0% found this document useful (0 votes)
21 views1 page

For The Given Network Diagram

The document provides instructions for an operations research assignment involving network diagrams. It asks the student to construct a table showing activity relationships, identify earliest and latest start and finish times for each activity, total float, the critical path, and project completion time.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

For The Given Network Diagram

The document provides instructions for an operations research assignment involving network diagrams. It asks the student to construct a table showing activity relationships, identify earliest and latest start and finish times for each activity, total float, the critical path, and project completion time.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

SE-315 Operations Research

Assignment # 01(CLO-2, PLO-3, C3)

Q# 1:

For the given network diagram

a. Construct a table which shows the relationship between the activities and their
predecessors.
b. Identify the following time estimates for each activity.
 Earliest Start Time(EST)
 Earliest Finish Time (EFT)
 Latest Start Time (LST)
 Latest Finish Time (LFT)
c. Identify the total float for each activity.
d. Identify the critical path.
e. Identify the project completion time.

Note: The duration of each given activity is in days.

Page 1 of 1