Tasmoris 40m (San Miguel O'donnel Ris)
Tasmoris 40m (San Miguel O'donnel Ris)
Tasmoris 40m (San Miguel O'donnel Ris)
A. Direct Cost
1. Civil Works
1. Contract Works
Temporary Facilities / Mobilization / Demobilization l.s. 1.00 #REF! #REF! #REF! #REF! #REF! #REF!
Diversion Works
1. Diversion & Care of Water (Intake # 1) l.s. 1.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. Diversion & Care of Water (Intake # 2) l.s. 1.00 154,935.40 154,935.40 18,592.20 12,394.80 9,296.10 40,283.10 195,218.50 195,218.50
3. Structure Excavation (common) cu.m. 13,026.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4. Structure Excavation (with dewatering) cu.m. 2,156.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5. Structure Backfill with Compaction cu.m. 12,770.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6. 3,000 PSI HRC with Formworks cu.m. 738.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7. 3,000 PSI HRC with Formlumber cu.m. 282.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8. Pump House l.s. 2.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9. Diesel Engine 125hp, Speed 1800rpm, 6 cylinder, 4 stroke cycle, turbo units 2.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
chraged, mechanical governor, water-cooled
Mixed flow pump,
Right angle diameter
gear drive 16 in.,
(RAGD) cap.
horse 7500rating
power gpm = 80, Ratio = 1:1,
Speed 1760 rpm
Pump accessories column pipes 16 in dia. Spider bushing, stainless
shafting and discharge head
10. Procurement and Delivery of 8Hp Diesel Engine, Water Cooled, Belt units 17.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Driven, 4" x 4" dia. Self Priming Pump w/ accessories
SUBTOTAL #REF!
Canalization Works
1. Canal Excavation cu.m. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. Side Borrow with Compaction cu.m. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3. 3,000 PSI Reinforced Concrete with Formworks cu.m. 286.30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4. 3,000 PSI Reinforced Concrete with Formlumber cu.m. 187.80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5. Borrow Haul with Compaction cu.m. 801.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SUBTOTAL #REF!
Canal Structures
1. Structure Excavation cu.m. 409.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. Structure Excavation (Dewatering) cu.m. 24.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. Structure Backfill with Compaction (Manual) cu.m. 396.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3. 3,000 PSI Reinforced Concrete with Formworks cu.m. 146.30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4. 3,000 PSI Reinforced Concrete with Formlumber cu.m. 25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5. 6" Rubber Water Stop l.m. 66.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SUBTOTAL #REF!
2. Force Account
Steelgate
1. Steelgate with CP-12 Lifting Mechanism ( 1.2m. x 1.2m. x 4.0m) units 2.00 #REF! #REF! #REF! #REF!
Steelgate (w/
Kind of CP-12 Lifting
Location Station Remarks
Structure Mechanism)
1.2 x 1.2
From To (units)
Total 2.00
Say 2.00
Sheet 2 of 3
Canalization (Contract Works)
Kind of Structure Excavation Structure 6" Rubber 3,000 PSI HRC 3,000 PSI HRC
Name of canal Station Remarks
Structures Backfill Water Stop w/ Formworks w/ Formlumber
Common Dewatering
From To (cu.m.) (cu.m.) (cu.m.) (cu.m.) (l.m.) (cu.m.) (cu.m.)
Main Canal #1 0+437.20 0+439.20 Sump 48.30 12.07 19.68 6.86 2.25
Main Canal #1 0+453 0+455 Stilling Pool 20.00 15.37 1.69 0.66
Main Canal #1 0+455 0+520 Elev. Flume 138.60 129.49 36.00 65.42 7.13
Main Canal #1 0+680 0+690 Road Crossing 10.00 32.65 5.24 2.25
Main Canal #1 1+080 1+090 Road Crossing 11.00 35.85 4.92 1.95
Main Canal #2 0+657.20 0+659.20 Sump 48.30 12.07 19.68 6.86 2.25
Main Canal #2 0+670 0+672 Stilling Pool 12.86 5.52 1.69 0.66
Main Canal #2 0+672 0+720 Elev. Flume 113.40 105.95 30.00 48.69 5.83
Main Canal #2 1+220 1+230 Road Crossing 7.00 31.85 4.92 1.95
35
1
1
416,007.90
34,800.00
29,000.00
48,027.95
527,835.85
ATTACHMENT "C" 2 of 6
June '21 2nd QUARTER TOTAL
LP Peso Loan
F.O. C.O. F.O. C.O. F.O. C.O.
2,259,356.11
-
69,600.00
58,000.00
96,055.90
2,483,012.01
ATTACHMENT "C" 3 of 6
December '21 4th QUARTER TOTAL
LP Peso Loan
F.O. C.O. F.O. C.O. F.O. C.O.
35
1
2
1
11,974,035.08
-
104,400.00
87,000.00
144,083.85
12,309,518.94
ATTACHMENT "C" 4 of 6
March '22 1st QUARTER TOTAL
LP Peso Loan
F.O. C.O. F.O. C.O. F.O. C.O.
35
1
2
1
1
1
1
1
1
13,276,299.15
-
104,400.00
87,000.00
144,083.85
13,611,783.00
ATTACHMENT "C" 5 of 6
June '22 2nd QUARTER TOTAL
LP Peso Loan
F.O. C.O. F.O. C.O. F.O. C.O.
956,022.25
-
34,800.00
29,000.00
48,027.95
1,067,850.20
ATTACHMENT "C" 6 of 6
CY 2022 OVERALL PROJECT COST
LP Peso Loan
F.O. C.O. F.O. C.O. F.O. C.O.
35
1
2
1
1
1
1
1
28,881,720.49
-
348,000.00
290,000.00
480,279.51
30,000,000.00
NAME OF PROJECT: DUNGAN CIS 2021
GANTT CHART
Package No.:
Total Duration (cd) 420
2021
Item Percent March April May June July August September
Items of Work Estimated Cost No. of Days
No. Weight
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st
qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr
CANALIZATION
1. Common Excavation 336,448.20 1.20 ### ### ### ###
2. Class "A" Concrete (Cut & Cover) 925,382.75 3.30 ### ### ###
3. Class "A" Concrete (Lining) 20,479,212.00 73.03
4. Structure Backfill 282,348.00 1.01
5. Borrow Haul with Comp. 992,336.80 3.54
ROAD IMPROVEMENT
1. Clearing & Grubbing 204,876.00 0.73
2. Sub Base Course 752,374.00 2.68
3. Base Course 1,068,866.40 3.81
4. Concrete Pavement 1,353,135.84 4.83
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
ATTACHMENT "H"
1 2022
September October November December January February March April
2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr qtr
###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ###
- - - - - - - - - - - - - - - - - - - - -
0.00 13.56 13.70 14.20 14.71 15.80 15.46 3.31
ERICO Y. QUIZON
Sr. WRFT
CMD FORM Y-1a
ERICO Y. QUIZON
Sr. WRFT
ATTACHMENT "E"
2022 PERCENT
(%)
NOV DEC JAN FEB MAR APR
(16) (17) (18) (19) (20) (21) (20)
30.00 100.00
90.00
80.00
70.00
16.69 17.31 17.92 17.71 9.56 60.00
50.00
10.45 63.20 26.35 40.00
30.00
20.00
10.00
10.00 10.00 10.00 10.00 10.00 10.00 0.00
10. CONTINGENCIES
JOSEPHINE B. SALAZAR
TOTAL DIRECT COST 2,489,329.05 2,489,329.05 Regional Irrigation Manager
A. DIRECT COST
I. CIVIL WORKS
A. Contract Works 846,850.60 846,850.60
B. Force Account Works -
7. PROCUREMENT OF EQUIPMENT
& VEHICLES (for FAPs)
8. CONSULTING SERVICES
10. CONTINGENCIES
ATTACHMENT "F"
DIVERSION WORKS
Intake lot
Barrel m.
IRRIGATION FACILITIES
a. Main Canal
Earth Canal km. 3.760
Concrete Canal km. 0.500
Structures units
b. Lateral Canals
Earth Canal km.
Concrete Canal km.
Structures units
DRAINAGE CANALS
ON-FARM FACILITES
a. Main Farm Ditch m.
b. Supplementary Farm Ditch km.
c. Ditch Structures units
d. Turnout units
e. Farm Drains km.
PROJECT FACILITIES
NO. OF IA ORGANIZED
FARMER BENEFICIARIES
IMPROVEMENT OF CANAL SYSTEM
EARTHWORKS COMPUTATION
From Sta.0+000 - 1+920
CATAGUING/RIAL CREEK
DREDGING WITH WASTE DISPOSAL
Sheet 1 of 5
EXCAVATION DISPOSAL OF WASTE LEFT DIKE RIGHT DIKE Borrow
STATION Side Borrow REMARKS
Cut Area Volume Fill Area Volume Fill Area Volume Fill Area Volume Haul
0+000 6.60
0+020 12.50 191.00 - - -
0+040 13.40 259.00 - - -
0+060 14.50 279.00 - - -
0+080 14.60 291.00 - - -
0+100 13.80 284.00 - - -
0+120 15.40 292.00 - - -
0+140 16.70 321.00 - - -
0+160 15.00 317.00 - - -
0+180 15.80 308.00 - - -
0+200 16.70 325.00 - - -
0+220 16.70 334.00 - - -
0+240 15.40 321.00 - - -
0+260 16.50 319.00 - - -
0+280 17.40 339.00 - - -
0+300 17.60 350.00 - - -
0+320 18.80 364.00
0+340 18.20 370.00
0+360 17.60 358.00
0+380 18.90 365.00
0+400 16.50 354.00
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
IMPROVEMENT OF CANAL SYSTEM
EARTHWORKS COMPUTATION
From Sta.1+020 - 4+000
PALUDPUD/BALANOY CREEK (UPSTREAM)
DREDGING WITH WASTE DISPOSAL
Sheet 1 of 7
EXCAVATION DISPOSAL OF WASTE LEFT DIKE RIGHT DIKE Borrow
STATION Side Borrow REMARKS
Cut Area Volume Fill Area Volume Fill Area Volume Fill Area Volume Haul
1+020 12.60
1+040 15.50 281.00 - - -
1+060 17.20 327.00 - - -
1+080 13.50 307.00 - - -
1+100 13.80 273.00 - - -
1+120 13.00 268.00 - - -
1+140 13.20 262.00 - - -
1+160 12.10 253.00 - - -
1+180 12.00 241.00 - - -
1+200 11.40 234.00 - - -
1+220 11.20 226.00 - - -
1+240 9.30 205.00 - - -
1+260 9.00 183.00 - - -
1+280 13.30 223.00 - - -
1+300 12.80 261.00 - - -
1+320 9.60 224.00 - - -
1+340 10.00 196.00
1+360 13.20 232.00
1+380 12.40 256.00
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
Prepared by:
ERICO Y. QUIZON
Sr. WRFT
UNIT COST DERIVATION
FOR
PARCELLARY SURVEY
DATA:
A. Type of vehicle to be used Rental Rate Fuel Consumption Oil Consumption
Pick-up P 21.00 /km 8 km/lit 700 km/lit
2. Equipment Utilization . . . . . . . . . .
Equipment used: Pick-up
Distance from IMO to project site (Round trip), D = 1800 kms
2. Equipment Utilization . . . . . . . . . .
Equipment used: Pick-up
Distance from IMO to project site (Round trip), D = 3200 kms
3. Parcellary Mapping (Survey Grade) - area location/land area holdings of owners and total area for ROW of canals
No. of Days Total Total Total
Personnel Involved Wages TOTAL
Work TEV Wages Allow.
1 - Engineer A 60.0 1261.59 - 75,695.45 - 75,695.45
1 - Eng'g. Asst. B 60.0 761.73 45,703.64 45,703.64
TOTAL - 75,695.45 121,399.09
D. Office Supplies
= 5% (Data Gathering + Survey of Lot Properties + Mapping)
= 42,507.24
say 41,647.54 SUMMARY:
a) Data Gathering =P 140,761.25
b) Survey of Lot Properties = 357,832.39
c) Mapping/Plotting/Data Compilation = 364,197.27
d) Office Supplies = 41,647.54
Total for Parcellary Survey - - - - - - - - - - - - - - - - - - - - - - =P 904,438.45
UNIT COST DERIVATION
FOR
CONSTRUCTION & IDP
DATA:
A. Type of vehicle to be used Rental Rate Fuel Consumption Oil Consumption
Pick-up P 21.00 /km 8 km/lit 700 km/lit
Motorcycle 0.55 /km 18 km/lit 2000 km/lit
I. CONSTRUCTION SURVEY:
A. Profile & Cross Section Survey
1. Labor:
No. of Days Total Total Total
Personnel Involved Wages TOTAL
Work TEV Wages Allow.
1 - Senior Engineer A 7.0 1526.55 - 10,685.82 - 10,685.82
1 - Instrumentman 7.0 636.68 - 4,456.77 - 4,456.77
2 - Survey Aide 7.0 674.86 - 9,448.09 - 9,448.09
5 - Laborers 7.0 566.64 - 19,832.27 - 19,832.27
1 - Driver Mech. B 7.0 715.36 - 5,007.55 - 5,007.55
TOTAL - 49,430.50 49,430.50
say 49,430.50
Output = 1.5 kms/day
No. of days to complete the activity alone, d = 3500.00 = 2333.33 day
1.5 kms/day
Travel time (Moving in & out) = 40 kms x 1 day = 0.17 day
30 kph 8 hrs
Total No. of days worked = 2333.50 day
Say - - - - - - - - - - - - - = 2334.00 day
Total No. of frequency/work: 2 time for Pre-Const.,3 times for Check & 2 time for Final Survey
= 7 times
2. Equipment Utilization . . . . . . . . . .
Equipment used: Pick-up
Distance from IMO to project site (Round trip), D = 1960 kms
1-2
3. Office Supplies . . . . . . . . . . . . . . .
Materials = 5% (Profile & Cross-section + Computation & Plotting +
Equipment Utilization)
= 24,427.09
say 24,428.25
SUMMARY:
a) Profile & Cross-section (7 times) =P 346,013.50
b) Computation and Plotting (7 times) = 61,195.75
c) Equipment Utilization = 56,402.50
d) Office Supplies = 24,428.25
Total for Construction Survey - - - - - - - - - - - - - - - - - - - - - - = P 488,040.00
Say - - - - -= P 488,040.00
P 126,225.00
BUDGETARY ESTIMATE:
A. Meals and Snacks
1. Participants:
40 persons x P250.00/day x 3 days = P 30,000.00
2. TARZAM IMO Staff:
25 persons x P250.00/day x 3 days = P 18,750.00
B. Supplies and Materials = P 18,000.00
C. Fuel and Oil = P 23,000.00
D. Conference Hall = P 25,000.00
Sub-Total = P 114,750.00
10% Contingency 11,475.00
TOTAL = P 126,225.00
3. Office Supplies
Material Cost = 5% (Labor + Training + Equipment Utilization))
= 11,910.74
say 11,772.75
SUMMARY:
a) Labor =P 93,837.25
b) Trainings = 126,225.00
c) Equipment Utilization = 18,165.00
d) Office Supplies = 11,772.75
Total for Irrigation Development- - - - - - - - - - - - - - - - - - - =P 250,000.00
Say - - - - -= P 250,000.00
2-2
MASTERLIST OF ACTIVITIES
IMPROVEMENT OF CANAL SYSTEM
TASMORIS 2022 (San Miguel O'Donnel RIS )
1. Diversion 3. Disposal of 5. Class 'A' 6. Class 'A' 7. Structure 8. Structure 1. Diversion 3. Disposal of
2. Common 4. Structure 2. Common
Name of Canal Station Length and Care of Waste / Concrete Concrete Backfill (Side Backfill 9. Filter Drain and Care of Waste / Remarks
Excavation Excavation Excavation
Water Overhaul (Revetment) (Canal Lining) Borrow) (Borrow Haul) Water Overhaul
From To (m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.)
IMPROVEMENT OF CANAL SYSTEM
Sta. Rita Creek 0+000 0+405 405 3,523.50 904.77 2,964.60 243.00
Common Excavation with Over Haul
Common Excavation with Over Haul
Common Excavation with Over Haul
Common Excavation with Over Haul
Structure Backfill
Revetment
sta. 0+000 to sta. 0+405 =
length = 405.00 m.
vol. 1 (cow) = ( 0.40 + 1.60 )/2* (1.50) x 405.00 2.00
= 1,215.00 cu.m. x 20% shrinkage
= 1,458.00 cu.m.
vol. 1 ( shear & berm cow) = ( 0.37 + 1.07 )/2* (1.20) x 405.00 4.00
= 1,749.60 cu.m. x 20% shrinkage
= 2,099.52 cu.m.
total = 2,964.60 cu.m.
Filter Drain
sta. 0+000 to sta. 0+405 UPSTREAM = 405.00
length = 405.00
ROAD IMPROVEMENT
1. Diversion and Care of Water lot 1.00 160,925.60 160,925.60 19,311.10 12,874.00 9,655.60 6,083.00 47,923.70 208,849.30 208,849.30
2. Common Excavation cu.m. 1.00 151.00 3,309,165.00 18.10 12.10 9.10 5.70 45.00 196.00 196.00
3. Disposal of Waste / Overhaul cu.m. 1.00 169.50 3,714,592.50 20.30 13.60 10.20 6.40 50.50 220.00 220.00
sub total 209,265.30
Mark-up:
OCM 12 %
Profit 8%
1. Temporary Facilities/Mobilization/Demobilization
A. Materials :
1/2" Thk. Plywood 40.00 pcs. @ P 800.00 /pc. = 32,000.00
Lumber:
2" x 4" x 10' 40.00 bd.ft. @ 60.00 /bd.ft. = 2,400.00
2" x 4" x 8' 43.00 bd.ft. @ 60.00 /bd.ft. = 2,580.00
2" x 3" x 12' 60.00 bd.ft. @ 60.00 /bd.ft. = 3,600.00
2" x 2" x 12' 64.00 bd.ft. @ 60.00 /bd.ft. = 3,840.00
2" x 2" x 10' 200.00 bd.ft. @ 60.00 /bd.ft. = 12,000.00
4" x 4" x 10' 120.00 bd.ft. @ 60.00 /bd.ft. = 7,200.00
Corr. G.I. Sht. 12' 20.00 pcs. @ 400.00 /pc. = 8,000.00
8" Ridge Roll 3.00 pcs. @ 240.00 /pc. = 720.00
CWN (assorted) 10.00 kgs. @ 80.00 /kg = 800.00
Roofing Nails 240 pcs. @ 1.25 /pc. = 300.00
Toilet Bowl 1 pc. @ 450.00 /pc. = 450.00
Hinge 9 pcs. @ 50.00 /pc. = 450.00
Cement 5 bags @ 250.00 /bag = 1,250.00
Sand 0.3 cu.m. @ 450.00 /cu.m. = 135.00
Gravel 0.5 cu.m. @ 1,200.00 /cu.m. = 600.00
30" RCP 2 pc. @ 1,850.00 /pc. = 3,700.00
Material Cost = 80,025.00 /lot
B. Labor :
= 35% of Material Cost = 28,008.75 /lot
Equipments to be mobilized/demobilized
Total Heavy Equipments 4
3 - Backhoe
1 Loader
SUMMARY:
a. Materials =P 80,025.00 /lot
b. Labor = 28,008.75
c. Equipment = 72,000.00
EDC = 180,033.80
OCM = -
Profit = -
VAT:
5% EDC = 9,001.70
5% OCM = -
5% Profit = -
Total 189,035.50 /lot
FSSM 3% of (VAT+Profit+OCM+EDC) = 5,671.10
600.63636
674.86364
566.63636
157
DERIVATION OF UNIT COST ESTIMATES
(CONTRACT WORKS )
DIVERSION AND CARE OF WATER
Mark-up:
OCM 12 %
Profit 8%
B. Dewatering
Equipment used - 6"dia. Self Priming Centrifugal Pump (Output 4,933 lpm)
Operated Rental Rate 1,164.88 /hr (Including Fuel and Oil and Operator)
SUMMARY:
a. Selected Fill Materials =P - /lot
b. Labor = -
c. Equipment = 176,025.60
EDC = 176,025.60
OCM (12% of EDC) = 21,123.10
Profit (8 % of EDC) = 14,082.00
VAT:
5% EDC = 8,801.30
5% OCM = 1,056.20
5% Profit = 704.10
Total 221,792.30 /lot
FSSM 3% of (VAT+Profit+OCM+EDC) = 6,653.80
Mark-up:
OCM 12 %
Profit 8%
DREDGING
A) Dredging
Equipment used - 0.70 cu.m. Backhoe (HITACHI DAEWOO SOLAR 175LC-5)
Bucket Size - 0.75 cubic
SUMMARY:
a. Materials =P - /cu.m.
b. Labor = -
c. Equipment = 151.00
EDC = 151.00
OCM (12% of EDC) = 18.10
Profit (8 % of EDC) = 12.10
VAT:
5% EDC = 7.60
5% OCM = 0.90
5% Profit = 0.60
Total 190.30 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 5.70
###
2. Hauling
Equipment used - Dumptruck 10cu.m., 290HP
Capacity - 10 cu.m./trip
Operated Rental Rate 1,470.00 (P/hr)
AHD - 10.00 km
Type of Road: Poor maintained gravel road
Speed with Load 20.00 km/hr
Speed without Load 25.00 km/hr
Time Cycle:
To disposal site:
= 10.00 km x 60 mins/hr = 30.00 mins
20.00 km/hr
To loading area:
= 10.00 km x 60 mins/hr = 24.00 mins
25.00 km/hr
Loading, Spot, Maneuver time: 10 mins
Total cycle time 64.00 mins
SUMMARY:
a. Materials =P - /cu.m.
b. Labor = -
c. Equipment = 169.53
EDC = 169.50
OCM (12% of EDC) = 20.30
Profit (8 % of EDC) = 13.60
VAT:
5% EDC = 8.50
5% OCM = 1.00
5% Profit = 0.70
Total 213.60 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 6.40
Mark-up:
OCM 12 %
Profit 8%
STRUCTURE EXCAVATION
A)
Equipment used - 0.70 cu.m. Backhoe (HITACHI DAEWOO SOLAR 175LC-5)
Bucket Size - 0.75 cubic
SUMMARY:
a. Materials =P - /cu.m.
b. Labor = -
c. Equipment = 151.00
EDC = 151.00
OCM (12% of EDC) = 18.10
Profit (8 % of EDC) = 12.10
VAT:
5% EDC = 7.60
5% OCM = 0.90
5% Profit = 0.60
Total 190.30 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 5.70
###
Concrete
Class/Strength: Concrete Class A
Structure Type: Other Class A
A. Materials :
Cement 9.00 bags/cu.m. @ P 250.00 /bag = 2250.00
Sand 0.45 cu.m/cu.m. @ 450.00 /cu.m. = 202.50
Gravel 0.90 cu.m/cu.m. @ 1200.00 /cu.m. = 1080.00
RSB 45.00 kgs/cu.m. @ 65.00 /kg = 2925.00
Formlumber 25.00 bd.ft/cu.m. @ 60.00 /bd.ft. = 1500.00
1/2" Thk. Plywood 1.25 pc/cu.m. @ 800.00 /pc. = 1000.00
Tiewire 0.54 kgs/cu.m. @ 85.00 /kg = 45.90
CWN 2.00 kgs/cu.m. @ 85.00 /kg = 170.00
Material Cost = 9,173.40 /cu.m.
B. Labor :
a) Fabrication, placing & dismantling of Forms
Type: Class A
Capability - 3.50 cu.m/day
MANPOWER RATE/DAY AMOUNT
2 Carpenter P 750.00 P 1,500.00
4 Laborer 450.00 1,800.00
P 3,300.00 /day
SUMMARY:
a. Materials =P 9,173.40 /cu.m.
b. Labor = 3,656.30
c. Equipment = 256.72
EDC = 13,086.40
OCM (12% of EDC) = 1,570.40
Profit (8 % of EDC) = 1,046.90
VAT:
5% EDC = 654.30
5% OCM = 78.50
5% Profit = 52.30
Total 16,488.80 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 494.70
Mark-up:
OCM 12 %
Profit 8%
Total Structure Backfill = 200.00 cu.m. (Estimated total quantity including haul borrow)
A) Backfill
Available Materials = 200.00 cu.m.
Capability - 3 cu.m./day
Spreading (Manual)
Capability - 5 cu.m/day
1. Labor
Labor Cost = P 450.00 /day =P 90.00 /cu.m.
5.00 cu.m/day
Labor Cost for Spreading = 90.00 x - = -
Compaction (Manual)
Capability = 5 cu.m/day
Total Quantity = 200.00 cu.m.
SUMMARY:
a. Materials =P - /cu.m.
b. Labor = 240.00
c. Equipment = -
EDC = 240.00
OCM (12% of EDC) = 28.80
Profit (8 % of EDC) = 19.20
VAT:
5% EDC = 12.00
5% OCM = 1.40
5% Profit = 1.00
Total 302.40 /cu.m.
DERIVATION OF UNIT COST ESTIMATES
(CONTRACT WORKS )
FILTER DRAIN
Mark-up:
OCM 12 %
Profit 8%
1. Filter Drain
A. Materials :
5cm dia. PVC Pipe 0.66 l.m./cu.m. @ 135 /l.m. = 89.10
Gravel 0.45 cu.m. @ 1200.00 /cu.m = 540.00
Sand 0.65 cu.m. @ 450.00 /cu.m = 292.50
Material Cost = 921.60 /cu.m.
B. Labor :
1. Laying of Gravel & Sand (Filters)
Capability - 6 cu.m./day
MANPOWER RATE/DAY AMOUNT
6 Laborer 450.00 2,700.00
P 2,700.00 /day
SUMMARY:
a. Materials =P 921.60 /cu.m.
b. Labor = 480.00
c. Equipment = -
EDC = 1,401.60
OCM (12% of EDC) = 168.20
Profit (8 % of EDC) = 112.10
VAT:
5% EDC = 70.10
5% OCM = 8.40
5% Profit = 5.60
Sub Total 1,766.00 /cu.m.
FSSM = 53.00
TOTAL 1,819.00 / cu.m
/cu.m.
DERIVATION OF UNIT COST ESTIMATES
(CONTRACT WORKS )
REINFORCED CONCRETE PIPES
Mark-up:
OCM 12 %
Profit 8%
B. Labor :
Installation of R.C. Pipe
Capability - 10.00 l.m/day
MANPOWER RATE/DAY AMOUNT
1 Foreman P 1000.00 P 1,000.00
1 Mason 750.00 750.00
1 Carpenter / Steelman 750.00 750.00
12 Laborer 450.00 5,400.00
P 7,900.00 /day
Labor Cost = P 7,900.00 /day = P 790.00 /l.m.
10.00 cu.m/day
C. Equipment :
Equipment used - One-Bagger Concrete Mixer
Capability - 1.25 l.m./hr
Operated Rental Rate 172.00 /hr (Including Fuel and Oil and Operator)
SUMMARY:
a. Materials =P 3,100.70 /l.m.
b. Labor = 790.00
c. Equipment = 137.60
EDC = 4,028.30
OCM (12% of EDC) = 483.40
Profit (8 % of EDC) = 322.30
VAT:
5% EDC = 201.40
5% OCM = 24.20
5% Profit = 16.10
Total 5,075.70 /l.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 152.30
Mark-up:
OCM 12 %
Profit 8%
SUMMARY:
a. Materials =P - /sq.m.
b. Labor = 45.00
c. Equipment = -
EDC = 45.00
OCM (12% of EDC) = 5.40
Profit (8 % of EDC) = 3.60
VAT:
5% EDC = 2.30
5% OCM = 0.30
5% Profit = 0.20
Total 56.80 /sq.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 1.70
Mark-up:
OCM 12 %
Profit 8%
B) Spreading
Equipment used - Motor Grader, 125hp
Flywheel - 80 - 100 hp hp
Capability - 110.00 cu.m/hr.
Operated Rental Rate 1,658.00 /hr (Including Fuel and Oil and Operator)
C) Compaction
Equipment used - Single Smooth Drum Vibratory, Komatsu (10.60 Tons)
Ton - 10 Tons
D) Moisture Conditioning
Equipment used - Water Truck - 4,000 Gal. Capacity
Thickness of Base Coarse 0.15 m
Truck Speed 1.00 km/hr
Area Covered 500.00 sq.m./hr. (2 - way, 4m wide)
Capability - 75.00 cu.m/hr.
Operated Rental Rate 2,450.00 /hr (Including Fuel and Oil and Operator)
SUMMARY:
a. Materials =P 900.00 /cu.m.
b. Labor = -
c. Equipment = 78.94
EDC = 978.90
OCM (12% of EDC) = 117.50
Profit (8 % of EDC) = 78.30
VAT:
5% EDC = 48.90
5% OCM = 5.90
5% Profit = 3.90
Total 1,233.40 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 37.00
B) Spreading
Equipment used - Motor Grader, 125hp
Flywheel - 80 - 100 hp hp
Capability - 110.00 cu.m/hr.
Operated Rental Rate 1,658.00 /hr (Including Fuel and Oil and Operator)
C) Compaction
Equipment used - Single Smooth Drum Vibratory, Komatsu (10.60 Tons)
Ton - 10 Tons
D) Moisture Conditioning
Equipment used - Water Truck - 4,000 Gal. Capacity
Thickness of Base Coarse 0.15 m
Truck Speed 1.00 km/hr
Area Covered 500.00 sq.m./hr. (2 - way, 4m wide)
Capability - 75.00 cu.m/hr.
Operated Rental Rate 2,450.00 /hr (Including Fuel and Oil and Operator)
SUMMARY:
a. Materials =P 1,080.00 /cu.m.
b. Labor = -
c. Equipment = 78.94
EDC = 1,158.90
OCM (12% of EDC) = 139.10
Profit (8 % of EDC) = 92.70
VAT:
5% EDC = 57.90
5% OCM = 7.00
5% Profit = 4.60
Total 1,460.20 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 43.80
Concrete Pavement
A. Materials :
Cement 9.00 bags/cu.m. @ P 250.00 /bag = 2250.00
Sand 0.45 cu.m/cu.m. @ 450.00 /cu.m. = 202.50
Gravel 0.90 cu.m/cu.m. @ 1200.00 /cu.m. = 1080.00
RSB 6.00 kgs/cu.m. @ 65.00 /kg = 390.00
Formlumber 5.00 bd.ft/cu.m. @ 60.00 /bd.ft. = 300.00
CWN 0.25 kgs/cu.m. @ 85.00 /kg = 21.25
Material Cost = 4,243.75 /cu.m.
B. Labor :
a) Fabrication, placing & dismantling of Forms
Capability - 4.50 cu.m/day
MANPOWER RATE/DAY AMOUNT
1 Carpenter P 750.00 P 750.00
2 Laborer 450.00 900.00
P 1,650.00 /day
C. Equipment :
Equipment used - One-Bagger Concrete Mixer
Capability - 0.67 cu.m/hr
Operated Rental Rate 172.00 /hr (Including Fuel and Oil and Operator)
SUMMARY:
a. Materials =P 4,243.75 /cu.m.
b. Labor = 2,246.28
c. Equipment = 256.72
EDC = 6,746.70
OCM (12% of EDC) = 809.60
Profit (8 % of EDC) = 539.70
VAT:
5% EDC = 337.30
5% OCM = 40.50
5% Profit = 27.00
Total 8,500.80 /cu.m.
FSSM 3% of (VAT+Profit+OCM+EDC) = 255.00
A. Canalization Works
1. Canal Excavation w/ Embankment
A) Excavation
Capability - 2.5 cu.m./day
B) Compaction
Capability - 5 cu.m/day
SUMMARY:
a) Labor =P 283.66
c) Equipment Utilization = -
d) Office Supplies = -
=P 283.66
Say - - - - - - = P 283.66