Particulars Quantity Unit Price Total Sub-Total

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

BILL OF MATERIALS

PARTICULARS QUANTITY UNIT TOTAL SUB-TOTAL


PRICE
 
I. Concrete Works:          
  1.) Footing          
  Cement 20 Bags 210.00 4,200.00  
  Sand 1.13 cu.m. 500.00 565.00  
  Gravel 1.2 cu.m. 500.00 600.00  
  12mm4 Stl. Bars 27 pcs. 215.00 5,805.00  
  2.) Column          
  Cement 30 Bags 210.00 6,300.00  
  Sand 2.05 cu.m. 500.00 1,025.00  
  Gravel 2.17 cu.m. 500.00 1,085.00  
  12 mm4 Stl. Bars 75 pcs. 215.00 16,125.00  
  9 mm4 Stl. Bars 53 pcs. 105.00 5,565.00  
  #16 Tire Wire 7.5 kls. 70.00 525.00  
  3.) Roof Beam          
  Cement 30 Bags 210.00 6,300.00  
  Sand 1.95 cu.m. 500.00 975.00  
  Gravel 2.1 cu.m. 500.00 1,050.00  
  12 mm4 Stl. Bars 38 pcs. 215.00 8,170.00  
  994 Stl. Bars 55 pcs. 200.00 11,000.00  
  #16 Tire Wire 7.5 kls. 70.00 525.00  
  Cement 30 Bags 210.00 6,300.00  
  Sand 1.95 cu.m. 500.00 975.00  
  Gravel 2.1 cu.m. 500.00 1,050.00  
  12 mm4 Stl. Bars 38 pcs. 215.00 8,170.00  
  994 Stl. Bars 55 pcs. 200.00 11,000.00  
  #16 Tire Wire 7.5 kls. 70.00 525.00  
  4.) Wall Footing          
  Cement 40 Bags 210.00 8,400.00  
  Sand 3 cu.m. 500.00 1,500.00  
  Gravel 3.17 cu.m. 500.00 1,585.00  
  10mm Stl. Bars 27 pcs. 148.00 3,996.00  
  #16 Tire Wire 1.3 kls. 70.00 91.00  
5.) Concrete Hollow      
  Blocks Walling:    
  6" CHB 2500 pcs. 17.00 42,500.00  
  10 mm Stl. Bars 210 pcs. 148.00 31,080.00  
6.) Filter and      
  Mortar:    
  Cement 104 Bags 210.00 21,840.00  
  Sand 8 cu.m. 500.00 4,000.00  
  Gravel 8.33 cu.m. 500.00 4,165.00  
  7.) Plastering:          
  Cement 60 Bags 210.00 12,600.00  
  Sand 6 cu.m. 500.00 3,000.00  
  8.) Flooring          
  Cement 150 Bags 210.00 31,500.00  
  Sand 10.5 cu.m. 500.00 5,250.00  
  Gravel 11.25 cu.m. 500.00 5,625.00  
  Filling Materials 60 cu.m. 500.00 30,000.00  
304,96
Sub-Total 7.00
II. Carpentry Works:          
  1.) Truss          
  24-2X6X10’ 250 bd.ft 30.00 7,500.00  
  30- 2x6x8’ 250 bd.ft 30.00 7,500.00  
  2- 2x6x14’ 30 bd.ft 30.00 900.00  
  28-2x4x8’ 150 bd.ft 30.00 4,500.00  
  3-2x4x12’ 25 bd.ft 30.00 750.00  
2.) Purlins and      
  Fascia Bonds    
  hardiflex 8 kls. 415.00 3,320.00  
  hardiflex nails 3 kls. 65.00 195.00  
  11- 2x3x8’ 50 bd.ft 30.00 1,500.00  
  20- 2x3x10’ 120 bd.ft 30.00 3,600.00  
3.) Door Jambs and      
  Frames    
  24- 2x6x8’ 200 bd.ft 30.00 6,000.00  
  5- 2x6x10’ 60 bd.ft 30.00 1,800.00  
  28- 2x4x8’ 180 bd.ft 30.00 5,400.00  
  ¼ plywood 40 sht. 330.00 13,200.00  
  Kwikset door knob 5 pcs. 900.00 4,500.00  
4.) Window Jambs      
  and Frame    
  15- 2X6X10’ 200 bd.ft 30.00 6,000.00  
  32- 2x6x8’ 260 bd.ft 30.00 7,800.00  
  48- 1x6x8’ 200 bd.ft 30.00 6,000.00  
  42- 1x6x10’ 250 bd.ft 30.00 7,500.00  
  52- 1x1x10’ 50 bd.ft 30.00 1,500.00  
  2 ½ fin. Nails 5 kls. 60.00 300.00  
5.) Partition Wall      
  and Ceiling    
  25- 2X2X12’ 120 bd.ft 30.00 3,600.00  
  50- 2x2x12’ 250 bd.ft 30.00 7,500.00  
  170- 2x2x10’ 600 bd.ft 30.00 18,000.00  
  10- 2x2x16’ 55 bd.ft 30.00 1,650.00  
  ¼ plywood 100 shts. 350.00 35,000.00  
  Asstd.size nails 60 kls. 70.00 4,200.00  
  4’ loose pin hinges 10 pcs. 130.00 1,300.00  
161,01
Sub-Total 5.00
III. Roofing Works:          
  26x10’ G.I corr 70 Ga. 540 37,800.00  
  26x8’ G.I corr 60 Ga. 435 26,100.00  
  26 plain G.I sht. 10 Ga. 450 4,500.00  
  2 ½ roof nails 15 kls 85 1,275.00  
  v6/ca seal 3 qrts 465 1,395.00  
71,07
Sub-Total 0.00
IV. PLUMING WORKS: L/S   65,500.00 65,500.00
IV. ELECTRICAL WORKS: L/S   30,000.00 30,000.00
IV. PAINTING WORKS: L/S   50,500.00 50,500.00
IV. FLOOR TILES WORKS:     100,000.00 100,000.00
   
TOTAL COST 783,052.00
200,00
LABOR 0.00
983,05
GRAND TOTAL 2.00

You might also like