Checklist For Reinforcement: Project: Client: Doc. No.: Project Location

This checklist documents the inspection of reinforcement at a construction site. It includes 14 items to check such as verifying bar sizes and spacing match plans, lap lengths are correctly positioned, shuttering and bars are clean, and chairs are provided. The quality assurance engineer signs off after inspection and may include remarks.

Uploaded by

deepak kumbhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views1 page

Checklist For Reinforcement: Project: Client: Doc. No.: Project Location

This checklist documents the inspection of reinforcement at a construction site. It includes 14 items to check such as verifying bar sizes and spacing match plans, lap lengths are correctly positioned, shuttering and bars are clean, and chairs are provided. The quality assurance engineer signs off after inspection and may include remarks.

Uploaded by

deepak kumbhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Checklist for Reinforcement

Project: Doc. No. :


Client: Project Location :

SITE LOCATION DATE

YES NO NA

1 Structural Drg. No. and date as per which reinforcement checked.


Bar Bending Schedule Prepared?

2 Connecting of bars to existing dowels to be checked for alignment. OK?

3 Placing of Bar diameter, number, spacing match with the Construction Schedule?

4 Lap Length, Position of lap, OK?

5 Cleanliness of shuttering and Bars OK?

6 Chairs provided?

7 Cover for reinforcement ok?

8 Provision of cover blocks/ preparation of cover blocks

9 Maintaining records and getting approval for additional reinforcement not shown

10 To check the construction joint for proper concrete bonding before placing
reinforcement
11 Laying of bars of required dia. As per requirement

12 Check for Test Reports for steel and approved brand or not

13 Check for proper binding (double strand/quality of binding wire of 18 SWG)

14 Check for any rework or alteration

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By: