8 Storey Residential Bldg.

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Republic of the Philippines

City of Manila
OFrICE OF THE MAYOR

II.TEMORANDUM

TO ENGn. ARMANDO L. AhiDRES


Building Official

ENGR. RENE L, ECHAVEZ


Chie{, Processing Division

FROM: FRANCISCO M. DOMAGOSO


City Mayor

Proposed Eight (8) Storey Dormitory with Penthouse Building lmated at 956 P.
Ocampo 5t, Mal,ate, Manila owned by URBAN TIGER
CORPORATTON/ MARCTANO A. PADTLLA.
rr

On your representation that all the requirements under the National Building Code,
existing Laws and ordinances in connection with the above-indicated application have hen
complied with, you are hereby authorized to issue the requested permit.

The permit, howevet, may be revoked at any time for non-compliance with any
applicable law, ordinance, ruIe or regulation.

City Mayor
'ri
Republic of the Philippines
' City of Manila
OFF"IGfl OF' TUfl EIJILDING Of"r"[E[At

Date: JuIy 29, 20Ig


URBAN TIGER CORPORATION/
I\4ARCIANO A. PADILIA
Name of Permittee

Architect / Civil Engineer lri-Charge

Sir/Madam:

As the recipient of Buil.ding Permit No. 01-2019-000696-NC


dated 07/29/20L9 lor the

enumerated hereunder to ensure that the safety ofthe public in general are protected and not in dangered:

1. You shall be jointly responsible for the safety and protection of the general public;

2. A signal shail.be put up and conspicuously on the side in accordance with the prescribed dimensions
and required information shown in the attached pattem and shall remain pos^ted for the duration of
the project;

3. No enclosure of any kind shall be made on the sidewalk until the corresponding permit therefore has
been secured from this Office;

4. Any public facilities and/or utility shall be properly repaired and restored to its original condition at
your expensel

5. A copy of the duly approved plans and a logbook shall be kept, at the jobsite at all times;

6. Water wastes must be thoroughly sifted/screened before dischaiging into the drainage lines to avert
a
the accumulation of foreign materialp to prevent clogging there6r;e

7. Waste materials or rubbish shall not be allowed to accumulate beyond the construction site periphery
particularly on the sidewalk portion left for pedestrian travel;

8. Free and convenient approached to and use ofany fire hydrant, fire alarm box and manhole shall not
be obstructedl and

9. Other applicable minimum standard of safety 4nd protection shall be provided thereat consistent with
Rule XV, Implementing Rules and Regulation of the NATIONAL BUILDING CODE (p.D. 1096).

This Office reserves the right to suspend the building.activity authorized by this permit, should you fail
to comply with any or all of the foregoing stipulation and/or other perlinent provisions of the NATIONAL
BUILDING coDE (P.D. 1096) and its Implementing Rules and Regulations.

Very truly yours,

ARMANDO L. ANDRES
Buitding Official
Received:

Permittee

Construction tn-Charf
Republic of the Philippines
CITY OF MANILA
OFFICE OF THE BUILDING OFFICIAL

APPLICATION NO. PERMIT


AREA CODE
1-h It 6-ilr ,,1
)r n1 thld - l,{, ,.I I ^l'^
5/7 /20Le
DATE OF APPLICATION
BUILDING PERMIT Julyy2a, ^O1o
DATE ISSUED
D oRrcrNAL tl RENEWAL

BOX 1 TTO BE ACCOMPLISHED BY DESIGNING ARCHITECT/CIVIL ENGINEER IN PRINI)


NAME OF OWNER/APPLICANT IAST NAME, FIRST NAME, M.I. TIN

FOR CONSTRUCTION OWNED


Atufi%J ntal Aflf./ ?Mw fraArqr/tut A
FORM oF oWNERSHIP MAIN ECONOMIC ACTIVITY/KIND OF BUSINESS
BY AN ENTERPRISE
ADDRESS UO., STREET, BARANGAY CITY/MUNICIPALIry TELEPHONE NO.

2q/ P.6agrm,fi,t g..I*nt .)*rcr*/ cB


LOCATION OF CONSTRUCTION ctvtrlunrcrpeury
No., srREFt, BARANGAY

SCOPE OF WORK
?gt /rtta ofun q. hnl*tE ,&fr //tA
2 ADDITION OF oTHERS (SPECTFY)
3 REPAIR OF
t fi NewcoNsrnucroN 4 RENOVATION OF oI ,oF
5 DEMOLITION OF tJ _oF
USE OR TYPE OF OCCUPANCY
Contractors ta fees = 197, 468. 48/ B576468/7=5-20L9
RESIDENTIAL INDUSTRIAL

tt fl stNGLE 31 FACTORY/FLAT]1 so fl orHens (sPEclFy)


tz J DUpLE( 32 REPAIR SHOB MACHINE SHOP
rs l--l ROWHOUSVACCESSORIA 33 REFINERY
rcW oTHERS (SPECTFY) 34 PRINTING PRESS
35 WAREHOUSE
COMMERCIAL
Eight. (B) Storey Dormitory INSTITUTIONAL
21
22 dvith penthotise 41 tl scHool
23 HOTEUMOTEL, ETC. 42 l-J cHURCH AND orHER RELIctous srRucruRES
24
25
OFFICE CONDOMINIUM/BUSINESS OFFICE BUILDING
RESTAURANI, ETC.
43 LJ HoSP|TAL oR stMtLAR sTRUcruREs
26 SHOP (e.9. DRESS SHOB TAILORING SHOB BARBER SHOB ETC.)
44 LI WELFARE AND CHARITABLE STRUCTURES

27 GASOLINE STATION
28
29
MARKET
DORMITORY or OTHER LODGTNG HOUSE
+s I rHrerER, AUDtroRtuM, GyMNAsluM, counT
20 oTHERS (SPECIFY) 40 n orHERs (spEctFy)
OTHER CONSTRUCTION

tl SPECIFY
AGRICULTURAL

STREET FURNITURE, LANDSCAPING & SIGNBOARDS

71
72
n
I
PARKS, PLAZAS, MONUMENTS, POOLS, PLANT BOXES, ETC.
9LDI_W4!5S, PROMENADES, T.$RACES, LAMPOSTS, ELECTR|C POLES, TELEPHoNE POLES, ErC.
I

73 I OUTDOOR ADS, SIGNBOAHDS, ETC.


ruA
I

FENCE ENCLOSURE T

BOX 2 CtO BE ACCOMPLTSHED By THE RECEIV|NG & RECORDTNG SECTTON)

BUILDING DOCUMENTS (FIVE SETS EACH)

n strE DEVELoeMENT AND LocATtoN eLAN tl MEcHANtcAL pLANS & spEctFtcATtoNS


n ARoHlrEcruFlqL pLANs & spEctFtcATtoNS
\ n LoGBooK (i copy)
n srnucrunn( nEbror{sa conlpurAirorus -:
LJ oTHERS (SPECIFY)
D serurnnvleluyerNlc prhNls F;spEcrFrcAroNS
n ELEcTRTcAL pr-nr.rs L'spEoFfti

BOX 3 CrO BE ACCOMPLISHED By THE BU|LD|NG OFF|C|AL) tqaVJ 1

ACTION TAKEN: , ;,
,"o*.$:l$
q "--..
$fi+
rtq
: '
pERMrr rs HEREBy.GRANTED .,'/
sua.lepi fo rse FoLLowrNG
. .-,,'i,

CONDITIONS:

t. THAT THE PROPOSED CONSTRUCTION/ADDITION/REPAIR/


RENOVATION/DEMOLITION/INSTALLATION, ETC., SHALL BE IN
coNFoRMtTY W|TH THE "NAT|ONAL BU|LDING CODE" (p.D. 1096) AND
ITS CORRESPONDING IMPLEMENTING RULES AND REGULATIONS.
THAT A DULY LICENSED ARCHITECT/CIVIL ENGINEER HAS BEEN
ENGAGED TO PREPARE PLANS & SPEC}FICATION AND TO UNDERTAKE
eUr.-
THE SUPERVISION/INSPECTION OF THE CONSTRUCTION OF THE
PROJECT.
,/
THAT A CERTIFICATE OF COMPLETION DULY SIGNED AND SEALED BY
THE DESIGNING ARCHITECT/CIVIL ENGINEER AND THE
RRcHrecruCvrl ENeINEER tN-cHARcE oF coNSTRUcloN sHALL BE
$!-.. *t rlal,E -J-tt
SUBMITTED NOT.LATER THAN SEVEN C4 DAYS AFTER COMPLETION OF O}' F]{
THE CONSTRUCTION OF THE PROJECT.
rHnr n "cenrirrcnre or"pgtupANcy" sMLL BE sEcuRED pRtoR To
- '-;{ttuee'.
-.L--i-;
ACTUAL occuPANcy oEtrHd surLDrNc.
' &t'-ltt
'\''
NO s-"ujgg!
: --- -!o-electricaL/Fire safety & Mechanical requirements,
s PERMIT H,tAv se CANoELLED oR REVoKED punsu-e-ruYro siCr-ror.rToiISoo SFTne :,i,iiirdridL euriptNG coDE"
i'--
--5. -,",*-

BOX 3 (TO BE ACCOMPLISHED BY pESTGNtNG AECHTTECT/C|V|L ENGTNEER tN pRtNT)

NUMBER OF STOREYS:
auuorrlb e
.'
TOTAL FLOOR AREA:

PROPOSED DATE
OF CONSTRUCTION:
PLUMBING F

'f
itt?.1,t; \f\rr\" :.)t '
BOX 4 (TO BEACCOMPLTSHED ByTHE D|V|S|ON/SECT|ON CONCERNED)

ASSESSED FEES
AMOUNT.DUE' 'ASSESSEDBY O.R..NUMBER DATE PAID
E Leruo usgzoNlNc
n urue AND GRADE
f] eutlotNc SrIS*.SS *ffi .ffHFimp q aftryrffit
f] pr-urr/etNe lfiIlffiagB ..-l\:-" \ir\\ (\$,

n el-ecmrcRl $rffiffiffi
D Mecnnrvrcnl, WS*S$ ffi
OTHERS *tuq6r 4'
REVIEWED:
TOTAL CHIEF, PROCESSING DIVISION/SECTION

BOX 5 (TO BE ACCOMPLTSHED By THE D|V|S|ON/SECT|ON CONCERNED)

PROGRESS FLOW
NOTED: IN OUT ACrt9}ri PROCESSFD
CHIEF PROCESSING DIVISIONYSECTION TIME DATE TIME DATE REMARKS BY
RECEIVING AND RECORDING

LAND USE and ZONING


GEODETIC (LINF and GRADE) dt-7.7-td ,4-t/1.
ARCHITECTURAL
STRUCTURAL
.SANITARY

ELECTRICAL
MECHANICAL
WE HEREBY AFFIX OUR HANDS SIGNIFYING OUR CONFORM Y IU IHb INI-OHMAIION HEREIN ABQVE SI
BOX 6 Boxs n (.\/
ARCHITECT/CIVIL ENGINEER PRC REG. NO. SIGNATURE
SIGNED AND SEALED PLANS & SPECIFICATIONS
PRINT NAME
DEU
Yfu"U-V\APPLICANT
*x"Eit;-TtsIIff. RES. CERT. NO. DATE ISSUED PLATE ISSUED
PLACE ISSUED

srGNAruRE
-W%*t, l,^ j TIN

\ ";;;1
ft 1?l[E?Ygl'^iSUc".,tfR
PRC REG. NO
BOX I
TCT/CCT NO.
OO BE AC@MPUSHED By LOT O\^/NER)
TAX DECLARATION NO.

PRINT NAME OF LOTOWNER

ADDRESSIEC. Af, CIIITECT ADDRESS


?!!iaiego'*r,
*'rc^{iri.fFiF,sED PI.ACE ISSUED' RES. cERr.
fA-[oarrffrT I
PLACE ISSUED

spNNune r/4frV14/ TIN srcNAruRE


--ffi^.u. \u NN
r." g

Republic of the Philippines


CITY OF MANILA
OFFICE OF THE BUILDING OFFICIAL
APPLICATION NO" PERMIT

AREA CODE

JULY 29, 2OI9


DATE OF APPLICATION SANITARY/PLUMBING PERMIT
BOX 1 (TO BE ACCOMPLISHED BY SANITARY ENGINEER/MASTER PLUMBER IN PRINT)

NAME OF OWNER/APPLICANT LAST NAME, FIRST NAME, M.I. TIN


/tt? EA^t Tlstr7L hrfl ' / htt ttt t '
PnDLlx /Ttrrt
No.. eldnNenv. ctrylMuNtctpAuw
srREET.
24/ F. (a*-Vxnn* C. (nl, /rs,*t)lr7V
ADDRESS TELEPHONE NO.

LOCATION OF INSTALLATION ,/1 . NO.. STREET. EANNNON?. CITY/MUNICIPALITY


7-(l Prtgu lhsPn <n hLfr/E, nH/lA
SCOPE OF WORK N ADDITION OF OTHERS (SPECIFY)

,dsrnclE
E REPAIR OF n OF
E REMOVALOF tl OF

USE OR TYPE OF
.{..RESIDENTIAL NAGRICULTURAL
f]cotrrueRcnl f]PARKS, PLMAS, MoNUMENTS
fltruousrntnl InecReRrrorunl
flrrusrrrurroruel EOTHERS (SPEcIFY)

FIXTURES TO BE,INSTALLED:
NEW EXISTING KIND OF EXISTING Ktl ID OF
OTY. FJXTURES FIXTURES FIXTURES FIXTURES Flr rURES
n T-l WATER CLOSET
FLOOR DRAIN
BIDETTE
LAUNDRYTMYS.
LAVATORIES -
DENTALCUSPIDOR
KITCHEN SINK GAS HEATER
FAUCET ELECTRIC HEATER
SHOWER HEAD WATER BROILER ,

WATER M€TER DRINKING FOUNTAIN


GREASE TRAP BAR SINK
BATH TUBS SODAFOUNTAIN SINK
SLOP SINK LABOMTORY SINK
URINAL
n
"n
STERILIZER

f:l
AIR CONDITIONING UNIT
w4rEq -rANr(REsERVot R
tl
il
SWIMMING POOL
oTHERS (SPECTFY)_
Ltt,t,l-
.;.i,'"'ry
ff**,ro*".*ER .YSTEM Kg*nnDRATNAGE,sYSTEM

WATER SUPPLY: sYsTEM OF DtSPO5a;-. {*, ; rl*'iir:,dl Y


l--l sHRrl-ow well . l--l;wnsre wATER TREATMENT PLANT
l--l oEsp wru& PUMP sET E senrc vAULT/IMHoFF TANK
fl l-l sRrurrnRv sEWER coNNEcloN
Eor /E l--l sue-suRrncE sAND FTLTET'. t

NUMBER OF STOREYS OF BUILDING

/o
PROPOSED DATE
START OF INSTALLATION
OF INSTALLATION F
EXPECTED DATE
PREPARED BY:
OF COMPLETION

BOX 2 (TO BE ACCOMPLISHED BY SANITARY ENGINEERING/MASTER PLUMBER IN PRINT)


ACTION TAKEN
PERMIT IS HEREBY GRANTED TO INSTALL THE SANITARY/PLUMBING
ENUMERATED HEREIN SUBJECT TO THE FOLLOWING CONDITIONS:
__:iE_--1iiiTf.,-.''
RSW. L"HC}IAVEZ
1. THAT THE PROPOSED INSTALLATION SHALL BE IN ACCORDANCE
WITH APPROVED PLANS FILED WITH THIS OFFICE AND IN
CONFORMIry WITH THE NATIONAL BUILDING CODE
THATA DULY LICENSED SANITARY ENGINEERING/MASTER PLUMBER
BE ENGAGED TO UNDERTAKE THE INSTALLATION/CONSTRUCTION
THATACERTIFICATE OF COMPLETION DULY SIGNED BYASANITARY
ENGINEERING/MASTER PLUMBER IN.CHARGE OF INSTALLATION SHALL
BE SUBMTTTED NOT LATER THAN SEVEN (7) DAYS AFTER COMPLETTON
OF THE INSTALLATION.
THAT A CERTIFICATE OF FINAL INSPECTION AND A CERTIFICATE
OF OCCUPANCY BE SECURED PRIOR TO THE ACTUAL OCCUPANCY
OF THE BUILDING.

PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTION


- APPLICATION'S COPY PINK . TREASURER'S COPY YELLOW. NCSO COPY BLUE - BUILDING OFFICATS COPY GREEN . ACID COPY
BOX 3 (TO BE ACCOMPLTSHED By THE RECE|V|NG & RECORDTNG SECTTON)

BUILDING DOCUMENTS
l-l sRutrnny pLUMBTNG eLANS & spEclFtcATtoNS I cosr ESTTMATES

I erLL oF MATERTALs E oTHERS (sPEctFY)-

BOX 4 (TO BE ACCOMPLTSHED By THE DtVtS|ON/SECT|ON CONCERNEO)

BOX 5 (TO BE ACCOMPLISHED By THE DtVtS|ON/SECT|ON CONCERNED)

PROGRESS FLOW
.NOTE
IN OUT ACTION/
PROCESSED
REMARKS
. CHIEF.PROCESSING.DIVISION/SECTION TIME. DATE TIME DATE

RECEIVING AND RECORDING

"GEODETIC (LINE AND GRADE)

SANITARY

WE HEREBYAFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREINABOVE SETFORTH

Box6 nlll ?
SANITARY ENGINEER/MASTER PLUMBER SGNATURE
SIGNED AND SEALED PLANS & SPECIFICATIONS

C:-!'LLEFMO Ar DE LEON
\l/di'.V
"APPLtCdrur
EEG- eiull.txclxEEn t tl00
RES. CERT. NO. DATE ISSUED PLACE ISSUED

'-- i! .'J.**. tt.:i.,ir JS'


' 1\'$\',:.', r:i I
'.

SANITARY ENGINEER/IUASTER PLUMBER


IN-CHARGE OF INSTALLATION

r-Foit
# 6108
Fd.

ipl"'.. . "

h.2 Fdh 0l lRcwcd 0tiAlardl't9t9l

$ryu[Iir of t]1t fit1rli1ryi rus


6itg ot /ffiunilu
OFFICE OF THE.EUJLDIN6 OFFICIAL
APPLICATION NO; PERrriT Nb.
i'i
_l
CATE FILED MECHANICAL PERMIT ..^. DATE
'i
\pEfnuLA\\o t t DNtl
I
I
I

iJOX 1 IO BE FIULED.UP IJY PROFESSIONAL ITECHANICAL EI,JGINEER


N-{ffi
I n t a ^A

"uEk

flADDrroN or
fiNeV.t TNsTALLATToN i.-I REMOVAL oF
f,i ornens (sPEcrFU-_
nis
i @ESIDENTIAL fiAGRlcuLrLrRAL
frionrruenctru- n UNDScAPING
flruousmnr E orHERs(sPEclFY)
I
jrrusrnui-eror\i & oPERATToN oF
[] INSTITUTIONAL gl/l:,--___', .

i
t:
l-leorlrR n cErurnRltzEo AtR-coNotTioNtNG trQuMewnffrR
I
j LJPRESSUREVESSEL I uecHnrutcAL vENTILATIoN ZIRuups
IrrurrnNAL coMBusTroN ENGTNE [] EscnutroR I cgupnEssEDAut, vAcuuM,
i [_] REFRT0ERATTON & rCE MAKTNG flrr,tgvttJc stoEwALK INSTTTUTIONAL and/or INDUSI.RIAL GAS
ii fuNDowTYPEAtR-coNDnoNtNG
AIR.CONDITIONING
IPACKAGE TYPE AIR
FREIGHT ELEVATOR ff PNEUMATIC TUBE,
and/or.M0N0RAll:
coNVEYoR
LJPACKAGE ELEVATOR
[]ornEns (sPEcrFY)
PROPOSED DATE
OF INSTALLATION
., 4r '/i .il
TOTAL INSTALLATION COST PREPARED BY

PERMIT IS HEREBV GRANTED TO INSTALTTHE MECI{ANICAL EOUIPMENI


APPRO'/ED \.
ENTIMERATED HEREttl SUzuECTT0 THE F0LLOWING CONDIIIONS:
ROCTEHOYIJEGASPI
7 I,HAT THE PRopasED INITALLAIIIN IHALI, EE Iu TTCCoNiNTE WTTH AP.
PROVED PLANS FIL,ED WTH THIS OFFEE AND IN CCI'IFQRMITY WITH TTIT
NATNNALEUILDINC CODE

2 THATA OIILV LICENSED PROFESSIONAL MECHANICAL ENGINEER BE ENGAGED tsy:


TA LINAERTAKE THE INSTALUTION

i THAT A CERTIFICATE AF COMPLETION DULY 8Y A PROFESSIONAL


'IGNED SHA:LL BE SUBMII\ ED
MF.CHANICA'L ENGINEER IN CHARGE OF INSTALI:ATION
NOT LATER TI,IAN SEVEN O DAYS AFTER COMFLETION OF TIIE INSTALUTION

4 THAT A CERTIFICATE OF 1INAL INSPECTION AND A CERIffiATE AF OCCU.


PANQY 8E SECUREO PRIOR A THE ACTUAL OCCUPANCY OF THE SUILDINS

5 THAT AN ANNUAL CERTIFICATE CF INSPECTION SHALL 8E SECURED FAR THE f-aa-edn


CCNTINUOIIS OPFRATION OF THE MECHANICAI, EOUIPMENT INSTALLED

NOTE: IHIS PERMIT MAY BE cANCELLED 0R REV0KED PURSUANTT0 SECTIONS 305 & 306 OF,THENATI0NA{i BUILDING C0DE
I\,IECHANICAL DOCUM EI'JTS I

I
Fn/E (5) SE"rS EACr-l
. ,l
! u ecnaucAL pt-ANs & sPEcrFtcATroNs '[JHTLL OF MATERTALS
(sPEcrFY)
Dcosr ESIMATES fJo'rxens
_.-_--.-J
___-.*_l
ASSESSED FEES.

-.1

wE HEREBYAEFIX OURIIANDS SIGnrrflNG OUR CONFORN,IiTY TO TTIE INFORMAnON HEREIN.{BOVE SET FORTII
Bdx 6 BOX s

PROFESSIONAL MECHANICAL ENGINEER

qcv
SIGNED & 5EALED PLAN5 &SPEGIFICATIONS

NAME
MARCELO S.'T
Pft( s 1578, TtN I 12t-371.17t

APPLI.CANT

pRoFESSToNAL T4ECHANICAT ENGINEtR


PRC# 1578, TtNf 129,371-179
I
L

Republic of the Ptulippines


City of Manila
DEPARTMENT OF ENGINEERING & PUBLIC WORKS
Drafting & Survey Division

Fite No. E%' ?bg


STREET LINE AND GRADE

Zsse:---Dis
Applicant: Address: lbtr'
DateReguested: 4'b _ .20t_3____OateSubmitted. q'x_* * 2016- ___
Note: Shown on the nearest corner, the expropriation and appropriation parcel, if .uy, state whether the linegr,i'en is the
"new" approved street ltrie or "old" line and its $'idth, and also show G.E. plan at least rluee official Frxed points.
The pornt or marhs set on the ground by dre Surveyor are good for street line only" The owrler or applicaut for
permit should veriflt fitst the ptoperty monumeflts as per tirie. fhe City Engrneer is not responsrble fbr any nrisraire made
by the owner or lus repre sentatile for not building within the llrnits of his orvn lot-

Scale: I
' '1g: '
t',t

Adopt Elev.: d, d; Al

Above:

*'ts
\p\-

\,--

-tfr
E,
tv
*Flt"1"
''
"l(

adrcc-rN,/ /-*r*.-=ro AFPROYEDT


Lot No. { N"a i'dr-ri;
pRQ Pcs/?5ift{o.: By Autrrority ortrre city u"#"Y$rue*l
Area: -Blk.
Rerdstered C)urner:
o il- N.,.,
Amount P
Measured &Sketched by: ,W4 lqezo
. EngineerV
Action Taken by Oftff & Survey Division
JRG/03
fa*z.tn.
I FLB 7A$
Y $ng

[1
I,
o+/.e /-'r7
REPT'BI,IC OF TNN PTf;TI..NPPIKES
Otff of ma&i[&
TAI{GGAPAI{ I$G PUHOffG BARANSAY
EARAITGAY ?S0 - golxE - 79, DIS|trRICT V
996 Pablo Ocarnpo Sr. Et'" Malate. ffianila Te[" Hs.: V14-Z8X4.

CERTIFICATION
Antonio C" Abad
Punong BarangaY

Myrna M. Masa
Council on Appropriation TO WHOM IT MAY CONCERN,
an d l,ive li hood Program

This is to certiSr that URBANTIGER CORP. / MARCIANO A"


Ester C. Panabi
Council on Education / PADILU\ is hereby granted for Building permit located at 956 Pablo
Women and Protection oJ' Ocampo.St. Malate Manila. The implementation must provide with the
Children.
following provision.
Elpidio S. Laurel 1. The rules and regulations of National Building Code of the
Council on Senior Citizen
and Pltysical F-itness ,'SPttrts Philippines should be followed to protect the safety of the public.

Esterlita A. Gardose 2. Working hours will be B:00 arn, To 5:00 pm.


Council On Disester / 3. They will provide a working perimeter fence for public safety
Management and Public
Safety 4 .They will shoulder any damages to both public and private

Ma.Lilysa B.Castillo Property during the construction


Council on Environmental ,'
S.They will give a time table of construction to barangay
Health, Nutrition and
Sanitation 5. They will make sure that the construction site will be properly

Alano Olano secured.


C.ouncil on I'eace anrl Order

Antonio A. Silvino This certification is issued upon the request of the above
Cotmcil On Puhlic mentioned narne for the purpose of Securing Perrnit frorn the City of
Maintenance
Manila without the said permit this Clearance is Null and Void'
Rafoncel delos ReYes Issued this 7m day of Feb. 2019
Secretary

Processed by:
Bernadette M. Bautista
Treasurer

RAFO ANTONIO C.ABAD


Jomel S. Liboon
SK Chqirman Secreta Barangay Chairrnan
NGPARTEMENT @F LAEOR ANE} ENffiPL@VFSEF*T i

#SmtBoma$ GapFtaB ffiegForru


DOLE"I$CR Bldg,, 967 Maligaya $t,, Mlalate; lllanila

i I a.l+'i0.!i}i1$"ncr"0345
)

BY 'r'i-iE 6U#+0RiTe ItJt=

tutARc*l\NCI P.An{L$-4" Frcm:


Otrner
S50 F. ecarnpo St.
,\jalate Manila
Pages: 1 Faga sniv
Date: ianuani -"1 , 2019
€lnai!: g,ii'€€UgfuLCI-f(rrucit nSAgI]elccl:

seshiec€r APPROVAL OF e#h,sTRUGTlQ&l $Atr'HTY A.ruD F{€ALTFi FR6GRA[i$


Yr?s?sr?sltted hy: __ $ent yhrqi: I Fax J Es"?BeiB C lilSait

P;'ojectTitle pRoPoSED EIGr-{T', {8} STOREY B[.ilLDlNG


Location 9SB P.ocarnpo St.. frfiatate M*nila
Ftolect tioi-, ial/ Resicientis$
Prcject Owner fuTarcrano Fadilla
A.npointed Safety Of*cer enantes S. Fq.:entes
Aioer
Aopointed First J*eehei {q,. A{bueno
Workers"----"*"
Toial Nurnber of : $work'eis-
Duration of the Frojeci *_
Stail
Date of Estimated : Febjqqry "i. tC15
--**-_-*"-
Estimated Conipleticn c{tlre Froject.**_: .4}rigupt_L=ffS_-'__
No cf Sub-contract+is : ,h{one

ihs i'efers to the above captiane# Construc{ion Safery and Heatth li'ogra;i-i LC.SI{P) which r,^ras subrnifiecj io thrs
Office cr"r January 31 . 2019 in co{npiiance wirh tile regulrernents ef Departnreni iJrder l\o. 'i3 senes *r 'igp8
Based cn the evaluation of the reguirer.rrents, sard Prograrr satisfactorily cornDiied with D.O. 13 s 1gg8.

ln uiew":l the folegoing, the irrsiani C$HF is hereb3i AFFRCIVEi=r for inrprenrentatlon ir': ihe abcvrrnenriofle{l
proieci. The main/generai ccnilattor- sitail be responsibie ;n ensuring rts sr.rb-contractors' cornpliai'rce with the
orovistot1s of DQ 13, specificaiiv $n ihe lmpiernentalicn 'i: a sriitatrie CSH Program desrgneo ioi the specific
vuorK to o* done by tile sub.ccltractor.€.

Thrs approval is without prejr;drce tp csmpliance witn ths require:xents fci- the subnrission of tlre Ceilittcate of
lnspection and Testing of Csnsiruciior"r iieavy Equipmenr. or its accledrtec testing organization pursuant tD tne
i-equrrements of Section 10 ci ilO 13. in case said hea'4, equipment rviti he Lrtiiized in the pioject.

Lii<ewise. the approved CSHP shail not be limitedio ;ts ex'sting orcvislons bui rnay inctucle otner systerns anc
proceCures applicable to the p;'cjeci. The CSHP maybe be revlei,veei by rhe main contractorfrsm time tc irrne tc
modi$ oi include appropriate slrstetris and proc€dr-rres urhich mi.lst be rn accorriance vtrith ti\e presc;"ibeci
stendarcis rules and fesulatisns

l-et a copy c? ihis letter ls iurnisir*d th,e tcnqe*ng agenc:v' airi:i lii+ aporc;naie iGu fri iRe:r fesoec11,e
infor*ation andlaction as th6:1 cleem it.
Rnpublic +f f he Philippin*s
E|TY Srt-"6,f{hfiNnl & I}SltLfIr*MHNT nFFlSE

&E,N'NE {Prlor
F'EF|MTT
to Suilding F*rrnit}
Iqe 1 520?
effi

*.IEtrT]IhETI\/ITY pRoposED SEVEN-STOREY REs't- BLDG. Wl MEZZ, W


HINEi
t*ch#rutlffiniHn.nN MEDIUM TNTENS|TY COTUMERCTAL / rUXrO-USE ZONE (C-2IMXDI
",.ffi
,"ffi

....''..
;,;ff
R C[f,rH/h M. {covered} I #ffi
1,759.83 5Q. Z5Si59 SCl, M. (openl' ..,

.''

$frl ,;-ffi
!lru!
956 P. OCAMPO ST., MALATE .-)-ffi

246.6a SQ. M.

URBAIIITIGER CORP.

?01q-fi3.276 s[ISJ EgT TO IN$PECTI$H APPFO


Rsference No.
FOR INSPECTION UPON CONSTRUCT|oH
{Not V*iid withcut Offi*i*} Seuli
8250t27
O. R" Nei- *ity Plannin
PHP 23,795.31 April t,20tg
Amounf trsfe {mm/ddfVr}
FAll-URE TO COMPTY wiih ihe Terms ond Condilions written ol lhe bock he.eof sholl couse lhe lM^iEDIAIE REVOCAIION of ihis Permit

You might also like