Oracle BPM Suite 11g Training
Oracle BPM Suite 11g Training
Oracle BPM Suite 11g Training
• Objectives
• WorkSpace Panels
• The WorkSpace Task Panel
• The WorkSpace Process Panel
• The WorkSpace Dashboard Panel
• The Workspace Administrative Panel
• Administrative Functions
Oracle BPM Workspace
Task management, process tracking &
performance dashboards
© 2009 Oracle Corporation – Proprietary and Confidential BPM Methodology Workshop Rev 3.0
WorkSpace – Task Panel
Views
BEA Confidential
WorkSpace Task Panel
• The Task Panel will show
associated task items in an Email
Inbox like format.
• There are pre-built Views to filter
the task items.
• The default view is “Me & Group”
and status set to “Assigned”. This
view shows pending work for
participants in a given role or
responsibility.
• Selecting a Task item will bring up
the associated user interfaces.
• The participant can also trigger
Actions from the Task Panel
without invoking the user interfaces.
BEA Confidential
Searching Task Items …
• The WorkSpace provides a very powerful search function to locate in
task items that can be filtered by predefined attributes and process
specific ones
• The Searching can be enabled by clicking on the “Show Filters” link in
the Task Pane. The result will be shown in the Task Panel
• Task Items can be searched and narrowed by:
• Processes, Predefined and Process specific attributes, Task Items Status (in flight,
completed, aborted)
BEA Confidential
Workspace – Process Panel
Applications
tab is used
to globally
initiate
processes.
Clicking on a process
instance shows the status
and the Interactive Task
where it might be pending.
© 2009 Oracle Corporation – Proprietary and Confidential BPM Methodology Workshop Rev 3.0
WorkSpace Process Panel
Oracle Confidential
WorkSpace – Standard Dashboard
BEA Confidential
Workspace – Administrative Tasks
BEA Confidential
Workspace – Administrative Functions
© 2009 Oracle Corporation – Proprietary and Confidential BPM Methodology Workshop Rev 3.0
Workspace – Administrative
Functions
© 2009 Oracle Corporation – Proprietary and Confidential BPM Methodology Workshop Rev 3.0
Day 2
• Lab 4