A.1.1 (8) Provision of Field Office for the Engineer mo 2 5,905.41 ₱ 11,810.82 0.30% 2 5,905.41 ₱ 11,810.82 0.30%
B.5 Project Billboard / Signboard (COA) ea. 1 9,284.94 ₱ 9,284.94 0.23% 1 9,284.94 ₱ 9,284.94 0.23%
B.7(2) Occupational Safety and Health Program l.s. 1 13,028.04 ₱ 13,028.04 0.33% 1 13,028.04 ₱ 13,028.04 0.33%
B.8(2) Traffic Management l.s. 1 14,091.00 ₱ 14,091.00 0.35% 1 14,091.00 ₱ 14,091.00 0.35%
PART C: EARTHWORKS
100(3)a2 Individual Removal of Trees (small, 301-500 mm.Ø) ea. 7 2,672.29 ₱ 18,706.03 0.47% 7 2,672.29 ₱ 18,706.03 0.47%
103(10)a Structure Excavation (Common Soil) cu.m. 315.60 275.72 ₱ 87,017.23 2.18% 315.60 275.72 ₱ 87,017.23 2.18%
105(1)a Subgrade Preparation (Common Material) sq.m. 4260.00 18.99 ₱ 80,897.40 2.02% 4260.00 18.99 ₱ 80,897.40 2.02%
200(1) Aggregate Subbase Course cu.m. 220.10 469.63 ₱ 103,365.56 2.59% 220.10 469.63 ₱ 103,365.56 2.59%
201(1) Aggregate Base Course cu.m. 1107.60 542.07 ₱ 600,396.73 15.02% 1107.60 542.07 ₱ 600,396.73 15.02%
505(2)a Grouted Riprap (Class A) cu.m. 33.60 2,983.79 ₱ 100,255.34 2.51% 166.95 2,983.79 ₱ 498,133.52 12.46%
WORK ACCOMPLISHED
Ref. No. 1
WORK ACCOMPLISHED
0 0 0 0
Approved by:
ARIEL A. DE JESUS
Municipal Mayor
PROVINCE OF AURORA
MUNICIPALITY OF SAN LUIS
CONTRACT SCHEDULE
ITEM NO. UNIT PREVIOUS
QUANTITUNIT COST AMOUNT WT % QUANTITYAMOUNT WT %
PART I: FACILITIES FOR THE ENGINEERS
Provision of Field Office for the Engineer
A.1.1 (8) mo. 2 6842.71 13685.42 2.74%
(Rental Basis)
PART II: OTHER GENERAL REQUIREMENTS
B.5.2 Project Billboard / Signboard (COA) ea. 1 10952.8 ₱ 10,952.80 2.20%
PART III: CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A: EARTHWORKS
803(1)a Structure Excavation,Manual (Common Soil) cu.m. 0.86 577.67 ₱ 496.80 0.10%
804(1)a Embankment from Structure Excavation cu.m. 0.43 263.18 ₱ 113.17 0.02%
804(4) Gravel Fill cu.m. 0.54 488 ₱ 263.52 0.05%
PART B: PLAIN AND REINFORCED CONCRETE WORKS
Structural Concrete, Footing and Slab on Fill,
900(1)c2 cu.m. 0.49 6432.48 ₱ 3,151.92 0.63%
Class A 28 days
900(1)c4 Structural Concrete Columns, Class A 28 days cu.m. 0.17 6432.48 ₱ 1,093.52 0.22%
902(1)a1 Reinforcing Steel (Deformed), Grade 60 kgs 82.98 78.72 ₱ 6,532.19 1.31%
903(2) Formworks and Falseworks sq.m. 2.7 1474.22 ₱ 3,980.39 0.80%
PART C: FINISHING WORKS
C.1 Masonry Works
1046(2)a1 100mm CHB Non Load Bearing (inc. Reinf. Steel) sq.m. 9.7 873.37 ₱ 8,471.69 1.70%
C.2 Fabricated Materials
1004(2)a Lockset set 1 735.29 ₱ 735.29 0.15%
1004(2)g Hinges set 4 291.43 ₱ 1,165.72 0.23%
1005(5) Grille Window sq.m. 20.16 1271.08 ₱ 25,624.97 5.14%
1008(2) Aluminum Glass Window sq.ft. 2.59 739.78 ₱ 1,916.03 0.38%
1010(1) Frames (Jambs, Sills, Head, Transoms & Mullions) set 1 2098.28 ₱ 2,098.28 0.42%
1010(2)a Hollow Core Flush Door sq.m. 1.26 2474.89 ₱ 3,118.36 0.63%
C.3 Finishing Works
1027(1) Cement Plaster Finish sq.m. 19.4 269.01 ₱ 5,218.79 1.05%
1018(2) Unglazed Tiles sq.m. 65.82 887.73 ₱ 58,430.39 11.71%
C.4 Carpentry Works
1003(1)c2 Ceiling, 6mm Marine Plywood, Wood Frame sq.m. 64.79 954.99 ₱ 61,873.80 12.40%
1003(17) Carpentry and Joinery Works l.s. 1 12253.41 ₱ 12,253.41 2.46%
C.5 Painting Works
1032(1)a Painting Works (Masonry/Concrete) sq.m. 236.28 497.67 ₱ 117,589.47 23.57%
1032(1)b Painting Works (Wood) sq.m. 64.79 484.22 ₱ 31,372.61 6.29%
C.6 Roof Framing and Roofing Works
Prepainted Metal Sheets (Corrugated Type,
1014(1)b1 sq.m. 5.2 975.48 ₱ 5,072.50 1.02%
Long Span, 0.50 mm thk)
1014(2) Perforated Aluminum Ceiling Panels (eaves) sq.m. 45.4 1379 ₱ 62,606.60 12.55%
PART D: PLUMBING/SANITARY WORKS
1001(8) Sewer Line Works l.s. 1 13753.46 ₱ 13,753.46 2.76%
1002(8) Sanitary/Plumbing Fixtures l.s. 1 18461.13 ₱ 18,461.13 3.70%
1002(28) Cold Water Lines l.s. 1 6355.68 ₱ 6,355.68 1.27%
PART E: ELECTRICAL
1100(30) Conduit, Boxes and Fittings l.s. 1 2993.06 ₱ 2,993.06 0.60%
1101(42) Wires & Wiring Devices l.s. 1 2993.06 ₱ 2,993.06 0.60%
1103(1) Lighting Fixtures l.s. 1 16443.56 ₱ 16,443.56 3.30%
₱ 498,817.59 100.00%
OF WORK ACCOMPLISHED
Ref. No. 1
Payment Cert. No. 1
Period Covered September 8,2021 to October 20, 2021
WORK ACCOMPLISHED
THIS PERIOD TO DATE
QUANTITY AMOUNT WT % QUANTITY AMOUNT WT %
Approved by:
ARIEL A. DE JESUS
Municipal Mayor