PERFORMANCE MANAGEMENT REPORTING MODULES
FOR FEDERAL AIRPORTS AUTHORITY OF NIGERIA
Federal Airports Authority of Nigeria (FAAN) is a service organiza�on statutorily charged to manage all commercial airports in
Nigeria and provide service to both passenger and cargo airlines. The Authority is responsible for crea�ng condi�ons for the
development of air transport and services connected with it, in the most economic and efficient manner. FAAN is supervised
by the Ministry of Avia�on.
Currently FAAN’s management team is composed of Capt. Hamisu Rabiu Yadudu, as the MD/CE, with Engr. Salisu Nurudeen Daura
as the Director, Engineering Services, Mrs. Aboderin Adenike, as the Director, Finance and Accounts,Mr. Anozie Honorius, as
Dircteor Human Resources and Administra�on,Mr. Abdulkadir Sadiku Rafindadi, as as the Director, Commercial and Business
Development, Capt. Sadiq Usman Salim Abubakar, as Director, Security Services, Capt. Mukhtar Muye as Director, Airport
Opera�ons and Barr. Dr. Omozeghian Imade Clifford, as the Company Secretary/Legal Adviser.
VISION STATEMENT
To be among the best Airport Groups in the world.
MISSION STATEMENT
To develop and profitably manage customer-centric airport facili�es for safe, secure and efficient carriage of
passengers and goods at world class standards.
CORE VALUES
We are guided by: Safety, Integrity, Dedica�on, Excellence and Service (SIDES)
CORE FUNCTIONS
FAAN’s func�ons include the following:
i. To develop, provide and maintain at airports, and within the Nigerian airspace all necessary
services and facili�es for the safe, orderly, expedi�ous and economic opera�on of air transport.
ii. To provide adequate condi�ons under which passengers and goods may be carried by air and under which
aircra� may be used for other gainful purposes, and for prohibi�ng the carriage by air of goods of such classes
as may be prescribed.
iii. To charge for services provided by the Authority at airports.
iv. To provide accommoda�on and other facili�es for the effec�ve handling of passengers and freight.
v. To develop and provide facili�es for surface transport within airports.
vi. To carry out at the Airports (either by itself or by an agent or in partnership with other persons) economic
ac�vi�es that are relevant to air transport.
vii. To carry out at the Airports (either by itself, its agent or in partnership with other persons) such other
commercial ac�vi�es which are not relevant to air transport but which in the opinion of the Authority may
be conveniently carried out without prejudice to the func�ons specified in this subsec�on.
viii. To provide adequate facili�es and personnel for effec�ve security at all airports, etc.
2
FOREWORD
In the Ministry of avia�on, we are desirous to entrench series of reforms in order to key
into and sustain interna�onal best prac�ces and ensure safety and security in our airports,
while providing our customers with affordable and best flying experiences. Performance
management repor�ng is no doubt a veritable tool to achieving these reforms agenda.
Performance management repor�ng addresses the gaps inherent in project formula�on
and implementa�on. Thus, this handbook is a deliberate a�empt to chart the way to the
realiza�on of this next level agenda in FAAN.
Some of the projects we inherited in 2015, would have been completed and
commissioned in 2014 or even before then, if the tenets of PMR were followed in their
formula�on and implementa�on. This not being the case, some of these projects were s�ll
less than 30% completed when we were handed over in 2015. We also no�ced that because
major stakeholders were not carried along in the formula�on of these projects, most of
them had serious func�onal challenges and so needed remodeling. The huge costs inherent
in remodeling of such projects would have been avoided if the ini�ators had the benefit of
and the applica�on of the knowledge in this handbook.
Therefore, in order to avoid the costly mistakes of the past, I hereby recommend
this handbook, Performance Management Repor�ng Modules to you, while appealing that
the content be read with understanding and conscious and deliberate effort to put it into
prac�ce.
3
PREFACE
4
About this handbook
This handbook is a modest contribu�on from the Planning, Research and Sta�s�cs Department intended to
strengthen the following principal competencies of FAAN staff:
• Understanding conceptual frameworks for program or project design planning and
implementa�on upon which management repor�ng will be based;
• Iden�fying and dis�nguishing between the key components of management repor�ng in airports;
• Understanding the synergis�c rela�onships between program design, implementa�on and
management in order to determine the expected impact and objec�ves and how they will be achieved;
• Knowledge of the various tools and frameworks for performance management repor�ng design for
effec�ve planning and management decision making;
• Determine appropriate airport key performance indicators and key performance areas for project
design, implementa�on as well as project outcomes and impact;
• Developing effec�ve, flexible and responsive project management repor�ng plans; and recording and sharing
informa�on on best prac�ces and lessons learned in PMR in the Authority.
As illustrated in the handbook, a project or program employs a progression of ac�vi�es that is consistent from the design
through execu�on, implementa�on and to the evalua�on stage. These ac�vi�es begin when an organiza�on, like
FAAN, mobilizes a set of inputs (human, financial resources and equipment),to carry out ac�vi�es (training sessions,
tangible and intangible programs, projects, infrastructure modelling) that will generate outputs (number of people
trained, number of carousels bought, level of awareness created, kilometers of runways built or maintained).
Outputs contribute to outcomes, which cause changes in behaviors or systems among clients or benefactors of the
project (e.g., increased knowledge, improved services, safety, environmental sani�za�on, airport deconges�on,
easy facilita�on, ease of doing business, etc.). Outcomes contribute to impacts, which should be sustainable
and a welcoming improvement in fundamental condi�ons at airports, leading to passengers and airlines’
sa�sfac�on, community-airport’s cordial rela�onship and improvement in general welfare of members of staff
and other stakeholders.
It is our hope that you will find the collec�ons of these edited �me-tested modules in this handbook very invaluable
in your day-to day ac�vi�es in FAAN.
Hycienth Ngwu
General Manager (PRS)
5
ACKNOWLEDGEMENTS
We hear�ly appreciate the various Authors,Researchers and Corporate Organiza�ons whose works we edited and
modified to suite our needs in this handbook.
Also, our unalloyed apprecia�on goes to the Directors and Management of Federal Airports Authority of Nigeria,
(FAAN) led by the Managing Director/CE, Capt. Rabiu Hamisu Yadudu for the support.
And to all members of staff of Federal Airports Authority of Nigeria, the astute and indefa�gable
General Managers,Regional Managers,Airport Managers, DGMs and AGMs for their inspira�on.
And, to the staff of Planning, Research and Sta�s�cs Department for their dedica�on and diligence to duty.
“Our desire is to make air travel more affordable to all and this we are achieving with the injec�on of funds
to provide new terminals and re-modelling of our airports. The infrastructure at the na�on’s avia�on
industry have not been improved upon since 1970s and 80s when they were built. Our administra�on is
making deliberate efforts to increase handling capaci�es and infrastructure of the na�on’s transport
sector”
6
INTRODUCTION
Federal Airports Authority of Nigeria is statutorily charged among other things, to develop, provide and maintain
at airports and within Nigerian air space all necessary services and facili�es for the safe, orderly, expedi�ous and
economic opera�ons of the air transport; to provide adequate condi�ons under which passengers and goods may
be carried by air and under which aircra� may be used for other gainful purposes; to develop and provide facili�es
for surface transport within the airports; to provide adequate facili�es and personnel for effec�ve security at all
airports; … to do anything which in its opinion is calculated to facilitate the carrying out of its du�es under this Act.
By carrying out these func�ons, FAAN creates certain projects or services (outputs) for specific stakeholders,
(passengers, airlines, tenants, airport communi�es, etc). If these stakeholders u�lize the outputs, they may then
change the way of doing certain thing(s) and experience some level of benefit (outcome) as a result of u�liza�on
of the outputs. These outcomes may contribute, together with the results of other projects or services, to bring
about desired goals (impacts). And in this way FAAN’s mission and vision are achieved. These are the principal
objec�ve of performance management report.
Performance Management Repor�ng is a systema�c process by which an agency or MDA involves its employees
as individuals and members of a group in improving organiza�onal effec�veness in the accomplishment of the
agency’s mission and goals (mandate). It defines the impact and outcome using Key Performance Indicators (KPIs)
and targets to track changes on the impact Key Results Areas (KRAs) in a Medium-term Sector Strategy or Strategic
Plans
Unlike the conven�onal Monitoring and Evalua�on technique, Performance Management Report is a process
designed to improve service delivery, strengthen management effec�veness and efficiency, and have evidenced based
accountability. It is a sub-set of a broader change management concept called Results Based Management (RBM).
RBM is a management strategy that focuses on achieving results and performance (outcomes and impact) rather
than solely ac�vi�es and inputs. Its primary objec�ve is to provide evidence-based data/informa�on that would
support management decision making and general governance management control. It provides informa�on on
how a service or project is progressing, where there are challenges and what might be the solu�ons. It engenders
a process where service providers are accountable for resource u�liza�on and results delivered.
The Key Performance Indicators are measures of project or program impacts, outcomes, outputs and inputs that
are monitored during project or program implementa�on.to assess progress toward project objec�ves. They are
also used later to evaluate project’s success. Indicators organize informa�on in a way that clarifies the rela�onship
between the project’s impacts, outcomes, outputs, and inputs and helps to iden�fy a problem along the way that
can impede the achievement of the project’s objec�ves. KPIs are derived from a project’s development objec�ves
and implementa�on plan. Thus, they are project specific and link a project’s inputs and ac�vi�es with quan�fied
measures of expected outputs and impact.
The integra�on of performance indicators with the conven�onal monitoring and evalua�on techniques
came due to the inadequacies of the later to focus adequately on the factors that are cri�cal for posi�ve
development impact. Other inadequacies include the too much emphasis placed on the mechanics (physical and
financial) of project implementa�on; project objec�ves were o�en not well thought out or clearly ar�culated
clouding the development of appropriate performance monitoring indicators; the risks and factors that mostly
influence project outcomes were poorly iden�fied and so ra�ngs tended to be overly op�mis�c, etc. All these
make the conven�onal monitoring and evalua�on very difficult and unrealis�c.
7
Consequently, studies, par�cularly, that of the Por�olio Management Task Force Report and its reviews by the
Opera�ons Evalua�on Department of the World Bank were commissioned and the outcome gave the integra�on
of performance indicators with the conven�onal monitoring and evalua�on techniques, and so performance
management report was midwifed.
USES OF PERFORMANCE INDICATORS
• STRATEGIC PLANNING: For any project or ac�vity, incorpora�ng performance measurement into the
design forces greater considera�on of the cri�cal assump�ons that underlie that program’s rela�onships
and casual paths. Thus, performance indicators help clarify the objec�ves and logic of a program
• PERFORMANCE ACCOUNTING: Performance indicators can help inform resource alloca�on decisions
if they are used to direct resources to the most successful ac�vi�es and thereby promote the most efficient
use of resources.
• FORECASTING AND EARLY WARNING DURING PROGRAM IMPLEMENTATION: Measuring progress against
indicators may point toward future performance, providing feedback that can be used for planning,
iden�fying areas needing improvement, and sugges�ng what can be done.
• MEASURING PROGRAM RESULTS: Good performance indicators measure what a program has achieved
rela�ve to its objec�ves, not just what it has completed; in this way they promote accountability.
• BENCHMARKING: Performance indicators can generate data against which to measure other projects or
programs. They also provide a way to improve program from learning from success, iden�fying good
performers, and learning from their experience to improve the performance of others.
• QUALITY MANAGEMENT: Performance indicators can be used to measure customer sa�sfac�on, and so assess
whether and how the program is improving their lives and u�lity.
Thus, Performance Management Reports (PMRs) are main products of sector performance analysis. It serves as
main source of performance informa�on about progress made in achieving results defined in Medium term Sector
Strategy (Strategic Plans) and Zero Budget ZBB. It is the prac�ce of change process which is designed to improve
service delivery, strengthen management effec�veness and efficiency, and have evidenced based accountability.
FAAN is commi�ed to key into the performance management repor�ng to promote and align to the Economic
Recovery and Growth Plan (ERGP) of Federal Government and Execu�ve Orders which seek to create conducive
business environment, diversify the economy and ensure a sustainable economic growth
The modules in this booklet, are presented in an easy to understand formats. We have also tried to give mul�ple
examples of various outputs, with their goals and their KPIs. We hope that readers and stakeholders will use the
examples to ar�culate properly their developmental outputs with specific goals and monitorable KPIs
8
GENERAL OVERVIEW OF PERFORMANCE MANAGEMENT REPORTING IN FAAN
The key objec�ve of performance management repor�ng in Federal Airports Authority of Nigeria (FAAN) seeks
to align workers interests to FAAN’s vision, mission and core values. It seeks to iden�fy efficient, effec�ve and
economic ways through which FAAN’s ac�ons, ac�vi�es, projects and programs can be achieved. It does this by
se�ng goals and benchmarks for outputs and establishing baseline data, key performance indicators for measuring
progress during implementa�on and intended goals. Through this, FAAN’s objec�ves are achieved and workers’
welfare maximized. In FAAN, the process is as follows:
i. Performance Planning sets out performance expecta�ons and goals for the Directorates in line with their
mandates towards achieving overall objec�ves of FAAN. These expecta�ons and goals are usually ar�culated in the
directorate’s strategic plan and from where yearly budgets, are usually drawn by the departments in the
Directorate. The compila�on is presented and defended by them in the FAAN IGR Budget Commi�ee. At the end
of the financial year, the performance of each directorate is ar�culated, collated and published in FAAN’s Annual
report by the PRS department
ii. Performance Monitoring starts with the monitoring of staff daily performance in office. Usually targets based on
previous benchmarks are given and outputs assessed at the end of the week.
iii. Managing Director’s Commi�ee on Performance Management Report. The membership of this commi�ee is
drawn from various departments. Senior officers from grade level 13 to 15 are nominated by their Directors to
represent them in the Commi�ee. The Commi�ee is charged with the responsibility of carrying out the func�ons
of performance management repor�ng for FAAN. The General Manager of Planning, Research and Sta�s�cs is
the Chairman of the commi�ee. The report of this commi�ee is presented to the Managing Director, who is the
Chief Execu�ve of FAAN for considera�on and further direc�ve.
“ Change does not just happen, you and I must appreciate that
we all have our part to play if we want to bring CHANGE about”
-------- President Buhari
9
MODULE 1
Central to result-based management (RBM) is the ‘results chain’ – the causal sequence for an opera�on that
s�pulates the necessary sequence to achieve desired objec�ves – beginning with inputs, moving through
ac�vi�es and outputs, and culmina�ng in outcomes and Impact (overall Goal/s). This provides the framework for
the iden�fica�on of indicators for performance management repor�ng. Figure 1.1 below illustrates this:
Goal The
Theposi� ve and
positive nega�
and ve, intended
negative, and and
intended unintended
unintended long-term
long-term results produced by FAAN project
results produced by FAAN project or program.or program.
“RESULTS”
Purpose
The
Themedium
medium– term results
– term of FAAN’s
results ac�vi�
of FAAN’s es.
activities.
Outputs
The
Theproducts
products,andactivities
ac�vi�es and
which resultresults
which from from FAAN
FAAN projects or programs.
project or programs.
Activities Actionstaken
Actions taken
or or work
work performed
performed through
through whichwhich
inputsinputs
are are
mobilized to produce specific output or results.
mobilized to produce specific output or results.
Inputs Thefinancial,
financial, human
The human andand material
material resources
resources required
required to to
implement
implementthethe
project or program.
project or program.
1.2 What does Results-based management (RBM) mean for Federal Airports Authority of Nigeria?
• It expands the scope of performance management repor�ng along the results chain;
• Ensures that outcomes and Impact (overall Goal) are included in the plans to measure progress and performance,
• Shi�s emphasis towards the measurement of changes in the output (services created) and impact (access,
usage) of the services created in achieving FAAN mission and vision.
10
The main output of a FAAN logical approach to project design is the logical framework(logframe) matrix.
Goal The
Thehighest-level
positive andresult to which
negative, FAAN opera�
intended on (the project
and unintended or
long-term
program) is intended to contribute.
results produced by FAAN project or program.
“RESULTS”
Purpose
The improved situa�on that a project or program is expected to
The medium
contribute – cantly
signifi term results of FAAN’s
to is completed activities.and on �me.
successfully
Outputs
The
Theproducts
products,andactivities
ac�vi�es and
(services)
whichwhich results
results fromfrom
FAAN
FAAN project/
project program.
or programs.
Activities Actionstaken
taken
Actions or or work
work performed
performed through
through whichwhich
inputsinputs are
(resources) are mobilized to produce specific output.
mobilized to produce specific output or results.
Inputs Thefinancial,
The financial, human
human andand material
material resources
resources required
required to to
implement the project/program.
implement the project or program.
The logframe is a summary table, and usually accompanies the project’s or program’s design document.
See (Figure 1.3).
11
Figure 1.3: The logframe matrix
What the programme will do; How performance will be measured Factors outside Management control
what it seeks to achieve that may affect project performance
Logframe hierarchy Performance indicators Means of verification Assumptions & Risks
Goal (Impact) (Goal-to-Super-Goal)
Higher objec�ve to which this project Indicators (increasingly standardized) to The program evalua�on system Risks regarding strategic impact
or program, along with others, is measure program performance.
intended to contribute.
Outputs Output indicators that measure the People, events, processes, sources Output-to-Purpose)
project or program & services finally of data – supervision & monitoring
The actual deliverables. What the delivered by it. system for valida�ng the project’s Risks regarding design Effec�veness
project or program can be held design.
accountable for producing.
12
A repor�ng and feedback system that allows for �mely decision-making by management on monitoring findings;
iden�fy who is responsible for ensuring ac�onable interven�on; and an annual review mee�ng a�ended by key
stakeholders that will allow a par�cipatory annual assessment of performance and results obtained to date as well
as planning next year’s monitoring and evalua�on ac�vi�es for good results-based management.
Figure 1.4 sets out key ques�ons at each stage of the logframe to which performance management
repor�ng Officer should pay par�cular a�en�on. Managers and Management will need to be updated regularly
on the answers to the ques�ons in order that they can respond in a �mely and construc�ve manner to keep the
project or program on track towards achieving its objec�ves.
Monitoring ques�ons
Logframe The Results Chain
Inputs Are
Thefinance, personnel
financial, humanand and material resources required to
materials available on �me &
inimplement the�es
the right quan� project or program.
and quality ?
*CCM indicators measure changes in customer (PAX and airlines) behaviour resul�ng from delivery of a
project/program (output). They are important means of tracking progress.
13
1.5 What is the role of evaluation in performance management reporting?
Evalua�on on the other hand is the systema�c and objec�ve assessment of an on-going or completed project,
program or policy, its design, implementa�on and results. The aim is to determine the relevance and fulfillment of set
objec�ves, as well as efficiency, effec�veness, impact (overall Goal) and sustainability. An evalua�on should provide
informa�on that is credible and useful, enabling the incorpora�on of lessons into management decision-making.
Impact Sustainability
Goal •The
What changes did the • Are the
positive and negative, intended benefi
and ts likely tolong-term
unintended be
opera�on bring about? maintained for an extended
results produced by FAAN project or program.
• Were there any unplanned period a�er assistance ends?
or unintended changes?
“RESULTS”
Purpose
Eff ec�medium
The Relevance
veness – term results of FAAN’s activities.
• Were the opera�on’s • Were the opera�on’s objec�ves
objec�ves achieved? consistent with beneficiaries
• Did the outputs lead to needs and with FAAN’S Mission &Vision?
Outputs the intended outcomes?
The products, activities and which results from FAAN
project or programs.
Activities Actions
Effi ciencytaken or work performed through which inputs are
•mobilized
Were stocks of items available
to produce on �meor
specific output and in the right
results.
quan��es and supply?
• Were ac�vi�es implemented on schedule and within budget?
Inputs • Were inputs delivered economically?
The financial, human and material resources required to
implement the project or program.
Evalua�ons carried out by independent evaluators are undertaken only when there is a special
management need or if the evalua�on can inform the long-term strategy and policy needs of the FAAN.
14
1.7 Monitoring and Evaluation in Performance Management Reporting?
Thus, Monitoring and Evalua�on (M&E) are cri�cal component of PMR and is a sine qua non to the success
of any project/program. The body literature of the subject ma�er asserts that the thin line between success
and failure of any project is determined by the extent to which Monitoring and Evalua�on is carried out.
As a Planning responsibility, monitoring ac�vity provides the basic building blocks of decision-making, for
strategic planning, resource mobiliza�on and u�lisa�on. It is a key measurement ac�vity in our efforts at achieving
organiza�onal effec�veness, our vision and mission. If we cannot monitor, we cannot measure and if we cannot
measure, certainly we cannot improve. Monitoring gives informa�on on where a policy, program or project is at any
given �me (or over �me) rela�ve to respec�ve targets and outcomes. Monitoring focuses in par�cular on efficiency,
and the use of resources. A baseline study is usually conducted before the project or program begins. For performance
management repor�ng which is the key to results-based management to be meaningful, monitoring and evalua�on
must be objec�ve, transparent, con�nuous and most importantly its informa�on, should be readily available.
Monitoring and evalua�on systems must also be fully funded throughout the project’s or program’s lifecycle, since
lack of sustained funding is a major reason why monitoring and evalua�on fail.
In summary we undertake M&E because?
• Monitoring and Evalua�on is a key measurement ac�vity in our efforts at achieving a results-based
management in FAAN’s which is the key factor in the achievement of our Mission and Vision effec�vely
and efficiently.
• Monitoring and evalua�on enables the improved management of the outputs and outcomes to meet our
clients’ needs and so is sine qua non to results-based management.
• It encourages the alloca�on of effort and resource in the direc�on where it will have the greatest impact.
• It plays a crucial role in keeping projects on track, create the basis for reassessing priori�es and create an
evidence base for current and future projects through the systema�c collec�on and analysis of informa�on on
the implementa�on of a project.
• It provides the basic building blocks of decision-making, for strategic planning and resource mobiliza�on.
15
1.9 Performance reporting throughout the lifecycle of a project
Performance repor�ng should occur throughout a project’s lifecycle. A baseline study is usually conducted
before the opera�on begins. Evalua�on can occur for different purposes at different points, and should not cease
with the comple�on of the project. At the comple�on of the project, con�nuous evalua�on is necessary to ensure
adequate maintaince and that the project is really impac�ng on the client.
Baseline
Time
Duration of project
16
MODULE 2
Step 3. Iden�fy at this stage whether the Performance Management Repor�ng audience has specific
�melines by which it requires the report. This will be a major factor in deciding what you can and
cannot collect.
When framing your outcome-focused Performance Management Repor�ng ques�ons, keep them open-ended.
Eg. “To what extent did...”
17
2.2 Performance Management Reporting Questions
• Process
How well was the project designed and implemented (i.e. its quality)
• Outcome
To what extent did the project meet the overall needs?
Was there any significant change and to what extent was it a�ributable to the project?
How valuable are the outcomes to FAAN, other stakeholders, and par�cipants?
• Learnings
What worked and what did not?
What were unintended consequences?
What were emergent proper�es?
• Investment
Was the project cost effec�ve?
Was there another alterna�ve that may have represented a be�er investment?
• What next
Can the project be scaled up?
Can the project be replicated elsewhere?
Is the outcome self-sustaining or does it require con�nued interven�on?
• Theory of change
Does the project have a theory of change?
Is the theory of change reflected in the program logic?
How can the program logic inform the research ques�ons?
2. 3. Another way of classifying broad Performance Management Reporting
questions is presented below.
PMR ques�on
• Relevance
Does the project/program and contents meet the demand (needs) of the target group?
To what extent is the project/program goal in line with the vision and mission of FAAN?
• Efficiency
Did the engagement method used in this project lead to similar numbers of par�cipants as previous or other
programs at a comparable or lesser cost?
Have the more expensive engagement approaches led to be�er results than the less expensive engagement
approaches?
• Effec�veness
To what extent did the project/program lead to increased sa�sfac�on for the clients as stated?
To what extent did the engagement method encourage the target group to take part in the project?
• Outcome
To what extent has the project led to more sustainable and welcoming behaviours in the target group?
Were there any other unintended posi�ve or nega�ve outcomes from the project?
• Sustainability
To what extent has the project led to the long-term behaviour change?
18
Step 1. Iden�fy the Performance Management Repor�ng ques�ons
In order to answer PMR ques�ons, monitoring ques�ons must be developed that will inform what data will be
collected through the monitoring process. Monitoring ques�ons are quite specific in what they ask, compared to
evalua�on ques�ons. For example, for an evalua�on ques�on of “What worked and what did not?” you may have
several specific ques�ons such as “Did the workshops lead to increased knowledge on energy efficiency in the
office?” or “Did par�cipants imbibe safety efficient techniques”.
The monitoring ques�ons will ideally be answered through the collec�on of quan�ta�ve and qualita�ve data. It
is important to not leap straight into the collec�on of data, without thinking about the PMR ques�ons. Jumping
straight in may lead to collec�ng data that provides no useful informa�on, which is a waste of �me and money.
If you have developed a program logic (logframe), you can use this to start iden�fying relevant monitoring ques�ons
and indicators. Once you have iden�fied monitoring ques�on in your program logic (logframe), you can transfer
them into your PMR system.
Step 4. Identify who will evaluate the data, how it will be reported, and when
This step is op�onal but highly recommended, as it will round off the PMR plan as a complete document.
Remembering that evalua�on is the subjec�ve assessment of a project’s worth, it is important to iden�fy who
will be making this ‘subjec�ve assessment’. In most cases, it will be the project team, but in some cases, you
may involve other stakeholders including the target group or par�cipants. You may also consider outsourcing a
par�cular part of the evalua�on to an external or independent party.
For a PMR to be used (and therefore useful) it is important to present the findings in a format that is appropriate to the
audience. This may mean a short report, or a memo, or even a poster or newsle�er. As such, it is recommended that
you consider how you will present your PMR from the start, so that you can tailor the way to present your findings
to the presenta�on format (such as graphs, tables, text, images).
19
Step 5. Review the Performance Management Reporting plan
Once you have completed your PMR plan, highlight data sources that appear frequently. For example, you may be
able to develop surveys that fulfil the data collec�on requirements for many ques�ons.
Also consider re-ordering the PMR plan in several ways, for example, by data source, or by data collec�on
�meframe. Finally, go through this checklist. Does your PMR plan:
i. Focus on the key PMR ques�ons and the PMR audience?
ii. Capture all that you need to know in order to make a meaningful PM report of the project?
iii. Only asks relevant monitoring ques�ons and avoids the collec�on of unnecessary data?
iv. Know how data will be analysed, used and reported?
v. Work within your budget and other resources?
vi. Iden�fy the skills required to conduct the data collec�on and analysis?
vii Are your data and KPIs...specific, measurable, achievable, relevant, and �me-based ? (SMART)
NOTE. It is advisable that at least one of the following three performance management repor�ng
exercises should be undertaken during the lifecycle of a project:
__ self-evalua�ons - undertaken by project or program managers and implementa�on staff;
__ non-mandatory evalua�ons - undertaken by independent consultants and managed by FAAN management;
__ mandatory independent evalua�ons - undertaken by FAAN Performance Management Repor�ng team and
managed by FAAN Planning Department.
Step 6. Importance of a literature review.
A literature review is a desktop-based research of previous projects and other ini�a�ves that can inform and
support the need for a project, as well as provide a founda�on for the work to be undertaken. The review should
iden�fy whether similar work has been done, what works, and what doesn’t, so that you do not have to re-invent
the wheel. The review should ideally have recommenda�ons to inform the need for a project and the project
design.
It is important to make sure that the literature review does not just describe similar works, but evaluates them in
rela�on to the intended project. It must therefore involve a cri�cal review of works in rela�on to your intended
project. Literature reviews also help in se�ng baseline data for the new project.
20
Table 2.1: Steps in the design of a Performance Management Reporting System for FAAN
STEP TO-DO-LIST
Check the project’s or Review and revise (and if necessary, prepare) a logical framework.
programs’s design Ensure that objec�ves for Goal (impact), Purpose (outcome), Outputs, Ac�vi�es and Inputs assump�ons
are clearly stated and measurable.
Ensure that indicators are adequately specified with quan�ty, quality and �me.
Assess capacity for Iden�fy what human and financial resources are available for PMR
performance Managerment Assess training requirements for all monitoring staff.
Repor�ng
Specify training requirements.
Plan for data collec�on and Check exis�ng informa�on sources for reliability and accuracy, to determine
analysis what data is already available?
Decide what addi�onal informa�on should be collected, for baseline purposes,
for monitoring and for evalua�on.
Set a �meframe and schedule for data collec�on and processing, and agree on
responsibili�es.
Prepare the performance Summarize agreed informa�on needs, data collec�on, informa�on use, repor�ng
Management Repor�ng and presenta�on in a monitoring and evalua�on plan.
plan and budget
Summarize capacity building and support requirements.
Cost all monitoring and evalua�on ac�vi�es, and iden�fy funding sources.
Plan for repor�ng and Design the repor�ng system, specifying formats for reports.
feedback Devise a system of feedback and decision-taking for management.
21
Figure 2.1: Components of the PMR plan, and their linkage to the logframe
PROJECT PLANNING TOOLS
LOGFAME
Ac�vity 2
REPORTING
• Agreed flow and format for reports, linked to
Ac�vity 3 management levels
• Agreed system for feedback and management review
etc.
22
Table 2.2: The logframe matrix
23
2.5 Best Practice ‘Do’s’ for Key Performance Indicators and Means of Verification
Indicators
Means of Verifica�on
• Too many indicators are selected – Managers have a tendency to ask for too much informa�on, assuming that
the more they know the be�er they will be prepared. However, the result is o�en informa�on-overload.Instead,
informa�on needs must be related directly to decision-making roles and to levels of management – more detail
is required by field level managers, while aggregated and summarized data is used at higher levels.
• Selec�on of indicators should reflect this through the specifica�on of a minimum set of informa�on. The trap of
including too many indicators should be avoided, as this will add to the work and cost of collec�ng,recording and
analyzing the data.
• Don’t select overly complex indicators – Some indicators present major problems for data collec�on, either in
terms of the skills or the resources required.
• Informa�on about outcomes is also required. Client contact monitoring (CCM) provides a means of tracking the
likelihood of achieving outcomes and impact.
Client Contact Monitoring (CCM) is defined as a systema�c inves�ga�on to monitor FAAN’s clients: Passengers,
Airlines, Tourists, Tenants, etc) percep�ons of a newly introduced or monitored project/program. CCM aims to
obtain informa�on about the client’s reac�on to the outputs of a project/program, and is intended to provide
managers with an indica�on of progress towards achievement of the project’s purpose.
CCM Indicators should be to provide an effec�ve means of valida�ng whether the output strategy is working or
not, for it is no longer service delivery but service u�liza�on. It should therefore include informa�on about client
access to, use of, and sa�sfac�on with project/program outputs. Monitors should seek feedback directly from
the clients, (men, women and children).
CCM indicators should be included in the logframe at Purpose level.
24
Figure 2.2: Client Contact Monitoring (CCM) and the Logframe
Results Performance Means of Assump�ons
Hierarchy Indicators Verifica�on and Risks
Goal
Purpose
The benefits
derived by the
beneficiaries
Transition from service
delivery to benefit Customer Contact Monitoring indicators
Outputs
The service provided
by the opera�on
Ac�vi�es
The data collec�on task can be split into two sets of requirements:
1. Baseline data to gain informa�on on clients and the local context (what was) prior to the start of the main
project/program ac�vi�es
2. Ongoing data for monitoring of progress during implementa�on
Both sets of data are subsequently used for monitoring and evalua�on. Special case studies and surveys can be
undertaken to update baseline informa�on and to understand the reasons for changes that have occurred.
2.9 Why do you need baseline data?
Monitoring and evalua�on to a large extent use the same indicators and data sets with evalua�on. Evalua�on is
rendered difficult if the relevant baseline and monitoring data are not available.
More substan�ve informa�on about how the project/program has changed clients’ behavior and patronage are
required for evalua�on, and so evalua�on considera�ons must be explicitly addressed during system design. The
main mechanisms for this are:
Arrangements for baseline data collec�on – what was the situa�on before the project/program commenced; and
in the case where comparison groups are included in a baseline study, how did the situa�on within the scope of
the project/program compare with that outside?
Arrangements for a follow-up study – what difference has the opera�on made:
i) since start-up; and in comparison with groups outside the scope of the opera�on?
The techniques used to collect baseline data are no different from those used in other exercises such as reviews,
assessments and evalua�ons. The difference lies in the purpose of the exercise. Baseline studies provide the
necessary informa�on to complete the planning of the project/program, through benchmarking of indicators and
analysis of context. They are also the basis of sound monitoring and evalua�on, providing a snapshot of the
condi�ons prior to start-up. Baseline data facilitates measurement of the outcomes and impact of a project/program.
Without baseline data, it is diffcult to determine what difference the project has made.
25
MODULE 3
3.0 Some key points to keep in mind when planning the collection of baseline information:
• The collec�on of baseline data should be �med to be undertaken prior to the start of a project/program or next
phase;
• Baseline and follow-up studies should be included in your M&E plan as key components, and therefore should
be appropriately budgeted for and resourced; and
• The results of a baseline study should be analyzed and presented in a format that is succinct and clear, and most
importantly, that can be easily understood by programming staff, project managers or repor�ng delegates and
evaluators.
3.1 What monitoring data are required and where will it come from?
Ongoing data requirements for monitoring can be summarized within the logframe structure as table 2.4 below.
a. Input monitoring
Tradi�onal informa�on systems are o�en geared to sa�sfying the administra�ve requirement that funds and
resources are adequately accounted for, and that work has been accomplished as planned. But perhaps the most
common weakness in physical and financial monitoring is that devia�ons from the plan may not be traceable to
responsibility centers, or that the reason for the devia�on is not clear. If, for example, an airport data for rest room
cleanliness indicates that there has been an interrup�on to the distribu�on of supplies, it is important that this
informa�on is accompanied by iden�fica�on of who is responsible and why the problem has occurred.
26
b. Field visits – a valuable source of informa�on
Field visits are an essen�al monitoring tool for Federal Airports Authority of Nigeria (FAAN) providing the necessary
close contact with clients.
Field visits can serve a number of interlinked purposes:
• To gauge progress towards achieving the project’s objec�ves
• To determine clients’ percep�ons and reac�ons to ac�vi�es
• To assess u�liza�on of assets created, and to iden�fy any nega�ve effects
• To assess the quan�ty and quality of work undertaken, and the appropriateness of other ac�vi�es
• To make physical checks of projects/programs and services op�miza�on and efficiency.
• To help management iden�fy problems and make decisions to overcome them early enough
• To establish symbio�c rela�onships with clients, and implemen�ng partners
• To ensure that clients opinions are fully considered in implementa�on plan as captured in the
project/program design.
3.2 Who undertakes data collection and analysis at the field level?
It is essen�al that duplica�on of monitoring be avoided, that informa�on gaps are iden�fied, and that resources
for monitoring are used efficiently. The M&E Plan will help to clarify who will collect what, and why. It will also
provide a framework for agreeing on responsibili�es for the scaling up of the monitoring effort.
Cons�tute mixed teams – Need to include a staff whose project or program is being monitored – to take advantage
of the different perspec�ves of various individuals on the project.
Develop a team approach, with frequent team mee�ngs to promote integra�on and shared Percep�ons
3.3 Qualities and skills required of those monitoring projects
They must:
• Have an understanding of FAAN’s mandate: mission and vision.
• Have good analy�cal and repor�ng skills
• Have skills in qualita�ve and quan�ta�ve data collec�on techniques
• Have knowledge on input and output monitoring, and inventory control.
• Be honest, observant, percep�ve, inquisi�ve, persistent, and diploma�c
• Be sensi�ve listeners who also have the ability to influence and convince people through
discussion
• Be Energe�c, willing to travel and spend the majority of their �me in the field
• Capable of reviewing problems with officials on-the-spot
• Be team players
• Be able to determine and focus on what is important.
3.4 Planning for Reporting and Feedback
Guidance for monitoring and evalua�on report wri�ng:
1. Be as short as possible, consistent with the amount of informa�on to be presented.
2. Focus on results being achieved as defined in the logframe or defined in the objec�ves, and link the use of
resources allocated to their delivery and use.
3. Be clear on who your audience is and ensure that the informa�on is meaningful and useful to the intended
reader.
4. Write in plain language that can be understood by the target audience.
5. Ensure �mely submission of progress reports. Even if incomplete in certain aspects or component coverage, it is
be�er to circulate key results in other areas rather than wait for the complete picture
6. Provide a brief summary (1 page) at the beginning.
7. Be consistent in your use of terminology, defini�ons and descrip�ons of partners, ac�vi�es and places.
8. Present complex data with the help of figures, summary tables, maps, photographs, and graphs.
9. Only highlight the most significant key points or words (using bold, italics or other stresses).
27
10. Include references for sources and authori�es.
11. Include a table of contents for reports over 5 pages in length.
3.5 How would project/program managers use reports?
A baseline study report provides the necessary informa�on to ‘benchmark’ indicators for the project’s Purpose
and Goal, providing a snapshot of the situa�on before the opera�on commences or at least in its early stages. The
follow-up study then provides a picture of how the situa�on has changed. The baseline study also provides useful
informa�on for planning purposes.
If the study is conducted before implementa�on starts, baseline informa�on can help to fine-tune the project’s
design. If the study is conducted during the early stages of implementa�on, then it can provide useful informa�on
to validate the design, or to iden�fy necessary modifica�ons.
Timely progress repor�ng will inform whether or not the project is on track regarding the delivery of outputs
and outcomes, and thereby permit management to focus its energy on the most cri�cal bo�lenecks. Moreover,
progress reports at quarterly and six monthly intervals should:
i Be results-oriented (provide updates on outputs achieved, and include CCM informa�on)
ii. Be ac�on focused
iii. Allow management to review what has been done in the last repor�ng period as compared to the plans, and
iv. Permit management to decide on what needs to be done in the next period.
Self-evalua�on reports should:
i. Be results-oriented (provide an assessment of actual output and outcomes achieved)
ii. Permit the prepara�on of new or follow-up projects/programs in a way that incorporates the experiences of
the exis�ng project/program.
iii Provide a close-out analy�cal report for those projects/programs that are being terminated.
3.6 Preparing the Performance Management Reporting Plan and Budget
Below is a matrix for developing the PMR plan.
28
i. for items the projected quan��es and cost of each commodity
ii. for human resources, the projected staff �me and cost etc.
c. Data source – the primary or secondary data source that will provide informa�on about each indicator
– e.g. exis�ng sta�s�cs or records; project accounts; nutri�on survey; etc.
d. Frequency of collec�on and cost– how o�en primary data will be collected, or secondary data analysed
(e.g. quarterly, annually, at end of phase, etc.), and the budget required.
e. Responsibility for collec�on – which organisa�on or unit will be responsible for collec�ng and/or analysing the
data.
f. Collec�on Method – how the data is being collected (e.g. focus group mee�ngs).
g. Repor�ng – in which report(s) the informa�on will be included.
h. Presenta�on – at which fora or mee�ngs the informa�on or report will be presented and discussed.
29
i. The first step is to acknowledge receipt of progress report and provide comments regarding report conclusions,
recommenda�ons and �meliness.
In addi�on, the PMR plan should programme more formal feedback opportuni�es such as:
i. Quarterly progress review mee�ngs – Reviews output progress (planned versus actual)
ii. CCM findings and early evidence of outcome and acts on improvement proposals
iii. Evalua�on debriefing workshop – Conducted at the end of the field mission stage of the evalua�on, where
ini�al evalua�on findings are presented and discussed in order that stakeholder feedback can be incorporated
into the final report.
At the end of the review, the Na�onal Monitoring and Evalua�on Department of the Ministry of Finance, Budget
and Na�onal Planning come up with a measurement framework – the MDA Performance Scorecard.
THE MINISTRY, DEPARTMENT AND AGENCY PERFORMANCE SCORECARD TEMPLATE
The MDA Template is an innova�ve tool specifically designed to assess service delivery from the MDAs.
It provides a structure that allows stakeholders to quickly tell how an MDA is performing and what needs
a�en�on and a top-level “dashboard” that gives a broad picture of the MDA performance on its “Mandate”. The
Scorecard in addi�on provide focus to the MDAs on key results areas they need to address, the outcome and
outputs to deliver to the stakeholders. Its aligns the day-to-day work that everyone is doing within the MDA
priori�ze projects, products and services to be delivered. The MDA scorecard template is as shown below:
MDA SCORECARD TEMPLATE (Sec�on A Signatories)
Name of Ministry
Name of Honourable Minister
Honourable Minister’s Signature Date:
Permanent Secretary’s Name
Permanent Secretary’s Signature Date:
30
MODULE 4
4.1 One key success factor in making an airport reliable and efficient is performance
measurement. Measuring anything is comparing it to an agreed standard. Without knowing the
current performance of the airport, it will be difficult to discern which performance area or areas that
could be improved upon. For this purpose, Key Performance Indicators (KPI) are readily used. KPI’s
are a set of simple measures or pointers that give indications on the current and future performance
of a project or program. Or put in a simpler form, a KPI is a type of performance measurement that
helps you understand how your organization or department is performing. A good KPI should act as
a compass, helping you and your team understand whether you’re taking the right path toward your
strategic goals.
They could be quantitative or qualitative. They are used as benchmarks and then monitoring
progress. They do not provide a detailed analysis, or directly suggest how to improve the airport, but
can be used as pointers, showing where more work has to be performed. To be effective, a KPI must:
31
Table 4.1a shows a typical KPIs for the five Key Performance Ac�vity areas in an airport, while table
4.1b shows the specific KPIs for a par�cular program or project within the five KPAs
32
ACTIVITY AREA KPIs
Airport Opera�ons Arrival inbound efficiency: This indicator measures the arrival delay at the
airport a�er removing ATFM regula�ons (e.g. ground holding), and if possible
inbound flight delay, from the measurement. Thus, it shows if the airport is
able to deal with the incoming flights without causing delays.
Departure outbound efficiency: This indicator measures the pre-departure
delays at the airport, a�er the possible removal of delays not caused at/by
the airport. It indicates whether the airport is able to process the flights in a
�mely manner.
Turnaround �mes in the apron/gate area: This indicator measures the
average turnaround �mes (the �me required for ac�vi�es from landing un�l
the aircra� can take off again) in the apron/gate area. It can be appropriately
used in benchmarks, and when studying how the airport develops over �me.
Airport Economy Income per passenger: This indicator shows the total (annual) income for
the airport divided by the (annual) number of passengers (sum of depar�ng,
arriving and transferring). It is used for analyzing how well the passenger flow
can be u�lized.
Traffic income per passenger: This indicator shows the total income per
passenger for aeronau�cal ac�vity (landing fees, etc). Together with the
total income indicator, these two can also be used to analyze the ability of
the airport in obtaining income from non-aeronau�cal ac�vi�es such as car
parking, space leasing, etc.
Airport Environmental Issues Energy consump�on: This indicator shows the airport’s (annual) energy
consump�on in kWh/m2, and could be for benchmarks and comparison with
historical data.
Number of contamina�on events: A contamina�on event might e.g. be when
an airport has a leakage of de-icing fluid or fuel into a noncontrolled area. This
indicator should of course be minimized.
Airport Safety and Security Number of incidents at security checkpoints: For this indicator, it is not
immediately evident that a low number is good, since it might be due to
inefficiencies in the security process. For high numbers, the cause and possible
remedies should always be considered.
Number of aircra� safety incidents: A safety incident might be traced to
another actor, e.g. the airline in case of an emergency landing, or to the
airport, e.g. if a ground vehicle drives into the movement area without
approval from the tower.
Airport Customer Service Check-in wai�ng and processing �mes: This indicator measures the �me that
the passengers spend checking in, and is an important parameter for the Level
Of Service at the airport, together with e.g. available space for each passenger
in different parts of the terminal.
Security control wai�ng and processing �mes: Wai�ng and processing �mes
are known to directly affect the passenger sa�sfac�on, especially in a nega�ve
way when they become too long. Therefor it is important to monitor these
and make sure that they are acceptable.
33
4.2 ASSUMPTIONS TO ACHIEVING A SUCCESSFUL PROJECT OR PROGRAM IN FAAN
What are the key assump�ons that would enable the achievement of your outcome (target)?
These are all the necessary condi�ons that must hold before the outcome (target) could be achieved. They are
also factor that could limit the achievement of the targets. Ensure that all are listed.
2. Translate each of the stated assump�ons to output language. See examples below.
NB: The outputs are the projects
Sector Objec�ve: To provide easy facilita�on in baggage check-ins and check-outs
Sector Objec�ve:
To provide easy facilita�on in baggage check-ins and check-outs
(Provision of carrousels) Reduc�on in number of damaged bags
34
VARIOUS AIRPORT STRATEGIC INITIATIVES (OUTPUTS) AND GOALS (IMPACTS) WITH THEIR KEY
PERFORMANCE INDICATORS
Approach Ligh�ng Enhance visibility Safety in day and night Provision of DES
System and night landing landing adequate
ligh�ng system, No
incidence/
accidents in
landing
and take-off in
1000 opera�ons
Taxiway Provide free access Promo�on of Safety in air- To prevent aircra� DES
of the aircra�s cra� accessibility collision
from the runways
to the apron or
service hanger
Apron To improve smooth Promo�on of safety. Deconges�on and DES
parking of aircra�. Decrease conges�on easy access to the
taxiway by other
aircra�.
35
Building, renova�on To make for Passengers comfort To provide quality customer DES, DAO
or maintain airport passengers’ comfort
terminals facilita�on, ease
and comfort
Perimeter fencing To Promo�on of Reduc�on in the� and DES
prevent incursion safety of airport preven�on of unauthorized
and unauthorized facility and passengers, persons into the restricted
persons into the preven�on of areas
runway. animal incursion
Baggage carousel Easy facilita�on Minimizes �me Reduc�on in number of DES
of baggage to wastage in complaints by passenger
passengers at reclaiming
baggage reclaim baggage.
point.
Jet bridge Enhance smooth Protec�on of Reduc�on in DES
access to aircra� passengers from passenger
harsh weather. facilita�on �me in and out of
the aircra�
Building/ To provide Enhance passenger Number of DES
renova�on of enabling working facilita�on and ease passengers processed and
Administra�on environment for of doing business number of office spaces for
Blocks stakeholders airport stakeholders
Building/ To ensure Promo�on of fire Number of fire DES
renova�on, and effec�ve safety, preven�on incidence and �mely
Comple�on of opera�onal of fire incidence and stoppage of fire incidence
ARFFS Watch Tower performance of effec�ve control of
project fire figh�ng team fire outbreak
Building/ To enhance work Ensuring a healthy Reduc�on in DES
Rehabilita�on of performance of workforce number of work-related
Avia�on Clinics staff, provision of incidences,
personal effec�ve use of personal
protec�ve protec�ve equipment (PPE)
equipment (PPE)
36
Security Clearance To Ensure safe and Reduction in the DSS
enhance passenger secure passenger trafficking of illicit items
facilitation clearance and dangerous goods
Flight Information Provide adequate Availability of Reduction in the number DES
Display/ Signage and timely timely information of passengers that missed
information to their flights, easy
passengers ccessibility within the
terminal building
Washrooms Provide standard, To ensure Number of clean DES/ DAO
clean and adequate passenger comfort washroom available
washrooms for
passengers
Airport Access To ensure passenger To ensure Reduction in the number DES
Road route accessibility passenger timely of passengers that missed
and reduction in and easy access to their flights
traffic congestion the airport
Car Parking To ensure that Safe parking slots Increase in the number of DES
passengers have revenue sgenerated from
adequate car car park
parking facility
ADDITIONAL KEY PERFORMANCE INDICATORS
GOAL 1: TO PROVIDE SAFE AND SECURE AIRPORTS
Objec�ve: To Improve Access Roads To The Airports
37
Objec�ve: To Improve Security At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Create Double Layered Number of Double Layer Security Points Created and manned
Security Screening Before the
Entrance of the Terminal Building
2 Introduc�on Of K-9 Sniffer Dogs Presence Of K-9 Sniffer Dogs
3 Provide CCTVS Cameras in Percentage of CCTV Coverage on
And Around the Airports the Landside, Airside and Terminal Building
4 Implement Availability of SOPs and its implementa�on
Standard Opera�ng Procedures
for Agencies in the Airport
5 Implement Passenger Enlightenment Number of Enlightenment Campaigns/
Programs Materials an implemented
6 Ensure Compliance mechanism Records keeping and Timeliness of Report
7 Conduct Periodic Airport Number of Vulnerability Studies Carried Out in a year
Vulnerability Studies
8 Provide Patrol Vehicles Number of Patrol Vehicles Provided Per Airport
9 Provide Communica�on Equipment Quality of communica�on Equipment Provided Per Airport
10 Ensure Synergy Among the Recording commitment to the Standard
Various Security Officials by Opera�ng Procedure by Each Agency
Clearly Defining Roles
12 Ensure Periodic Training and Refresher Number of Basic Level Training Courses
Course for Appropriate Personnel Carried Out Per Airport Per Year
13 Ensure That Airport Managers Are Number of Airport Managers Trained on
Involved in Security Training Security Awareness Per Year
14 Ensure Perimeter Fences are in secured Number of Perimeter Fences secured
15 Provide adequate Security Equipment Number of Security Equipment Provided Per Airport
16 Develop an Integrated Land Use Plan Number of Airports with Land Use Plans
and Ensure its strict Execu�on and Records of strict Compliance
Objec�ve: To Have Safe And Secure Runways At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Seal All Cracks and Expansion Joints Percentage/Number of Cracks and Expansion Sealed
2 Effect Repairs on all Pavement Failures Number of Repairs Effected and Reports Made
3 Re-Mark Runway when necessary Number of Times Runway is Re-Marked
4 Provide Adequate Airfield Lights Percentage/Number of func�oning Airfield Lights
5 Derubberize when necessary Number of Times Runway is derubberised Per 500 Landing
6 Ensure Grass and Shrubs are Number of Times Grass and Shrubs are cut to ensure safety
Cut at Least Twice A Month
7 Ensure proper Drainage system Evidence of proper Drainages in place
38
Objec�ve: To Establish and Maintain A Well- Equipped Fire Cover For All Airports
S/N STRATEGIC INITIATIVE KPI
1 Provide Appropriate Fire Equipment Number of appropriate Fire Equipment Accessories Provided
and Accessories to All Airports
Objec�ve #5: To Have Func�onal and Safe Taxi-Ways At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Install Appropriate Signage Number of Signage Installed and Illuminated
and Illumina�on
2 Ensure Taxiway is in order. Re-marking, resurfacing re-filling of potholes on Taxiway
3 Seal all Cracks and Percentage of Cracks and Expansion Joints Sealed
Expansion Joints
4 Effect Repair on Percentage of Repairs Done on Pavement Failure
All Pavement Failures
5 Proper Reposi�on of all Obscured Signs iden�fied and Reposi�oned
obscured Signages
39
Objec�ve: To Have Efficient Customer Service Delivery At Airline Desks
S/N STRATEGIC INITIATIVE KPI
1 Provide Adequate and self-service Number of designated Check-in Counters for Business
Check in Counters Class, Economy, People with Special Needs Provided
2 Provide Flight Informa�on Number of Flight Informa�on Display Board
Display System in The Airports
3 Conduct Customer Service Training Number of Customer Service Training Carried Out Per Year
4 Availability of serviceable Number of available serviceable Conveyor Belts
Conveyor Belts
5 Counters Efficiency Reduc�on in Check-In Time/Queue
6 Provide Facilita�on Equipment Number of Facilita�on Equipment
Objec�ve: To Improve Efficiency At Screening Points
S/N STRATEGIC INITIATIVE KPI
1 Adequately trained Staff at Screen- Number of Staff trained and deployed at Screening Points.
ing Point
2 Conduct Customer Service Training Number of Customer Service Trained and deployed
3 Implement Customer Service Pro- Number of Customer Service Procedures developed
cedures
4 Provide Adequate Screening Equip- Number of Facilita�on Equipment Provided Per Airport
ment
5 Ensure Adequate Power Supply Number of Alterna�ve Sources Provided
6 Ensure A Maintenance Schedule for Number of scheduled Maintenance Ac�vi�es Carried out
Screening Equipment
7 Ensure adequate Spare Parts for Number of screening machines spare parts available in store
Screening Machines
8 Strict Observance of Screening Records showing observance of Screening Codes
Codes
9 Ensure Efficient Supervision and Records of supervising ac�vi�es recorded in Rou�ne Roster
Monitoring
10 Mo�va�on/Reward Staff Records showing mo�vated Staff and parameter used
11 Submission and Analysis of Daily Number of Daily Screening Reports submi�ed per week
Screening Reports
40
Objec�ve: To Have Func�onal Informa�on Service Delivery
S/N STRATEGIC INITIATIVE KPI
1 Create Conspicuous Informa�on Number of Visible Informa�on Desks with Signage Available
Desks with Signage
3 Train, Deploy and Monitor Adequate Number of Staff Trained and Deployed Per Airport
Staff
4 Implement a Service Delivery Availability of Service Delivery Standard protocols
Standard in all Airports
5 Provide Wi-Fi Services Availability of working Wi-Fi Service at the Airport
6 Provide Informa�on Display System Number of Informa�on Display System and Signage Provided
and Signage
7 Conduct Voice and Speech Training Number of Staff Trained On Voice And Speech Per Airport
for Staff
8 Provide Modern Equipment Availability of Modern Equipment at the Airport
9 Ensure adequate channels of An- Number of channels of Communica�on to Passengers in All Air-
nouncement and Communica�on to ports
Passengers
10 Provide Passenger Informa�on Number of Digital Screen Provided for Passenger Informa�on
Service on Digital Screen
41
Objec�ve: To Have Efficient Handling Services At The Airport
S/N STRATEGIC INITIATIVE KPI
1 Ensure the Provision of Adequate Availability/Number of Ground Handling Equipment
Ground Handling Equipment
2 Provision of Serviceable Ground Number of Serviceable Ground Power Equipment in the Airport
Power Equipment
3 Ensure Cooling System in Aircra� are Monitoring and Recording checks on Cooling System
Func�onal while Boarding Func�onality of Aircra� while Boarding
4 Train and Educate Handlers Frequency/Number of training for Handlers
5 Ins�tute Reward Mechanism Number of Staff Rewarded and the parameter for the reward
Objec�ve: To Have Efficient Cargo Opera�on At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Billing according to Consolidated Recording of Consolidated Cargo Weight of Aircra�
Cargo Weight of Aircra�
2 Liberalize cargo opera�ons and En- Market Liberalized and Number of New Entrants
courage New Entrants
Objec�ve: To Provide And Sustain Constant Water Supply For All Airports
S/N STRATEGIC INITIATIVE KPI
1 Ensure Uninterrupted Clean Water Number of Airports with Uninterrupted Water Supply
Supply to the Airports
GOAL 3: TO TRANSFORM THE AIRPORT INTO VIABLE, COMMERCIAL AND TOURIST CENTRES
42
Objec�ve: To Reorganise Airport Taxi Opera�ons
S/N STRATEGIC INITIATIVE KPI
1 Standardize all Airport Taxi protocols Airport Taxi Opera�on Standardize and Documented
for opera�ons
2 Ensure strict Compliance to Protocols Reward for Compliance
Established
3 Establish means of iden�fying online Crea�on of Parks for Online Taxi Operators at the Airport
Taxi Operators
Objec�ve: To Improve Retail Shop Service
S/N STRATEGIC INITIATIVE KPI
1 Design and Implement Effec�ve Re- Percentage of Retail Shops Adhering To Retail Mapping Scheme
tail Mapping System
2 Review and Set Appropriate Price Percentage of Profit Per Item Against Market Price
Ceiling/Cap
3 Service Delivery Standard Protocols Availability of Service protocols to ensure op�mum service deliv-
Across Airports ery in the Airport
Objec�ve: To Establish World Class Duty Free Shops
S/N STRATEGIC INITIATIVE KPI
1 Design and Implement Effec�ve Re- Percentage of Duty-Free Shops Adhering to Global Airport Retail
tail Mapping System Standards
2 Implement and Monitor Service Number of Inspec�ons Carried Out to Enforce The Designed Deliv-
Delivery Standards Across All Inter- ery Standards
na�onal Airports
Objec�ve: To Have A Func�onal Mul�-Modal Transport System At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Implement an Integrated Availability/ level of Implementa�on of Mul�-Modal Transport
Mul�-Modal Transport Network at Network Design at the Airports
the Airports
Objec�ve: To Improve Revenue Collec�on At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Design and Implement A Fool-Proof Availability of a fool-proof Airport Wide-Revenue Collec�on
Airport Wide Revenue Collec�on system
System
2 Develop New Non-Aeronau�cal Rev- Number of newly developed Non-Aeronau�cal Revenue Base in
enue Sources a year
44
Objec�ve: To Have Standardised Lounge Services At The Airports
S/N STRATEGIC INITIATIVE KPI
1 Provide Appropriate Furnishing in Availability of good Furnishing
the Lounges
2 Ensure the Provision of Food and Availability of Food and Beverages at Protocol Lounges
Beverages at Protocol Lounges
45
Daily Fixed Asset Produc�vity
• Terminal Area (square meter) per passenger
• Total Airport Site Area (square meter) per passenger
• Movements per gate
• Movements per runway
• Passengers per gate
• Passengers per check-in desk
• Passengers per car parking space
Airport opera�ons
• Passengers per movement
• Passengers as a % of WLU
• Cargo as a % of WLU
• Average number of Runways
• Average Terminal Area (sq. meters)
• Average Airport Site Area (hectares)
• Average number of Gates
• Average number Check-In Desks
Addi�onal KPIs
Distribu�on of Airport Income
• Aeronau�cal income as a propor�on of total income (%)
• Non-Aeronau�cal Income as a propor�on of total income (%)
• Non-Opera�ng income as a propor�on of total income (%)
Distribu�on of Opera�ng Expenses
• Personnel Expenses as a propor�on of total opera�ng expenses (%)
• Contracted Services as a propor�on of total opera�ng expenses (%)
• Materials, Equipment, Supplies as a propor�on of total opera�ng expenses (%)
• Communica�ons, u�li�es, Energy & Waste as a propor�on of total opera�ng expenses (%)
• Maintenance (excluding contracted services) as a propor�on of total expenses (%)
• General and Administra�ve Expenses as a propor�on of total opera�ng expenses (%)
• Personnel Expenses as a propor�on of total opera�ng expenses (%)
Opera�ng Expenses vs. Capital Cost
• Opera�ng Expenses as a propor�on of total costs (%)
• Capital expenses as a propor�on of total costs (%)
Interest vs. Deprecia�on
• Interest Expenses as a propor�on of total cost (%)
• Deprecia�on as a propor�on of capital costs (%)
46
Please note that the measurements of the KPIs are gauged according to ICAO’S standards. Any devia�on no�ced
in this handbook shall to its inconsistency with ICAO’S standard be null and void.
47
MODULE 5
The Wildlife Risk Assessment forms the basis for developing a Wildlife Risk Management Plan. Birds are a�racted
to an airport for at least one of three reasons: food, water, and shelter. Thus, the founda�on of a Wildlife Risk
Management Plan for any airport should be the implementa�on of programs to minimize food, water and shelter
that are a�rac�ng birds posing the greatest risk. These habitat management ac�vi�es may involve removal of
trees used as perching and roos�ng sites by raptors and starlings or plan�ng varie�es of grass, such as endophy�c
fescues, that are unpalatable to grazing birds such as geese. To discourage gulls and other scavengers, garbage
dumps should be prohibited within 5 km of airports, and food waste on the airport should be stored in covered
containers at all �mes. Water is a magnet for many bird species. Covering storm-water detainment basins and
improving drainage to eliminate standing water will help discourage ducks, geese and other water birds that pose
a high risk to aircra�. If habitats and food that are a�rac�ve to high-risk bird species are not minimized or eliminat-
ed, then ac�ve control efforts (discussed below) will provide only temporary relief at best.
The second component of the Wildlife Risk Management Plan should cover the use of techniques to disperse
or remove hazardous wildlife that intrude on the airport. There are a variety of techniques that can be used to
disperse birds: pyrotechnics fired from hand-held launchers, recorded bird-distress calls that were broadcast from
vehicle-mounted speakers, trained falcons and dogs, bird-frightening lasers, chemical repellents, and
dead-bird effigies to name a few. Removal of birds by shotgun, air rifle or trap is also a cri�cal component of risk
management on many airports. Flocking birds such as gulls and geese will o�en habituate to con�nued
harassment from non-lethal frightening techniques such as described above. Selec�ve removal of a few birds by
shotgun will reduce habitua�on by surviving members of the flock. Air rifles or traps can be used to remove
pigeons from hangers and other buildings. Because most birds are protected by na�onal laws, permits are
usually needed before undertaking lethal op�ons.
A mistake by many airport managers is focusing too much on the equipment and techniques (tools) needed to
manage birds on an airport and not on the personnel that are going to use those tools. There are no devices
or techniques that will, in and of themselves, solve the bird problem on an airport. The various tools described above
are important. But the most cri�cal component of a Bird Risk Management Plan is competent, trained and mo�vated
personnel who know how to use those tools. These personnel must be knowledgeable in the iden�fica�on, legal
status, risk-level, and behavior of the various bird species and be skilled in deploying the various techniques in an
integrated fashion. Managing birds and other wildlife on an airport is a complex endeavor that is part science and
part art. It involves numerous bird species exhibi�ng a range of behaviors, flight pa�erns, and adaptabili�es. For
one example, skilled deployment of pyrotechnics may be effec�ve in dispersing a flock of geese or gulls away from
the airport in some situa�ons but not in others. Pyrotechnics may be totally ineffec�ve in dispersing species such
as shorebirds, buzzards or vultures.
5.4.3 ESTABLISHMENT OF AN AIRPORT BIRD RISK WORKING GROUP OR TASK FORCE
This is another important component of the Bird Risk Management Plan. They monitor and coordinate bird-control
ac�vi�es at the airport. This group should include representa�ves not only from various airport departments but
also from the local government and key landowners immediately outside the airport whose ac�vi�es may influ-
ence bird numbers in the airport environment. For example, wildlife refuges, city parks, waste-management
49
facili�es, and golf courses located within 5 km of an airport may serve as focal points for birds that fly across the
airport or approach and departure paths. Educa�ng these neighbors about the risks of bird strikes may help in
implemen�ng programs to prohibit certain land uses near the airport or to minimize bird ac�vity at the sites.
5.4.4 PILOTS AND AIR CARRIERS CAN HELP
Although the management of bird risks is primarily an airport’s responsibility, there are ac�ons that can be
taken by pilots and air carriers in partnership with airports to reduce damaging strikes. Pilots have a unique
“bird’s eye view” of an airport and can some�mes see bird and other wildlife ac�vity not readily apparent to
airport personnel. Thus, bird and other wildlife hazards observed at airports should be reported to ATC tower or
airport opera�ons. Likewise, when a bird strike does occur, pilots and the air carrier should endeavor to report the
strike to the airport and Civil Avia�on Authority. The iden�fica�on of the species of bird involved in the strike is
cri�cal. Thus, remains of the bird should be frozen or otherwise preserved for iden�fica�on by a local expert. A�er
all, an airport cannot solve a bird problem of which it is not fully aware or does not understand. Documenta�on
of the problem also is an important means of educa�ng the public about the need to manage wildlife at airports.
5.5 WILDLIFE STRIKE HAZARD REDUCTION
The wildlife strike hazard on, or in the vicinity of, an aerodrome shall be assessed through:
(a) The establishment of a na�onal procedure for recording and repor�ng wildlife strikes to aircra�;
(b)The collec�on of informa�on from aircra� operators, aerodrome personnel and other sources on the presence
of wildlife on or around the aerodrome cons�tu�ng a poten�al hazard to aircra� opera�ons; and
(c) An ongoing evalua�on of the wildlife hazard by competent personnel.
Ac�on shall be taken to decrease the risk to aircra� opera�ons by adop�ng measures to minimize the likelihood
of collisions between wildlife and aircra�. The appropriate authority shall take ac�on to eliminate or to prevent
the establishment of garbage disposal dumps or any other source which may at tract wildlife to the aerodrome,
or its vicinity, unless an appropriate wildlife assessment indicates that they are unlikely to create condi�ons
conducive to a wildlife hazard problem. Where the elimina�on of exis�ng sites is not possible, the appropriate
authority shall ensure that any risk to aircra� posed by these sites is assessed and reduced to as low as reason
ably prac�cable. States should give due considera�on to avia�on safety concerns related to land developments
in the vicinity of the aerodrome that may a�ract wildlife. Fencing. A fence or other suitable barrier shall be a
provided on an aerodrome to prevent the entrance to the movement area of animals large enough to be
hazard to aircra�. A fence or other suitable barrier shall be provided on an aerodrome to deter the inadvertent
or premeditated access of an unauthorized person onto a nonpublic area of the aerodrome. Suitable means of
protec�on shall be provided to deter the nadvertent or premeditated access of unauthorized persons into
ground installa�ons and facili�es essen�al for the safety of civil avia�on located off the aerodrome. Loca�on the
fence or barrier shall be located so as to separate the movement area and other facili�es or zones on the is
aerodrome vital to the safe opera�on of aircra� from areas open to public access. When greater security
thought necessary, a cleared area should be provided on both sides of the fence or barrier to facilitate the work
of patrols and to make trespassing more difficult. Considera�on should be given to the provision of a perimeter
road inside the aerodrome fencing for the use of both maintenance personnel and security patrols.
5.6 Impact of weather on opera�ons
Weather can significantly affect aircra� opera�ons. Low cloud, fog and rain may impede visibility at or around an
airport while thunderstorms and lightning can cause serious disrup�on to flight schedules.
Thunderstorms, and the rapidly rising or falling air currents which usually accompany them, can make air travel
uncomfortable for passengers and difficult for pilots in control of aircra�. Aircra� are unable to take-off or land
during a storm and will o�en be re-routed around storm cells or diverted from their des�na�ons. Thunderstorms
and lightning strikes near airports may also stop ground opera�ons un�l they pass.
50
5.7 Minimising disrup�ons
Nigerian Airspace Management Authority (NAMA) works closely with Nigerian Metrologogical Agency (NiMet) and
air traffic controllers in our airports to minimise disrup�ons caused by weather. Air traffic controllers will adjust the
number of aircra� movements per hour to match the opera�ng condi�ons at each airport.
5.8 Impact on runway selec�on
Weather, par�cularly wind speed and direc�on, is generally the major factor to determine which runways to use
at an airport, in which direc�on aircra� will take off and land and which flight paths are used.
Aircra� must take off and land into the wind or with minimal tail wind. This means current and forecast wind
direc�on dictates the selec�on of runway/s in use at any �me. Wind direc�on can change with short no�ce and
this may affect the flight paths and runways used.
Wind blowing across the runway is called a cross wind. Generally, aircra� can take off or land where there is only a
low cross wind, usually up to a speed of about 15 knots (28 km/h). Cross winds above that speed may force aircra�
to use another runway or divert to an alterna�ve airport.
5.8 Windshear
Windshear is a sudden change in wind direc�on or speed and is usually associated with thunderstorm ac�vity.
Windshear can be either ver�cal or horizontal and can have a significant impact on the control of aircra� during
take-off and landing.
5.9 Condensa�on trails
A condensa�on trail, or contrail, is a thin trail of condensed water vapour some�mes seen trailing behind aircra�
flying at high al�tudes. Due to their unusual behaviour, they can some�mes be mistaken for a UFO.
5.10 LANDING ON SLIPPERY RUNWAYS
As a �re rolls along a wet runway, it is constantly squeezing the water from the tread. This squeezing ac�on
generates water pressures which can li� por�ons of the �re off the runway and reduce the amount of fric�on the
�re can develop. This ac�on is called hydroplaning, so technically, whenever a �re is moving on a wet surface, it is
hydroplaning. This results in �re-to-ground fric�on which can be low at high speeds and improve as speed reduces.
Viscous hydroplaning (normal wet runway fric�on). A thin film of water acts like a lubricant. The microtexture of
the runway surface (sandpaper-like roughness) breaks up the water film & greatly improves trac�on.
There are three types of hydroplaning : Viscous, Dynamic and Reverted rubber.
i Viscous hydroplaning occurs on all wet runways and is a technical term used to describe the normal slipperiness
or lubrica�ng ac�on of the the water - While viscous hydroplaning does reduce the fric�on it is not to such a low
level that the wheel cannot be spun up shortly a�er touchdown to ini�ate the an�skid system.
Viscous hydroplaning is the most commonly encountered cause of low fric�on on wet runways, and occurrences
are o�en mistaken for dynamic hydroplaning.
ii. Dynamic hydroplaning is the technical term for what is commonly called hydroplaning. During total
dynamic hydroplaning the �re li�s off the pavement and rides on a wedge of water like a water ski.
Because the condi�ons required to ini�ate and sustain it are extreme, it is a phenomenon that is rarely
encountered. However, when dynamic hydroplaning occurs it li�s the �re completely off the runway and causes
such a substan�al loss of �re fric�on that wheel spin up may not occur.
51
iii.Dynamic hydroplaning. At high speed the �re planes on deep, standing water. Tire grooves & runway surface
macrotexture (stoney or grooved surface) help drain water from the foot print & improve fric�on.
The condi�ons required to cause dynamic hydroplaning are high speed, standing water and poor surface
macrotexture. These condi�ons must con�nue without interrup�on to keep the �re on its plane. In the absence
of any of these condi�ons, dynamic hydroplaning will either not occur at all or will affect only a por�on of the
�re footprint.
Reverted rubber hydroplaning can occur whenever a locked �re is skidded along a very wet or icy runway for
a �me long enough to generate fric�onal heat in the footprint area.
Reverted rubber hydroplaning can be ini�ated at any speed above about 20 knots and results in �re fric�on
levels comparable to that of icy runways.
PERFORMANCE AGREEMENT TEMPLATE FOR PUBLIC SERVANTS OF THE FEDERAL REPUBLIC OF NIGERIA
(JANUARY - DECEMBER, YEAR........)
Name of Ministry
Mandate of the MDA
Name of Public Officer
Responsibilty under the MDA
Key Results Area for Sevice Delivery
Outcome Statement 1: (Derived from the MDA scorecard)
Outcome Indicator/Measures Agreed Target Actual Delivery
Indicator/Measure 1
Indicator/Measure 1
Indicator/Measure 1
Output Statement 1: (Derived from the MDA scorecard)
Output Indicator/Measures Agreed Target Actual Delivery
Indicator/Measure 1
Indicator/Measure 1
Indicator/Measure 1
NB: In case of Mul�ple key Result Areas, Outcomes and Outputs please Duplicate the Sec�on Above
Par�es to the Agreement
I understand that these targets will be reviewed bi-annually and will serve as the basis for assessing my
performance within the year.
Head of Agency’s Name:.............................................................................................................................
Head of Agency’s Signature:..................................................................Date:.............................................
Permanent Secretary’s Name:.....................................................................................................................
Permanent Secretary’Signature:.............................................................Date:............................................
Honourable Minster:................................................................................Date:...........................................
Mr. President:...........................................................................................Date:...........................................
52
MODULE 6
The avia�on industry provides one of the safest modes of transporta�on in the world. Nevertheless, a
safety-cri�cal industry must ac�vely manage hazards with the poten�al to impact safety. Fa�gue is now
acknowledged as a hazard that predictably degrades various types of human performance, and can contribute to
avia�on accidents or incidents. Fa�gue is inevitable in a 24/7 industry because the human brain and body func�on
op�mally with unrestricted sleep at night. Therefore, as fa�gue cannot be eliminated, it must be managed.
Fa�gue management refers to the methods by which avia�on service providers and opera�onal personnel
address the safety implica�ons of fa�gue. In general, ICAO Standards and Recommended Prac�ces (SARPs) in
various Annexes support two dis�nct methods for managing fa�gue:
i. A prescrip�ve approach that requires the service provider to comply with duty �me limits defined by theState,
while managing fa�gue hazards using the SMS processes that are in place for managing safety hazards in general;
ii. A performance-based approach that requires the service provider to implement a Fa�gue Risk
Management System (FRMS) that is approved by the State. These approaches share two important basic
features. First, they are based on scien�fic principles and knowledge and opera�onal experience.
Both should take into account:
• The need for adequate sleep (not just res�ng while awake) to restore and maintain all aspects of waking func�on
(including alertness, physical and mental performance, and mood);
• Daily rhythms in the ability to perform mental and physical work, and in sleep propensity (the ability to fall asleep
and stay asleep), that are driven by the circadian clock in the brain;
• Interac�ons between fa�gue and workload in their effects on physical and mental performance;
• The opera�onal context and the safety risk that a fa�gue-impaired individual represents in that context.
Second, because fa�gue is affected by all waking ac�vi�es (not only work demands), fa�gue management
has to be a shared responsibility between the State, Service Providers and individuals:
• The State is responsible for providing a regulatory framework that enables fa�gue management and ensuring
that the Service Provider is managing fa�gue-related risks to achieve an acceptable level of safety performance.
• Service Providers are responsible for providing fa�gue-management educa�on, implemen�ng work schedules
that enable individuals to perform their du�es safely, and having processes for monitoring and managing fa�gue
hazards.
• Individuals are responsible for arriving fit for duty, including making appropriate use of non-work periods to
obtain sleep, and for repor�ng fa�gue hazards.
53
DEFINITIONS
1. Apron: A defined area, on a land airport, intended to accommodate aircra� for purposes of loading or unloading
passengers, mail or cargo, fuelling, parking or maintenance.
2. Taxiway: A defined path on a land aerodrome established for the taxiing of aircra� and intended to provide a
link between one part of the aerodrome and another, including: Aircra� Stand Taxilane. A por�on of an apron
designated as a taxiway and intended to provide access to aircra� stands only apron taxiway. A por�on of a
taxiway system located on an apron and intended to provide a through taxi route across the apron.
Rapid Exit Taxiway. A taxiway connected to a runway at an acute angle and designed to allow landing
aeroplanes to turn off at higher speeds than are achieved on other exit taxiways thereby minimizing runway
occupancy �mes.
3. Apron Management Service: A service provided to regulate the ac�vi�es and the movement of aircra� and
vehicles on an apron.
4. Avio-Bridge Or Passenger Boarding Bridge Provide all-weather dry access to aircra� and enhance the security
of terminal opera�ons. They are o�en permanently a�ached at one end by a pivot (or rotunda) to the terminal
building and have the ability to swing le� or right. The cabin, at the end of the loading bridge, may be raised or
lowered, extended or retracted, and may pivot, to accommodate aircra� of different sizes.
5. Heliport: An aerodrome or a defined area on a structure intended to be used wholly or in part for the arrival,
departure and surface movement of helicopters.
6. Runway: A runway is the area where an aircra� lands or takes off. It can be grass, or a hard surface such as
asphalt or concrete. Runways have special markings on them to help a pilot in the air to tell that it is a runway
(and not a road) and to help them when they are landing or taking off. Runway markings are white.
Most runways have numbers on the end. The number is the runway’s compass direc�on. (For example, runway
numbered 36 (pronounced as THREE, SIX) would be poin�ng north or 360 degrees). Some airports have more
than one runway going in the same direc�on, so they add le�ers to the end of the number R for right, C for center,
and L for le�.
7. Terminal Buildings: Also known as airport terminals, are buildings that have spaces where passengers board
or alight from flights. These buildings house all the necessary facili�es for passengers to check-in their lounges
luggage, clear the customs and have lounges to wait before leaving. The terminals have house cafés, and bars
to serve as wai�ng areas for passengers. Ticket counters, luggage check-in or transfer, security checks and
customs are the basics of all airport terminals. Large airports can have more than one terminal that are
connected to one another through link ways such as walkways, sky-bridges or trams. Smaller airports usually
have only one terminal that provides all the required facili�es.
8. Runway: A defined rectangular area on a land aerodrome prepared for the landing and take-off of aircra�.
9. Runway End Safety Area (RESA): An area symmetrical about the extended runway centre line and adjacent to
the end of the strip primarily intended to reduce the risk of damage to an aeroplane undershoo�ng or
overrunning the runway.
10.Runway Guard Lights: A light system intended to cau�on pilots or vehicle drivers that they are about to enter
an ac�ve runway.
11. Runway-Holding Posi�on: A designated posi�on intended to protect a runway, an obstacle limita�on surface
or an ILS/MLS cri�cal/sensi�ve area at which taxiing aircra� and vehicles shall stop and hold, unless otherwise
authorized by the aerodrome control tower.
12. Safety Management System (SMS): A system for the management of safety at aerodromes including the
organiza�onal structure, responsibili�es, procedures, processes and provisions for the implementa�on of
aerodrome safety policies by an aerodrome operator, which provides for the control of safety at, and the safe
use of, the aerodrome.
54
13. Stopway: A defined rectangular area on the ground at the end of take-off run available prepared as a suitable
area in which an aircra� can be stopped in the case of an abandoned take-off.
14.Taxiway Strip: An area including a taxiway intended to protect an aircra� opera�ng on the taxiway and to
reduce the risk of damage to an aircra� accidentally running off the taxiway.
15. Threshold: The beginning of that por�on of the runway usable for landing.
16. Touchdown Zone: The por�on of a runway, beyond the threshold, where it is intended landing aeroplane first
contact the runway.
17. Unmanned Aircra� Systems (UAS): An aircra� and its associated elements which are operated with no pilot
on board.
18. Hangar is a closed building structure to hold aircra�, spacecra� or tanks in protec�ve storage. Most hangars
are built of metal, but other materials such as wood and concrete are also used.
19. Control Tower is the building at an airfield from which air traffic is controlled by radio and observed physically
and by radar.
REFERENCES
1. Airport Service manual, Doc 9137, ICAO, 4th Edi�on, 2002
2. Budget Implementa�on and Performance Monitoring Report, 2016 Report and 2017 Half year Report.
Ministry of Budget and Na�onal Planning, Abuja
3. Developing KPIs for Airports, Tobias Anderson Granberg and Ander Oquillas Munoz, EIWAS, 2013.
4. European Commission - EuropeAid Coopera�on Office, Project Cycle Management Guidelines, Volume 1,
Bruxelles, March 2004
5. Handbook for Monitoring and Evalua�on, 1st edi�on, IFRC,2002.
6. h�ps://www.quora.com/How-does-a-wet-runway-affect-the-landings-of-planes
7. ICAO Standards and Recommended Prac�ces Annexes 14,
8. Monitoring and Evalua�on Opera�ons Manual, Na�onal Aid Council UNAIDS, 2002,
9. “Performance Management, Managerial Authority, and Public Service Performance.” Journal of
Public Administra�on Research and Theory. Nielsen, Poul A. 2014.
10. Performance Management: The Three Laws of Performance: Rewri�ng the Future of Your Organiza�on
and your Life (1st ed.) Zaffron, Logan, Steve, David (Feb 2009).
11. Performance Monitoring Indicators handbook, Robert Mosse and Leigh Eilen Sontheimer.
The World Bank, Washington D>C.
12. Project Cycle Management Handbook by EuropeAid Co-opera�on Office General Affairs Evalua�on
13. Queensland Government Performance Management Framework Policy Department of the Premier and
Cabinet h�ps://www.qld.gov.au/gov/sites/default/files/performance-management-framework-policy.pdf
14. “The Impact of Performance Management on Performance in Public Organiza�ons: A Meta-Analysis.”
Public Administra�on Review, Gerrish, Ed. 2015.
15. Thomas J. Cook, Jerry Vansant, Lesile Stewart, and Jamie Adrian, “Performance Measurement:
Lessons Learned for Development Management,” World development 23(8) 1995.
16. www.airservicesaustralia.com/services/how-air-traffic-control-works/impact-of-weather
Flying is the second thrill known to man. The first is the landing”
Airportag.com
55
EXCELLENT OPPORTUNITIES
The avia�on industry contributes over $1billion to the Nigerian economy annually and supports more than 150,000 jobs in
Nigeria thus crea�ng immense business opportuni�es for both local and foreign investors.
Investment in airport infrastructural facili�es top the list of such opportuni�es as listed below:-
• Construc�on and management of Hanger facili�es as well as Fixed Based Opera�ons (FBOs).
• Construc�on and management of hospital facili�es including but not limited to Hotels.
• Construc�on and management of automated car parks.
• Development of Terminal buildings.
• Construc�on of runways, taxiways and aprons;
• Construc�on and Management of helipads
• Construc�on and Management of Independent Power Plants (IPP).
• Construc�on and Management of Avia�on fuel depot.
• Construc�on and Management of Cargo air services for perishable agricultural produce.
• Construc�on and establishment of Maintenance, Repair and Overhaul (MRO) facility.
• Construc�on of Aerospace University.
READY TO DO BUSINESS
Projects Loca�ons
Hotels Abuja, Port-Harcourt, Akure, Ibadan, Yola
Duty Free Shops Kano, Port-Harcourt, Abuja, Calabar, Enugu
Avia�on Fuel Depots Abuja, Kano, Ibadan, Ilorin, Port-Harcourt, Akure. Yola, Maiduguri
Water Bo�ling Plants All Airports
Holiday Inns/ Resort Centres Jos, Port-Harcourt, Owerri, Calabar
Cargo Complex/ Warehouse Calabar, Lagos, Kano, Abuja, Port-Harcourt, Akure, Yola, Jos, Owerri, Ilorin
Interline Offices Lagos, kano, Port-Harcourt, Abuja, Kaduna, Enugu
Cold Storage Facili�es Jos, Yola, Owerri, Lagos, Abuja, Kaduna
Shopping Malls Kano, Ibadan, Yola, Abuja, Port-Harcourt, Akure
Petrol Sta�ons Port-Harcourt, Abuja, Ibadan, Ilorin, Akure, Yola, Maiduguri
Fish/ Agic Farms All Airports (except Lagos and Kaduna)
Hor�culture/ Flower Gardens All Airports
Housing Estate/ Amusement Parks/ All Airports
Conference Centre
Mul�purpose Hall Enugu, Minna, Abuja, Kano, Port-Harcourt
Public Gallery Lagos, Abuja, Kano, Port-Harcourt, Enugu, Calabar
Avia�on Sta�s�cs FAAN H/Q Planning Dept
Database and Cybercafe All Airports
Hangars (Aircra� maintenance facility) Maiduguri, Ilorin, Port-Harcourt, Ibadan, Akure, Yola, Sokoto, Kano
In-Flight catering complex All Airports
Airport Adver�sement All Airports
Car Park: Development and All Airports (except Lagos and Abuja)
Management
Cargo Management All Airports
Tourist A�rac�ons All Airports
Surface/ ground transporta�on
(taxis, shu�le buses, trucks, trains etc) All Airports
Aviobridges Lagos, Port-Harcourt, Abuja, Kano, Enugu
56
AIRPORT MASTER PLAN
The Master Plan process provides a blueprint for the future of an airport. It provides a road map for efficiently
mee�ng avia�on demand through the foreseeable future while preserving the flexibility necessary to respond
to changing industry condi�ons. All airports should develop a master plan in order to guide future infrastructure
and facility development programs in a logical, sustainable and cost-efficient manner. Airport without a master
plan runs the risk that its short to medium term capacity enhancement projects are ill-judged, misconceived,
inappropriately sized and poorly located, thereby restric�ng its ability to a�ain the airport’s ul�mate poten�al.
The general goals and objec�ves addressed by an airport master plan include the following:
• To provide a framework for long-range planning
• To graphically present preferred airport development concepts in the Airport Layout Plan (ALP)
• To define the purpose and need for development projects
• To comply with all applicable NCAA, IATA and ICAO requirements
• To enable the airport to achieve its mission and vision
• To assure compa�ble land use development
• To support the financial health of the local’s economic philosophies
• To iden�fy and plan the facility requirements for all airport users - airlines, cargo, general avia�on, and travelers
A well-planned master plan should have the following characteris�cs:
• Financially feasible - the phasing of the plan’s capital projects should be aligned with the ability to secure available
funding
• Environmentally compa�ble - the plan should minimize poten�al environmental impacts
• Balanced - the plan should maintain a balance between airport development needs and community impacts
• Technically sound - the plan should comply with Federal, State, and local requirements and it should be able to
be constructed efficiently and cost effec�vely
• Responsive - the plan should address the physical and opera�onal needs of all stakeholders
• Visionary - the plan should be flexible enough to consider changes in industry dynamics which will posi�on the
airport to be sustainably a user-friendly airport
PLANNING PROCESS
The planning process of a master plan vary in complexity and degree of applica�on, depending on the size,
func�on and challenges of the individual airport. But the major elements of the plan are as follows:
• Define Strategic Objec�ves and Drivers
• Inventory of Exis�ng Condi�ons and Site’s ul�mate developmental poten�als
• Reviewing of sta�s�cal data
• Forecast of Avia�on Demand
• Demand/Capacity Analysis
• Stakeholders Facility Requirements (Input airport and airline priori�es)
• Development of Alterna�ves and Support for Emerging Technologies
• Implementa�on Plan
• Financial Feasibility
• Environmental Overview
• Draw the Airport Layout Plan (airfield configura�on, loca�on and size of airside, landside and airport
support elements)
57
APPENDIX 1
2 Strength- • Conduc�ng a • Ongoing Ongoing Assessment of Review of the Full Full Full
ening and comprehensive Project Comprehensive Assessment Implementa�on Implementa�on Implementa�on
improve- security threat Security Threat impact
ment of and vulnerabili- and
safety and ty assessment. Vulnerability
security carried out
• Development
Lagos & Abuja New Security
of new security
Cer�fied Strategy
strategy in
developed with
partnership
Interna�onal
with interna-
Organiza�ons
�onal securit
organiza�ons. partnership
Hitherto, no Modern Security Ascertain the Se-
• Procurement Govt. has ever Equipment is curity Equipment
of modern cer�fied an procured strength and
security airport in weaknesses
equipment. Nigeria.
• Comple�on
of Airports
Cer�fica�on
program
58
• To facilitate Avia�on Hub is Review the
hospitality and developed in impact of the
tourism line with global hub to
best prac�ces Nigeria
economy
Boast Avia�on
share to the
GDP
4 Development • To facilitate •Development OBC has been Procurement Agro-Cargo Full Full Full
of Agro-Cargo growth and Phase submi�ed Phase terminals Implementa�on Implementa- Implementa�on
Terminals development of to ICRC for completed commences �on
the Nigerian review and opera�on
Agricultural approval
Sector
• To create
jobs around
the Agro-Cargo
Terminals.
59
2020 FEDERAL MINISTRY OF AVIATION INFRASTRUCTURE ROADMAP
S/N Key Ac�vity Inten�on(s) Baseline (level Level of Im- Level of Im- Level of Im- Level of Im- Level of Im- Level of
of Implemen- plementa�on plementa�on plementa�on plementa�on plementa�on Implementa�on
ta�on prior to 2020 2021 2022 2023 2024 2025
2019)
7 Development • To develop • Develop- OBC has been Outline Commence- Full Implemen- Full Implemen- Full Implementa�on
of Airport Nigeria’s major ment Phase submi�ed to Business Case ment of the ta�on ta�on
Ci�es (Aero- airports and ICRC for review Approved by Procurement
tropolis) surrounding and approval ICRC Process
communi�es
into efficient,
profitable,
self-sustaining,
commercial
hubs.
• To create
jobs.
• To grow local
industry.
• To facilitate
other
businesses.
8 Development • To create • Develop- 80% Five Airports Impact of the Full Full Full
of Five Airports easy move- ment Phase completed Free Zones Airport Free Implementa- Implementa- Implementa�on
Free Zones ment for opera�ng in Zones �on �on
Imports and Nigeria
Exports
• To create Submi�ed
jobs feasibility
report (in
conjunc�on
with NEPZA)
• Improve
ease of doing
Business.
• A�ract
Foreign Direct
Investments.
60