Project Execution Marubeni Organization Chart - Site Tambak Lorok Block 3 Semarang
Project Execution Marubeni Organization Chart - Site Tambak Lorok Block 3 Semarang
Project Execution Marubeni Organization Chart - Site Tambak Lorok Block 3 Semarang
Project Team
Project Manager
Technical Project Manager
Vaibhav Satoshi
Chauhan Terano
Site Team
Site Manager
Stefano Bruno
Administration
Manager Site Material Mechanical Installation Electrical / I&C Commissioning Site
(Secretary for SM) Controller Lead Contract Manager Site Civil Manager Manager Installation Manager HSE Manager QA/QC Manager Manager Scheduler / Planner
Tiara Putri Ikhsani Camilo E Mana TBA TBA TBA TBA Edilmer C Guanlao Antonio T. Zarate TBA Arif Setiawan
Mechanical Installation
Engineer Electrical Installation QA/QC Engineer Commisioning Lead
Document Controller Civil Lead Engineer (HRSG) Engineer (BOP) HSE Superintendent (Civil) Engineer I&C
Sasmito Agung
Rachmatu Sa'diah Richard Tan Relunio TBA TBA Wisnu Kirono TBA
Wicaksono
Mechanical Installation
Engineer QA/QC Engineer Commisioning Lead
Document Controller Site Civil Engineer (BOP) HSE Superintendent (Mechanical) Engineer Mechanical
Jerrald Macatangay
Agusta Fitrianto Hariyanto TBA
Manalo