AntMiner S9 Hydro Server Installation Guide
AntMiner S9 Hydro Server Installation Guide
S9 Hydro Server
Installation Guide
Document Version 0.1
Aug 2018
© Copyright Bitmaintech Pte.Ltd. 2007 – 2018. All rights reserved.
Bitmaintech Pte.Ltd. (Bitmain) reserves the right to make corrections, modifications, enhancements,
improvements, and other changes to its products and services at any time and to discontinue any product or
service without notice.
Customers should obtain the latest relevant information before placing orders and should verify that such
information is current and complete. All products are sold subject to Bitmain's terms and conditions of
sale supplied at the time of order acknowledgment.
Bitmain warrants performance of its products to the specifications applicable at the time of sale in accordance
with Bitmain's standard warranty. Testing and other quality control techniques are used to the extent Bitmain
deems necessary to support this warranty. Except where mandated by government requirements, testing of
all parameters of each product is not necessarily performed.
Bitmain assumes no liability for third‐party applications assistance. Customers are responsible for their
products and applications using Bitmain components. To minimize the risks associated with customer products
and applications, customers should provide adequate design and operating safeguards.
Bitmain does not warrant or represent that any license, either express or implied, is granted under any
Bitmain patent right, copyright or other Bitmain intellectual property right relating to any combination,
machine, or process in which Bitmain products or services are used. Information published by Bitmain
regarding third‐party products or services does not constitute a license from Bitmain to use such products or
services or a warranty or endorsement thereof. Use of such information may require a license from a third
party under the patents or other intellectual property of the third party, or a license from Bitmain under the
patents or other intellectual property of Bitmain.
‐1‐
S9 Hydro Server Installation Guide
Resale of Bitmain products or services with statements different from or beyond the parameters stated by
Bitmain for that product or service voids all express and any implied warranties for the associated Bitmain
product or service and is an unfair and deceptive business practice. Bitmain is not responsible or liable for any
such statements.
All company and brand products and service names are trademarks or registered trademarks of their
respective holders.
All text and figures included in this publication are the exclusive property of Bitmaintech Pte.Ltd. (Bitmain),
and may not be copied, reproduced, or used in any way without the express written permission of Bitmain.
Information in this document is subject to change without notice and does not represent a commitment on
the part of Bitmain. Although the information in this document has been carefully reviewed, Bitmain does not
warrant it to be free of errors or omissions. Bitmain reserves the right to make corrections, updates, revisions
or changes to the information in this document.
Bitmaintech Pte.Ltd.
Tel:+86‐400‐890‐8855
www.bitmain.com
‐2‐
S9 Hydro Server Installation Guide
Table of Contents
1.Overview 4
1.1 S9 Hydro Components 5
1.2 Specifications 6
2.Connecting the Power Supply 8
3.Connecting S9 Hydro HEX to Server 11
4.Pump Water‐infusion 13
5. Setting
. up the Server 15
6. Configuring the Server 17
7. 18
8. Administering Your Server 19
8.1 Checking Your Firmware Version 19
8.2 Upgrading Your System 19
8.3 Modifying Your Password 20
8.4 Restoring Initial Settings 20
‐3‐
S9 Hydro Server Installation Guide
1.Overview
1. Overview
The S9 Hydro server is Bitmain’s newest water‐cooling product. All S9 Hydro servers are tested and
configured prior to shipping to ensure easy set up. This new‐style DIY product needs to be assembled,
additional radiations and accessories and power supply are necessary. Warranty is not available due to the
damage caused by customer’s self‐removal of the S9 Hydro server.
‐4‐
S9 Hydro Server Installation Guide
1.Overview
The S9 Hydro server main components and controller front panel are shown in the following figure:
‐5‐
S9 Hydro Server Installation Guide
1.Overview
1.2 Specifications
‐6‐
S9 Hydro Server Installation Guide
1.Overview
(1‐1) Server test in 25°C temperature chamber. Heat exchanger and water pump power are included.
(1‐2) Server test in 40°C temperature chamber. Heat exchanger and water pump power are included.
(1‐3) Typ condition: 25°C, min J/TH, typical Hashrate
Max condition: 40°C, max J/TH, max Hashrate
(2‐1) Caution: Supply lower than 200V will cause APW5 protection or damage
Due to APW output power will be reduced by 50% under 200V input, and it is not enough for
server
(2‐2) 220V AC Power Supply Frequency
(2‐3) Typ condition: Min Power on wall, 220V AC supply
Max condition: Max Power on wall, 180V AC supply
(3‐1) During 220V AC input
(4‐1) Without APW5 & Heat exchanger and water pump, including the bend pipes . APW5 L*W*H(mm)
= 260*125*86
(4‐2) Without APW5 & Heat exchanger, pump, including the bend pipes, APW5 net weight is 2.5kg
(4‐3) Typ condition: 25°C, typical J/TH, typical Hashrate
Max condition: 40°C, max J/TH, max Hashrate
(5‐1) Temperature should be no less than 15°C, and at least 3°C higher than dew point
(5‐2) The external water source can appropriately reduce the flow according to the actual water
temperature. Under this condition, the recommendation is no less than 2L/min.
‐7‐
S9 Hydro Server Installation Guide
●12V fixed voltage output adopts PCIE output terminal. The output cable consists of two colors:
the 12V positive terminal is yellow; the
negative terminal is black
6PIN PCIE Positive and Negative Output
Terminals:
Positive:Yellow 1, Yellow 2, Yellow 3
Negative:Black 4, Black 5, Black 6
DC Voltage 12V
‐8‐
S9 Hydro Server Installation Guide
‐9‐
S9 Hydro Server Installation Guide
Thirteen PCI‐e connectors are located at the top of the S9 Hydro server for connecting the PSU as follows:
● Twelve PCI‐e connectors for the hash boards. Each hash board has three PCI‐e connectors.
● One PCI‐e connector located on the controller.
Each hashboard must be powered by the same PSU to prevent possible damage and instability.
1. Connect PSU power cable connectors to each of the twelve PCI‐e connectors on the top of the S9 Hydro
server, ensuring that each hash board is powered by the same PSU.
A、SN Label B、Controller Ribbon cable Connector C、Controller PCI‐e Power Connector
D、Ribbon cable E、Fan Connector F、Pump Connector
G、Hash Boards Ribbon cable Connector H、Hash Boards PCI‐e power Connector I、Pipe Connector
2. Connect a PSU power cable connector to the S9 Hydro PCI‐e connector on the controller.
3. Connect the network cable to the ETH port.
4. To power up your S9 Hydro server, connect the PSUs to the power wall outlet.
If you are using more than one PSU,power up the PSU connected to the controller AFTER you have
Powered up the other PSU(s).
‐ 10 ‐
S9 Hydro Server Installation Guide
A、Fan connection
Four 4‐pin connectors of the control board and two connectors separated by one line will be connected
with 6 fans. The plug must be inserted in place, the fan line order does not matter as long as it is
connected.
B、Pump connection
The control board has a black 4‐pin connector to which the pump must be connected.
C、Connection of pipelines
The S9 Hydro pump should be connected in series with the pipe, and the joint should be clamped with a
buckle. The figure below shows the recommended connection.
‐ 11 ‐
S9 Hydro Server Installation Guide
Attention: The position of pipes may be slightly adjusted and it won’t have any effect on usage.
For better heat dissipation effect, it is recommended to connect pipes in this way.
Quantity of fans ≥6
Quantity of pumps 1
Water flow, L/min 5~15
Hydrostatic pressure, KPa 50~300
Power of pumps, W ≤40
Fan connection mode 4‐Pin ,DIP,pitch2.54mm.
pin1:GND,pin2:12V,pin3:FAN_SPEED,pin4:FAN_PWM
‐ 12 ‐
S9 Hydro Server Installation Guide
4.Pump Water‐infusion
4.Pump Water‐infusion
A.Water quality
Water Quality Requirements
In order to support the long‐term optimum operations of the water cooling system, we recommend that
the water quality used should meet the requirements as stated in the table above.
Water‐cooling plates inside the server are welded parts made of aluminum, which have been cleaned
before roll‐out. Water in some servers may appear to be turbid after running for a period of time. Kindly
note that this will not affect on the overall cooling system and long‐term operation of the system.
B. Keep adding water. Since water is needed in both the server and the radiators, water in the pump will
be reduced when the server is mining. Always remember to add water when starting the server to ensure
that the water level is sufficient for optimal heat dissipation.
‐ 13 ‐
S9 Hydro Server Installation Guide
4.Pump Water‐infusion
C.S9 Hydro server and radiators can be tilted left and right during water infusion which helps to ventilate
the air.
After water circulation is running normally, S9 Hydro server and radiators can be slowly tilted left and
right to help the residual air bubbles inside those two equipment to be discharged smoothly. This action
can help to increase the cooling efficiency of the system.
D.Liquid Level: the standard level is as stated in the picture below. Please replenish the liquid promptly if
the liquid level falls below the minimum value marking.
Maximum Value
Minimum Value
‐ 14 ‐
S9 Hydro Server Installation Guide
‐ 15 ‐
S9 Hydro Server Installation Guide
7. On the controller board, click the IP Report button. Hold it down until it beeps (about 5 seconds).
‐ 16 ‐
S9 Hydro Server Installation Guide
Option Description
The S9 Hydro server can be set up with three mining pools, with decreasing
priority from the first pool (pool 1) to the third pool (pool 3).
The pools with low priority will only be used if all higher priority pools are
offline.
‐ 17 ‐
S9 Hydro Server Installation Guide
Temp(PCB) Temperature of each hash board (°C).(Applied only to server with fixed frequency)
● O ‐ indicates OK
● X ‐ indicates error
● ‐ ‐ indicates dead
‐ 18 ‐
S9 Hydro Server Installation Guide
Make sure that the S9 Hydro server remains powered during the upgrade process. If power fails
before the upgrade is completed, you will need to return it to Bitmain for repair.
‐ 19 ‐
S9 Hydro Server Installation Guide
Resetting your server will reboot it and restore its default settings. The red LED will automatically
flash once every 15 seconds if the reset is operated successfully.
‐ 20 ‐
S9 Hydro Server Installation Guide
Regulation:
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1)
This device may not cause harmful interference, and (2) this device must accept any interference received,
including interference that may cause undesired operation.
Note:
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to
part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment. This equipment generates, uses,
and can radiate radio frequency energy and, if not installed and used in accordance with the instruction
manual, may cause harmful interference to radio communications. Operation of this equipment in a residential
area is likely to cause harmful interference in which case the user will be required to correct the interference at
his own expense.
EU WEEE: Disposal of Waste Equipment by Users in Private Household in the European Union
This symbol on the product or on its packaging indicates that this product must not be
disposed of with your other household waste. Instead, it is your responsibility to dispose of
your waste equipment by handling it over to a designated collection point for the recycling of
waste electrical and electronic equipment. The separate collection and recycling of your waste
equipment at the time of disposal will help to conserve natural resources and ensure that it is
recycled in a manner that protects human health and the environment. For more information
about where you can drop off your waste equipment for recycling, please contact your local city office, your
household waste disposal service or the shop where your purchased the product.
台湾 ROHS:
設備名稱: ,型號:
有害物质
多溴二苯
單元 鉛 汞 鎘 六價鉻 多溴聯苯
醚
(Pb) (Hg) (Cd) (Cr+6) (PBB)
(PBDE)
外殼 ○ ○ ○ ○ ○ ○
電路板組
— ○ ○ ○ ○ ○
件
其他線材 — ○ ○ ○ ○ ○
‐ 21 ‐