ISC-JSA Installation For Mechanical Fence
ISC-JSA Installation For Mechanical Fence
1 Installation of mechanical Obtain the works authorization & take Projects T&I
fence works Authorization the clearance all concerned Unit
divisions like Operations.
2 Pre-Construction Safety All employees assigned to this task Contractor /
Meeting. will attend a pre-construction safety Sub-
meeting, which will include the Contractor
pertinent JSAs, Standard Operating
Procedures, types of potential
hazards, and actual hazards present
and controls for those hazards.
3 Preparation for Lack of knowledge of work All workers must have a thorough Contractor /
commencement in to be performed knowledge of the work to be Sub-
installation mechanical performed. Contractor
fence works Obtain General Permit to work
4 Installation of mechanical Manual Handling Wear appropriate PPE Contractor /
fence Use team lifting. Employ correct Sub-
lifting techniques. Contractor
Use mechanical assistance if
required.
Wear appropriate PPE (safety
Flying objects goggles)
Carrying paths to be free from trip
Slips/Trips hazards
ISC/HS/FRM/12 Rev 00
TASK/ACTIVITY : INSTALLATION OF MECHANICAL FENCE DATE: Page 2 of 4
ISC/HS/FRM/12 Rev 00
TASK/ACTIVITY : INSTALLATION OF MECHANICAL FENCE DATE: Page 3 of 4
Contractor
Personal Protective Equipment: (Minimum requirement: safety shoes / hard hat / visi-vest / gloves on person and used as required)
ISC/HS/FRM/12 Rev 00
TASK/ACTIVITY : INSTALLATION OF MECHANICAL FENCE DATE: Page 4 of 4