The proposed unit used on raised floor area The units need to be used on raised floor. Vendor to
3 To be confirmed by the contractor confirm compatibility.
contractor confirm the same
9 Confirm equipment heat dissipation by specialist By Contractor Complied. Attached letter from ATLAS.
Confirm if one compressor out of service the other
10 compressor will be working and the unit provide Comply
50% of total load
11 Provide static pressure calculation Pressure drop on the perforated tile will be given by
Dhabi. Vendor to select the equipment.
12 Provide coordination layout showing actual Noted. Will be provided as a separate submittal