IBS SCORE CALCULATION (Kuarters Keluarga)

Maklumat Projek

1.0 Cawangan / Negeri : Cawangan Kejuruteraan Awam, Struktur & Jambatan


2.0 Nama projek : Cadangan merekabentuk, membina dan menyiapkan
perumahan Kakitangan dan Lain-Lain di Penjara Simpang
Renggam, Johor Darul Takzim.
3.0 No. Kontrak : JKR/IP/CKUB/126/2008

a) Construction Area per floor


1.0 Area for 1 unit of Kuarters = 130.60 m2
2.0 Corridor Area = 97.00 m2
3.0 Area for 1 floor = (130.6 x 4units + 97) = 619.40 m2

Total = 619.40

Total construction area = ( 619.40) m2

Part 1 : Structure Element

b) Structural Systems
1.0 Beams and Columns : In-situ Beams and Columns with reusable formwork
3.0 Floor Slab : Precast half slabs floor
4.0 Roof Truss : Prefab metal roof truss

Part 2 : Wall System

c) Wall Systems
1.0 External wall : Precast Blockworks (CSR-ALC BLOK) light weight
2.0 Internal wall : Dry wall system

Part 3 : Other Simplified construction Solutions

d) Other simplified construction solutions


1.0 Utilisation of Standardised Components : 100% beams sizes follow MS 1064 part 10:2001
: 100% columns sizes follow MS 1064 part 10:2001
2.0 Repetition of Structural Layout : Repetition of floor to floor height
: Vertical repetition of structure
3.0 Staircase : Prefab staircase

Notes:
* For Roof Floor and Upper Roof Floor
The calculation can be tabulated as follows

ELEMENTS Area (m2) or IBS Coverage


Length (m) Factor
Part 1: Structure Elements

In-situ beams + in-situ column with timber formwork +


(no floor) grd floor area = 2183.24m2 2183.24 m2 0.0 0.334
In-situ beams + in-situ column with timber formwork +
precast half slab
(1st floor - 2nd Floor) = 1145.411m2 x 2 storey = 2290.822m2 2290.82 m2 0.6 0.350
In-situ beams + in-situ column with timber formwork +
precast half slab
(3rd floor - 4th Floor) = 689.625m2 x 2 storey = 1379.25m2 1379.25 m2 0.6 0.211
Roof truss using prefab roof truss
Roof area = 689.625 m2 689.63 m2 1.00 0.105
Total Part 1 ( 6,542.94) m2

Part 2: Wall System

External wall
- Precision blockworks (6) 480.00 m 0.5 0.44

Internal wall
- Dry wall system 621.60 m 1.0 0.56

Total Part 2 1101.60 m -

Part 3: Other simplified construction solutions UNIT IBS SCORE


PERCENTAGE OF USAGE
50% ≤ x < 75%
Utilisation of Standardised Component
- 100% beams sizes follow
MS 1064 part 10 : 2001 Nos
- 100% column sizes follow
MS 1064 part 10 : 2001 Nos

Repetition of Structural Layout


a) For building of floor more than 2 storeys
- Repetition of floor to floor height storey
- Vertical repetition of structural floor layout m2 -

Other Prefab Components & Labour Saving Solutions


- Prefab Staircase Nos

Total Part 3

Total IBS Score

For this contract, minimum CIDB score for IBS is >50%


Therefore, total IBS score is 58.52% enough for CIDB requirement.
IBS SCORE

0.00

10.50

6.32

5.27
22.10

6.54

16.93

23.46

IBS SCORE
PERCENTAGE OF USAGE
75% ≤ x ≤ 100%

2.0

2.0

2.0

1.0

7.00

52.56
SUMMARY SHEET ( Multiple Building Project)

BLOCK NAME Area (m2) COVERAGE IBS SCORE OF


AREA (%) BUILDING
1) Kuarters Keluarga

- Block A ( 6,542.94) 0.23 52.56


- Block B ( 6,542.94) 0.23 52.56
- Block C ( 6,542.94) 0.23 52.56
- Block D ( 6,542.94) 0.23 52.56

1) Kuarters Bujang

- Block A ( 1,334.40) 0.05 58.76


- Block B ( 1,334.40) 0.05 58.76

TOTAL ( 28,840.55) 1.0


IBS SCORE OF
PROJECT

11.92
11.92
11.92
11.92

2.72
2.72

53.14