takes note of the
R
performance indicators set for each PIA. This Progress Report form depends on
the timelines in the project design and for longer projects, SPT will have to
monitor more than twice. 4
To enhance the
capacity of
teachers in terms of
ICT
*Enhance gender
Sensitive Teaching
strategies
*Improve
information on
gender
mainstreaming in K
to 12 Education