Project Book k9 11
Project Book k9 11
A PROJECT REPORT
Submitted by
KARAN.K (822716103021)
RAJESH KANNAN.M (822716103036)
VEERAMANI.K (822716103045)
VIJAY.G (822716103049)
SIGNATURE SIGNATURE
HEAD OF THE DEPARTMENT SUPERVISOR
P.SUMATHI,ME,(Ph.D), Dr.S.SELVAMUTHUKUMAR,ME,Ph.D,
Head of the Department, Assistant Professor,
Department of Civil Engineering, Department of Civil Engineering,
Sengippati, Thanjavur – 613 402. Thanjavur – 613 402.
Above all we thank our parents and members of our family for their constant
support and encouragement for completing this project.
ABSTRACT
The purpose of construction of bank building which is proposed to locate at
mortgages. The building is planned as per the guidelines and norms given by
ATM, Manager Hall, UPS room, Waiting hall, Staff room, File room, Separate
The plan of the building is done using AUTO CAD and the same is designed
for all the load combination such as dead load, live load with relevant use of Indian
Standard codes IS 456 – 2000, IS 875- 1987 (part II) and IS 1569 – 2003 (strong
room). The building is designed as a framed structure such as slab, beam column
and footing are designed using Limit State Method of Design. The quantities of
material are estimated and the cost of building is arrived as per the rates given by
List of symbols
List of figure
1 INTRODUCTION
1.1 General
1.2 Objective
1.3 Methods of Design
1.4 Work flow
2 DATA COLLECTON, LOAD AND
DATA
2.1 Data
2.2 Load considered
2.2.1 Dead load
2.2.2 Live load
3 DESIGN OF STRUCTURAL
ELEMENTS
3.1 Design of slab
3.2 Design of beam
3.2.1 Load distribution on beam
3.2.2 Design of beam (longer span)
3.2.3 Design of beam (shorter span)
3.2.4 Design of plinth beam
3.3 Design of column (axial load)
3.4 Design of footing
3.5 Design of lintal beam
3.6 Design of sunshade
BANK BUILDING:
Bank building which is proposed to construct at sanadorium sengipatti,
Thanjavur with a total area of 5000 sq.ft. The building is designed as a RCC framed
structure consisting of slab, beam and column built monolithically and provided with
strong room which is reinforced concrete wall.
Bank building consists, Manager room, Staff room, File room, UPS room,
Strong room, Separate toilets, Meeting hall, Waiting hall, ATM, various counters.
The strong room is planned and designed as per guidelines given by reserve bank of
India and norms specified by IS15369-2003. The RCC walls built as cast in-situ
construction. The strong room is provided with additional safety features. As the
working area is large T beam is provided to distributed load evenly.
The main objective of plan, Design and Estimation of bank building is to carry
out the comprehensive design of structural element such as,
1. The selection of the appropriate structural forms & its sizes and laying out
the locations and arrangements of structural elements such as slab,
columns, and beams.
2. To obtain the conceptual design of T beams
3. To acquire the knowledge about the reinforced concrete walls and its
relevant codal provision.
4. To determine the required reinforcement, both longitudinal and transverse.
5. Detailing of reinforcement such as development lengths, hooks, and bends.
Fig 2.1-Layout
TB Sanitorium
GCE,
Construction Thanjavur.
area
3.DESIGN OF STUCTURAL ELEMENTS
3.1.DESIGN OF SLAB
= 92 ≈ 110mm
Revised Effective depth , d = 110 – 4 – 20
= 86 mm
Effective depth for larger span , d = 86 – 8 = 78 mm
Step 4 : Load calculation
Dead load (0.11x 25) = 2750 N/m²
Live load = 3000 N/m²
Floor load = 500 N/m²
Total load = 6250 N/m²
Factored load = 1.5 x 6250 = 9375 N/m²
Step 5 : Choosing of Effective span
Effective span = Clear span + Effective depth ω
= 3.226 + 0.086
= 3.312 m
Step 6 : Moment calculation
Slab (1) & (3) [ Two adjacent edges is discontinuous]:
Short span,
Positive moment at mid span
Mx = αx Wu l²
= 0.045 x 9.375 x 3.312²
= 4.62kNm
Long span,
Positive moment at mid span ,
My = αx Wu l²
= 0.028 x9.375 x 3.312 ²
= 3.13 KNm
Negative moment at continuous edges
Mx = αy Wu l²
= 0.037 x 9.37 x3.312 ²
= 3.8 KNm
Final negative moment in long span in slab (2)&(1)(3)
= 4.24KNm
Check effective depth ,
Mu lim = Mu max = 0.138 ƒck bd²
5x10⁶ = 0.138x20x1000xd²
d = 42.6mm < 86mm
Hence ok
Step 7 Design of flexural reinforcement
Short span,
Moment , Mx = 4.26 KNm
𝑀𝑢 4.26𝑥10⁶
R = = = 0.62
𝑏𝑑² 1000𝑥86²
fck 4.6 R
Percentage of steel , pt = 50 1 1
fy fck
20 4.6 x0.62
= 50 1 1 = 0.18%
415 20
𝑃𝑡 0.18
Area of steel , Ast = xbd = x1000x86
100 100
= 154.8mm²
𝜋
𝑎𝑠𝑡 ( )𝑥8²
4
Spacing = x1000 = x 1000 = 325mm
𝐴𝑠𝑡 154.8
Astmin = 132 mm
Solution for other sides
Slab Effective Percentage of Area of Spacing
Moment Depth, d R= 𝑀 steel, steel, (mm)
𝑏𝑑 2
(mm) Pt= Ast
M(KNm) fck 4.6 R (mm²)
50 1 1
fy fck
Slab (1&3)
SHORTER
SPAN
1.mid span 4.62 86 0.62 0.18 154.6 300
2.continuous 6.17 86 0.83 0.242 208 240
edge
LONGER
SPAN 3.6 78 0.59 0.17 132 300
1.mid span 4.24 78 0.69 0.2 156 300
2.continuous
Edges
Slab(2)
Shorter span
1.mid span 3.7 86 0.5 0.14 122.8 300
(Astmin = 300
132
2.continuous 5 86 0.676 0.2 mm²)
edge 156
LONGER
SPAN 3.13 78 0.645 0.186 300
1.mid span 141.3
Step 8 Torsional reinforcement
𝐿𝑥 𝐿𝑥 3.312 3.312
Covering area = 𝑥 = 𝑥 = 438.7mm²
5 5 5 5
Spacing = 322mm
Provide 8mm ɸ bars @ 300mm c/c in top & bottom Main reinforcement
Slab (1): [at corner]
1
Ast = x 156
2
= 78mm²
Spacing = 800mm
Provide 8mm ɸ bar @ 300mm c/c in top & bottom of Main reinforcement
2.75𝑥3.226 1
= 2x 1 3 * 1.2 2
2
= 6.81 KN/m
𝑊𝑙𝑙 𝑥 𝑙𝑥 1
Live load = 2 x 1 2
2 3
3𝑥3.226 1
=2x 1 3 * 1.2 2
2
= 7.43 KN/m
b) Formula for convert Triangular load from slab to UDL acting on short
span beam,
𝑊𝑑𝑙 𝑥 𝑙𝑥
Dead load = 2 x
3
2.75 𝑥 3.226
= 2x
3
= 5.91 KN/m
𝑊𝑙𝑙 𝑥 𝑙𝑥
Live load = 2 x
3
3 𝑥 3.226
= 2x = 6.453 KN/m
3
3.2.2. BEAM ( longer span )
use 16 mm ɸ bars,
= 3886 +230
= 4116mm
= 4138mm
12 10
Mu = = 14.8 KNm
Wdl Wll
First interior, Mu = - 10 9 x1.5 xl = 37.63KNm
2
= 0.138x20x230x252²
Mu lim > Mu
1) Reinforcement in bottom
Mu = 37.63 KNm
R = M = 2.57
bd 2
20 1 4 .6 x 2 .3
Pt = 50 1 = 0.86%
415 20
A st = ((0.86/100)x230x252) = 505mm²
= 33.1KN
2. First interior support
inner side = (0.55 xWdl + 0.6xWll)x1.5xl
= 44.85 KN
outer side = ( 0.6Wdl + 0.6Wll) 1.5xl
= 47.01 KN
Step: 7 Shear reinforcement
Maximum shear force , Vu = 47.01KN
shear force 𝜏v = ( Vu/bd) = (47.01x10ᶟ)/(230x252)
= 0.81 N/mm²
From IS 456 – 2000
𝜏c = 0.62 N/mm²
𝜏cmax = 2.8 N/mm²
Here 𝜏v > 𝜏c
This beam need for shear reinforcement
For vertical stirrups, Vus = (0.87ƒy Asv d)/(Sv)
where Vus = Vu - 𝜏c bd
= 47.01x10ᶟ - (0.62x230x252)
= 11.07 KN
provide 2 legged 8mm ɸ bars for stirrups,
Asv = 2x(𝜋/4) x8² = 100.53mm²
spacing of stirrups , Sv = ( 0.87x415x100.53x252)/(11.07x10ᶟ)
= 826mm
0.75𝑑 = 0.75𝑥252 = 189𝑚𝑚
minimum spacing { }
300𝑚𝑚
provide 2 legged 8mm ɸ bars @ 180mm c/c
Step : 8 check for deflection
(L/d) act = ( L /d) basic x Kt x Kc x Kf
Pt = 0.75% ; L/d= (4100/252) = 16.27
Kc = 1.2 ; Kt = 1.5
(L/d)max = 26x1.2x1.5 = 46.8
(L/d) max > (L/d) actual
Hence deflection control is satisfied
Result :
Total depth = 300 mm & breadth = 230 mm
No of bars = 3 (bottom) & dia bars = 16 mm
Dia of stirrups = 8 mm & 2 legged
Spacing = 180 mm
3.2.3 BEAM ( shorter span )
STEP 1 Effective depth
overall depth = 3226/ 15 = 215 ≈ 230 mm
width = 300 / 1.5 = 200 ˂ 230 mm
width = 230 mm
we provide 16mm ɸ bars and nominal cover = 40mm
Effective depth d = 300 – 40-(16/2) = 252mm
Step 2 Load calculation
triangular load from the slab , Dead load = 5.91KN/m
Beam self weight = 1.725KN/m
Wu dl (1.5) = 8.865 KN/m
Live load = 6.452 KN/m
Wu LL (1.5) = 9.678 KN/m
Step 3 Effective span
a) effective span = clear span + effective depth
= 3.226 + 0.252
= 3.48 m
b) effective span = clear span + width of bearing
= 3.226 + 0.23
= 3.456 m
Step 4 Moment calculation
a) Positive moment
=
Wudl Wull 2
1. End span l = 20.4 KNm
12 10
Wudl Wull 2
2. Interior span = 16 12 l = 16.25KNm
b) Negative moment
=
Wudl Wull 2
1. End support l = 9.23KNm
24 24
fck 4. 6 R
Pt = 50 x 1 1 = 0.5%
fy fck
Result :
Total depth = 300 mm & breadth = 230 mm
No of bars = 2 (bottom) & dia bars = 16 mm
Dia of stirrups = 8 mm & 2 legged
Spacing = 180 mm
3.2.4 DESIGN OF PLINTH BEAM
step 1 Depth Required
overall depth D = ( 3886 / 15 ) = 259mm ≈ 300mm
Width = 230mm
effective depth = 300 - 40 - 8 = 252mm
Step 2 Load calculation
wall load = 3 x 0.23 x 18 = 12.42 KN/m
Factored load = 18.63 KN/m
Step 3 Moment calculation
Effective span = 3886 + 252 = 4116mm
Moment , Mu = (wl²/ 8) = 39.456 KNm
𝑀u limit = 0.138 ƒck bd ² = 40.31KNm > Mu
hence we need to design singly reinforcement beam
Step 4 Reinforcement calculation
M = 39.45KNm ; R = (M/bd²) = 2.7
fck 4.6 R
Pt = 50 x 1 1 = 0.92%
fy fck
Result :
Total depth = 300 mm & breadth = 230 mm
No of bars = 3 (bottom) & dia bars = 16 mm
Dia of stirrups = 8 mm & 2 legged
Spacing = 180 mm
3.3 DESIGN OF COLUMN(Axial load)
Step 1 Load calculation
Total load = ( Axial load + self weight of column + load from wall )
= 160 + 6.48 + 72.39
= 238.87 KN
Factor Load = 358.3 KN
Floor height = 4m
Step 2 Slenderness ratio
λ = (l eff )/ D = (4000x0.5)/230 = 10.65< 12
Hence, It is a short column
Step 3 Eccentricity calculation
e min =
L D 400 x0.5 230
= 11.6mm<20mm
500 30 100 3
ƒck = 20 N/mm²
ƒy = 415 N/mm²
Q = 2.76
L = 3.886m
= 125mm
= 0.95m
STEP 3 Load calculation
Weight of wall = 18 x 0.23 x 0.95
= 3.93kN/m
self weight of beam = 0.23 x 0.15 x 25
= 0.86 kN/m
Total = 4.8 kN/m
Factored load = 7.18 kN/m
Bending moment(M) = WL²/8
= 13.55kNm
Step 4 Effective depth calculation
MU = Qbd2
13.55X106 = 2.76X230Xd2
d = 146 < dprovided (125mm)
Hence provide D = 200mm
Effective depth ,d = 200 - 20 – (12/2) = 174mm
Mu lim = 2.76 x 230 x 174 = 19.2KNm
Hence this section is under reinforced section
fck 4.6 R
Pt = 50 x 1 1 = 0.61%
fy fck
Ast = 244.12mm2
Min Ast = 0.12% bD
=55.2 mm2
Let provide 12mm ɸ bars
no of bars = (Ast /ast ) = 2.15 ≈ 3
provide 3 no of 12mm ɸ bars
Step 6 : Check for shear
VU = W x l
= 27.9KN
Nominal shear stress τv = (Vu/ bd) = 0.69 N/mm²
design shear strength τc
% of steel = (Ast / bd)x 100
= 0.84%
τc = 0.29N/mm2
τv > τ c
Hence, we it need shear reinforcement
fck 4.6 R
Pt = 50 x 1 1 = 0.35%
fy fck
Ast = 261mm2
Min Ast = 0.12% bD
= 120 mm2
Spacing = Ast / ast = 433 mm
Minimum spacing,
i) 3d = 3x74 = 222mm
ii) 300mm
provide 12mm dia bars 220mm c/c
Walls:
12 mm dia mild steel/tor steel @ 6" c/c both ways and on the both faces of the
wall (a formation of reinforcement matt of about 6"x6") on either face of the
wall to be obtained.
FLOOR
Same as in the case of walls but only on one face.
CEILING
Same as in the case of walls.
5.1ANALYSIS OF RATES
SUB DATA:
SUB DATA:
MAIN DATA:
MAIN DATA:
MAIN DATA:
MAIN DATA:
1. Earth work
Excavation
1.Rcc column 12 1.5 1.6 1.3 37.44 mᵌ
2.plinth beam 1 49.0 0.23 0.3 33.81 mᵌ
71.25 mᵌ
2. Pcc footing 12 1.5 1.5 0.1 2.7 mᵌ
3. Rcc work
Rcc work footing
Column 12 1.5 1.5 0.3 8.1 mᵌ
Below G.L
Above G.L 12 0.23 0.23 0.9 0.571 mᵌ
12 0.23 0.23 5.81 3.688 mᵌ
12.359 mᵌ
4. Plinth beam 1 64.49 0.23 0.3 3.381 mᵌ
5. Lintel beam 3 1.5 0.23 0.2 0.207 mᵌ
6. Roof beam
Longer Length
Shorter Length 1 33.36 0.23 0.3 2.30 mᵌ
Deduction
Door (D1) 1 0.9 0.23 2.1 58.17 mᵌ
(900x2100)
Main door 1 1.5 0.23 2.1 0.437 mᵌ
(1500x2100)
Door (D2) 4 0.9 0.23 2.1 0.724 mᵌ
(900x2100)
Window (W) 2 1.2 0.23 1.2 1.73 mᵌ
(1200x1200)
Ventilator 2 0.75 0.23 0.45 0.6624 mᵌ
(750x450)
0.155 mᵌ
(B.W–
Deduction)
3.678 mᵌ
Brick Work
54.50 mᵌ
10. Plastering
Main wall 2 3.810 - 4 304.8 m²
Parapet wall 2 38.1 - 1 76.2 m²
ATM 2 7.17 - 4 57.36 m²
Cross wall 2 13.92 - 4 111.36 m²
Deduction door
Door (D1)
Main door 1 0.9 - 2.1 1.9 m²
Door (D2) 1 1.5 - 2.1 3.15 m²
Window 4 0.9 - 2.1 7.56 m²
Ventilator 2 1.2 - 2.1 5.04 m²
(750x750) 2 0.75 - 2.1 3.15 m²
528.92 m²
11 Celling
plastering
C.M 1:3
Under roof slab
16 Supplying
Doors &windows
Main door
Door 1 1.5 - 2.1 3.15
Window 5 0.9 - 2.1 9.5
2 1.2 - 2.1 2.9
Wood
&aluminium
LS
Rolling Shutters
LS
Septic tank LS
Water tank LS
Electrical LS
Plumbing LS
&santor
Fine &safety
Work LS
5.3 ABSTRACTE ESTIMATE
Sl.no Item of Cost Unit Rate per Total rate
works unit
1 Earthwork 71.25 mᵌ 200 14,250
2 Pcc work 2.7 mᵌ 41775 11,279.25
3 Rcc work 47.15 mᵌ 15492.4 7,30,466
4 Brick work 54.50 mᵌ 5947.9 3,24,160.5
5 Plastering 570.5 m² 250.5 1,42,910.25
wall,
Door,window
6 Celling 25 m² 250.5 6,262.5
plaster
CM 1:3
under roof
slab,beam 2
sides
7 Sunshade 14.4 m² 250.5 3,607.2
8 Floor Finish 325.5 m² 2700 8,78,850
9 White wash 597 m² 255.4 1,52,473.8
(double coat)
10 Colour wash 570 m² 240.3 1,36,971
11 Weathering 93.15 m² 2600 2,42,190
coarse
12 15.5 mm² 500 7,750
13 Wood & LS 3000 3,000
Aluminium
14 Rolling LS 7000 7,000
shutter
15 Septic tank LS 20000 20,000
16 Water tank LS 22000 22,000
17 Electrician LS 15000 15,000
work
18 Plumping LS 30000 30,000
sanitary
TOTAL 27,48,171
6.CONCLUSION
IS 456-2000 and SP16 .The strong rooms is planned and designed as per the codal
provision specified in IS 15369 – 2003 .The total cost of building is Estimated as
Rs.27,48,171/-
REFERENCE