Resume: Mohd Reimey Bin Ahmad

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 9
At a glance
Powered by AI
The resume outlines the applicant's work experience in mechanical fitting, piping, and as an RV technician over the past 20 years working on various projects in the oil and gas industry.

The applicant has a Sijil Pelajaran Malaysia qualification from 1996 and over 20 years of work experience in relevant technical roles.

The applicant has held positions including mechanical fitter, pipe fitter, supervisor, and currently works as an RV technician.

RESUME

MOHD REIMEY BIN AHMAD

PERMANENT ADDRESS
SU 100, JLN TERENDAK HEIGHTS 4,
TAMAN TERENDAK HEIGHTS,
76300 SUNGAI UDANG,
MELAKA

CONTACT NO. : 013 – 601 4582(HP)


012 – 9062776 (HP)

D.O.B. : 22nd OCT 1979


PLACE : NEGERI SEMBILAN
RACE : MALAY
NATIONALITY : MALAYSIAN
I/C NO. : 791022 – 05 – 5015
RELIGION : ISLAM
LANGUAGES : B.MELAYU & INGGERIS
AGE : 32 YEARS OLD
SEX : MALE
MARITAL STATUS : MARRIED
HEALTH : EXCELLENT
EMAIL : [email protected]

QUALIFICATIONS

NOVEMBER 1996 SIJIL PELAJARAN MALAYSIA


SEK MEN KEB SG UDANG
WORKING EXPERERIENCE

DATE : August 1997 – May 1998


POSITION : Semi Skill Piping
COMPANY : Kamab T.T Sdn Bhd

PROJECT : Project Psr 2 at PP(M)SB

DATE : November 1998 – December 1998


POSITION : Mechanical Fitter
COMPANY : Equator Engineering Sdn Bhd

PROJECT : KR 2, AROMATIC at TERENGGANU

DATE : March 1999 – June 1999


POSITION : Mechanical Fitter
COMPANY : Permit Engineering Sdn Bhd

PROJECT : KR 2, AROMATIC at TERENGGANU

DATE : August 1999 – December 1999


POSITION : Mechanical Fitter
COMPANY : Warga Hikmat Sdn Bhd

PROJECT : OPERATION BATTERY LIMIT AT PP(M)SB PSR – 2

DATE : January 2000 – January 2001


POSITION : Mechanial Fitter
COMPANY : Science Tech Solution Sdn Bhd

PROJECT : Maintenance Mechanical Job at PP(M)SB

DATE : February 2001


POSITION : Mechanical Fitter
COMPANY : Science Tech Solution Sdn Bhd

PROJECT : Mini Shutdown at U – 24


DATE : July 2001
POSITION : Mechanical Fitter
COMPANY : Warga Hikmat Sdn Bhd

PROJECT : SHUTDOWN SHELL REFINERY PORT DICKSON

DATE : August 2001


POSITION : Mechanical Fitter
COMPANY : Science Tech Solution Sdn Bhd

PROJECT : SHUTDOWN AT U – 34 PP(M)SB

DATE : April 2002 – May 2002


POSITION : Leadman
COMPANY : Mushtari Maintenance Sdn Bhd

PROJECT : AIR FAN COOLER (AFC) AT KR – 1 KERTEH TERENGGANU

DATE : May 2002 – June 2002


POSITION : Leadman
COMPANY : Mushtari Maintenance Sdn Bhd

PROJECT : RV
-to remove rv and blinding activities
-to do services and overhaul
-to do final test and pop test
-to do tagging number
-to deblinding and reinstall activities

DATE : August 2002 – September 2002


POSITION : Supervisor
COMPANY : Mushtari Maintenance Sdn Bhd

PROJECT : GPP 4, 3rd TURNAROUND AT PGB TERENGGANU


DATE : January 2003 – March 2003
POSITION : Supervisor
COMPANY : Science Tech Solution Sdn Bhd

PROJECT : HYDROJET TEAM AT U – 32 (PSR – 1)


-to do cleanning cooker at V – 32201

DATE : April 2003


POSITION : Supervisor
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : HYDROJET TEAM AT U – 32 (PSR – 1)


-to do cleanning cooker at V – 32201

DATE : April 2004


POSITION : Mechanical Fitter
COMPANY : Mushtari Maintenance Services Sdn Bhd

PROJECT : TURNAROUND – PHASE 3 AT PP(M)SB MELAKA


-to remove and blinding RV and CV
-to services and overhaul RV
-to do touch-up painting body RV and CV
-to do tagging body RV and CV
-to deblinding and reinstall RV and CV

DATE : June 2004 – August 2004


POSITION : SUPERVISOR
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : HYDROJET TEAM AT U – 32 PP(M)SB


-to do cleaning COOKER AT V-32201

DATE : 7 September 2004 – 12 October 2004


POSITION : Mechanical Fitter
Company : Rahab Co. Engineering & Const

PROJECT : TURNAROUND at ASEAN FETERLIZER BINTULU


-to blinding and deblinding activities
-to do cleaning vessel
-stand by operation
DATE : 19 October 2004 – 13 November 2004
POSITION : Pipe Fitter
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : Piping at U – 32 at PP(M)SB


-to fabricate spool and pipe line at wksp
-to fit-up and install pipe line

DATE : January 2005


POSITION : Supervisor
COMPANY : Green Base Supplier Sdn Bhd

PROJECT : Hydrojet Team at U – 32


-to do cleanning cooker at V – 32201
-to do cleanning tube bundle
-to do cleanning tank T – 73201

DATE : 18 April 2005 – 10 May 2005


POSITION : Pipe Fitter
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : Sample Cooler Line


-to do fabricate spool and line at wksp
-to install pipe line at U – 25

DATE : 18 May 2005 – 13 June 2005


POSITION : Pipe Fitter
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : Install New Water Line at U – 28


-to fabricate spool and line at wksp
-to fitt-up and install pipe line

DATE : 20 June 2005 – 15 July 2005


POSITION : Pipe Fitter & Permit To Work ( PTW )
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : Install Pipe For Steam Line at U – 32


-to request permit
-to fabricate and install pipe line
DATE : 18 July 2005 – 14 November 2005
POSITION : Pipe Fitter & Permit To Work ( PTW )
COMPANY : Newwin Engineering Sdn Bhd

PROJECT : Replaced Line Steam Trap at U-32


-to request permit
-to install pipe 1” and 2”
-to replace steam trap valve at U-53

DATE : 16 November 2005 – 28 February 2006


POSITION : Pipe Fitter
COMPANY : Fitrah Resourcess Sdn Bhd

PROJECT : Replaced Water Line at WEST PORT,PORT KLANG SELANGOR


-to replace and install pipe 8” and 10”

DATE : 1st March 2006 – 3rd August 2006


POSITION : Pipe Fitter
COMPANY : Science Tech Solution Sdn Bhd ( STS )

PROJECT : Fabrication Team At Workshop Area at PP(M)SB Melaka


-to fabricate sample cooler box at U-21
-to fabricate caustic transfer line ¾” chemical injection at U-67
-to fabricate and install new line ¾” at T-5601 and T-5603
-to fabricate and install new line 2” stripping line
at CB-1,CB-2 and CB-4 Jetty
-to fabricate shelter pump and fabricate new line pipe 3/4”
at T-33252

DATE : 7 August 2006 – 31 August 2006


POSITION : Mechanical Fitter
COMPANY : General Electrical Water Process Treatment ( GEWPT )

PROJECT : to supply demin water to cogen plant


DATE : 11 September 2006 – 21 September 2006

POSITION : Mechanical Fitter & Permit To Work ( PTW )


COMPANY : Mech Ma Concern

PROJECT : MINI SHUTDOWN AT MELAKA LUBE BASE PLANT ( MLBP )


-to request permit
-to remove and install RV and CV
-to services and overhaul RV
-to do tuch-up painting body RV and CV

DATE : 30 October 2006 – 05 April 2007


POSITION : Fitter Structure And Permit To Work ( PTW )
COMPANY : Local Engineering Sdn Bhd

PROJECT : Install New Emergency Exit Route


-to request permit
-to fabricate and install a new emergency exit route at U – 32 ( PPMSB )

DATE : 11 April 2007 – 22 June 2007


POSITION : Pipe Fitter & Permit To Work ( PTW )
COMPANY : Maser Marine Sdn Bhd

PROJECT : Water Pump at U-21


-to request permit
-to fabricate pipe spool 4” and 6”
-to fit up and install pipe line 4” and 6”
-to install pipe support
DATE : 2nd July 2007 – 19 january 2008

POSITION : Pipe Fitter


COMPANY : Consortium Lurgi Malaysia Sdn Bhd,Larsen & Toubro
Umiten And Kejuruteraan

PROJECT : MG3 Lube Base Oil Project


-to fabricate spool and install new pipe line 2”,4”,6”
8” and 12” at U-76 OMS.
-to fabricate pipe support and install pipe line 6”.
-to install and fit up pipe line 3”,4”,6” and 18”.
-to install gate valve 3” and check valve.
-to install and fit up inlet and outlet line for T-7544,
T-7545 and T-7546.
-to install gate valve,MOV,pipe support and pipe spool
at T-7548.
-to fit up and install pipe line 18”,6”,4” and 3” to T-7577

DATE : 21st January 2008 – 29 November 2008


POSITION : Pipe Fitter & Welder Support
COMPANY : UBF Maintenance Sdn Bhd

PROJECT : L.P Compressor at UBF workshop


-to start up UBF workshop
-to fabricate and welding pipe support for LP Compressor at U – 30
-to fabricate pipe spool and install new pipe 4”and 6”
-to install and fit up inlet and outlet line
-to support RV team and maintenance job at PPMSB

DATE : 1st December 2008 – Present


POSITION : RV Technician and Permit To Work ( PTW )
COMPANY : UBF Maintenance Sdn Bhd

PROJECT : Remove,Initial Test,Service,Final Test And Install RV


-to request permit
-to remove RV and blinding
-to do initial test and leak test
-to service,lapping disc and nozzle
-to do final test,pop test and tagging no
-to deblinding and reinstall RV
SUPPLEMENTARY

If and when employed by the company

Start work : immediately


Willing to travel :
Willing to be relocated : will consider

REFERENCE

Name : En. Zulkharnine Bin Omar


Relationship : Manager
Position : Operation Manager
Company : UBF Maintenance Sdn Bhd
Telephone : 019 - 6586767
Email : [email protected]

You might also like