Erection Control Form - Lvac

This document is an erection control form used to inspect a power transmission system expansion project in Qatar. It contains 18 items to check during inspection of the LVAC panel, including verifying the location and condition of the panel, checking couplings and connections, ensuring devices are installed correctly, testing breaker operation, and validating wiring, identification, earthing, and cleanliness. The form requires signatures from engineers at ABB and EFC to confirm the inspection checks were performed satisfactorily.

Uploaded by

rashid rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views2 pages

Erection Control Form - Lvac

This document is an erection control form used to inspect a power transmission system expansion project in Qatar. It contains 18 items to check during inspection of the LVAC panel, including verifying the location and condition of the panel, checking couplings and connections, ensuring devices are installed correctly, testing breaker operation, and validating wiring, identification, earthing, and cleanliness. The form requires signatures from engineers at ABB and EFC to confirm the inspection checks were performed satisfactorily.

Uploaded by

rashid rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ERECTION CONTROL FORM

LVAC

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

1 Check for the location of panel as per layout drawing

2 Inspection for physical damage / defect

Inspection coupling, alignment and tightness (torque wrench


3
method)

4 Check the busbar connection tightness using torque wrench

Verify that all front panel mounted devices (meters, selector


5 switches, push buttons, timers and indication lights) are installed as
per layout drawing and correctly labeled.

Ensure rack in / rack out of breaker in proper alignment and


6
smoothness operation.

7 Ensure the CT polarity as per the approved schematics

8 Check the equipment earthing

9 Check cabling arrangement & identification.

10 Check the cable connection in accordance with drawings

11 Check gland tightness


ERECTION CONTROL FORM

LVAC

PROJECT : QATAR POWER TRANSMISSION SYSTEM EXPANSION, PHASE VI-PART 2

CONTRACT NO : GTC/05/2004 SBSTATION :

CUSTOMER : KAHRAMA SUPPLIER :


CONSULTANT : EFC INSPECTION REQUEST REF :
LOCATION : DRAWING REF :
Checked
Item Description of Check Remarks
Yes No N/A

12 Ensure the wiring identification of the panel

13 Ensure the equipment identification as per the approved drawing

14 Check the cleanliness of the panel

15 Check the gland earthing of all the compartments

16

17

18

ABB EFC
NAME OF ENGINEER : NAME OF ENGINEER :

DATE : DATE :

SIGNATURE : SIGNATURE :