0% found this document useful (0 votes)
33 views

Lab Exercise #3

This document provides instructions for a laboratory exercise on construction methods and project management. Students are asked to create a video presentation discussing the importance of procurement planning and budgeting, the procedures for procuring infrastructure contracts, alternative procurement methods and their terms and conditions. The presentation should be a minimum of 5 minutes and address guidelines on the 2016 Revised Implementing Rules and Regulations of RA 9184. Students will be evaluated on their knowledge, eloquence, time management and voice. The deadline for submission is October 26, 2021.

Uploaded by

Apple Aterrado
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

Lab Exercise #3

This document provides instructions for a laboratory exercise on construction methods and project management. Students are asked to create a video presentation discussing the importance of procurement planning and budgeting, the procedures for procuring infrastructure contracts, alternative procurement methods and their terms and conditions. The presentation should be a minimum of 5 minutes and address guidelines on the 2016 Revised Implementing Rules and Regulations of RA 9184. Students will be evaluated on their knowledge, eloquence, time management and voice. The deadline for submission is October 26, 2021.

Uploaded by

Apple Aterrado
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

CAVITE STATE UNIVERSITY


Don Severino delas Alas Campus
Indang, Cavite

COLLEGE OF ENGINEERING AND INFORMATION TECHNOLOGY


Department of Civil Engineering

Construction Methods and Project Management (CENG 115)


Laboratory Exercise No. 4

Learning Objectives:
1. Discuss the importance of procurement planning and budgeting.
2. Identify guidelines for the procurement and implementation of infrastructure
projects.
3. Determine the alternative methods of procurement.

Task: Make a video of yourself and address the following concepts. It could be in
English or in Filipino language.

Instructions:

1. Research and review the 2016 Revised Implementing Rules and Regulations of RA
9184.
2. Create a presentation and record yourself for a minimum of 5mins. Briefly discuss the
following guide questions.

 What is the importance of procurement planning and budgeting?


 What are the procedures or stages involved for the procurement and
implementation of contracts for infrastructures?
 What are the alternative methods of procurement? Give example each.
 What are the terms and conditions for the use of alternative methods of
procurement?

3. Submit your output by uploading your video and presentation in your respective folder
under laboratory exercise folder in Google drive.

4. Failing to submit on or before the deadline will mark your outputs late.

5. The due date will be on October 26, 2021, EOB.

Evaluation Criteria:

Learner’s Knowledge 30%


Eloquence 30%
Utilization of time 20%
Voice 20%
TOTAL 100%

You might also like