Page 1 O17 Proposal No. IA/AP/M15/50659/20I6
Page 1 O17 Proposal No. IA/AP/M15/50659/20I6
Page 1 O17 Proposal No. IA/AP/M15/50659/20I6
III
Government of India
Ministry of Environment, Forest and Climate Change
(IA.III Section)
Indira Paryavaran Bhawan,
Jor Bagh Road, New Delhi - 3
To,
The Managing Director,
M/s Bhogapuram International Airport Corporation Ltd,
10-2-1, 3rd Floor, FDC Complex,
AC Guards,
Hyderabad — 500 028 (Andhra Pradesh)
3. The details of the project, as per the documents submitted by the project
proponent, and also as informed during the above said EAC meeting, are reported to
be as under:-
4. The EAC, after detailed deliberations on the proposal, has recommended the
project for grant of Environmental Clearance. As per recommendations of the EAC,
the Ministry of Environment, Forest and Climate Change hereby accords
Environmental Clearance to the project of 'Development of Greenfield
International Airport' in state of Andhra Pradesh promoted by Bhogapuram
International Airport Corporation Ltd under the provisions of the EIA Notification,
2006 and amendments thereto, subject to the compliance of the specific and
general conditions as under:-
(i) This Environmental clearance is subject to final order of the Hon'ble High
Court of Judicature at Hyderabad in W.P. Nos. 34090, 32879, 32956 and
33034 of 2015.
(ii) As proposed, environmental clearance is for Phase - I development of Airport
project.
(iii) Project Proponent shall be obtained clearance from Directorate General of
Civil Aviation (DGCA) and Airports Authority of India (AA]) for safety and
project facilities.
(iv) The land acquisition / purchase shall be in conformity to the LARR Act, 2013
and any other laws and regulations governing land acquisition.
(v) The proposed cconstruction site shall be adequately barricaded before the
construction to be begun.
(vi) Soil and other construction materials shall be sprayed with water prior to any
loading, unloading or transfer operation to be happen, to maintain the dusty
material wet.
(vii) The soil/construction materials carried by the vehicle shall be covered by
impervious sheeting to ensure that the dusty materials to be not leaked from
the vehicle.
(viii) The excavation working area shall be sprayed with water after operation to
maintain the entire surface wet.
(ix) Soil stockpile shall be managed in such a manner that dust emission and
sediment runoff to be minimized. The soil stockpiles to be designed with no
slope greater than 2:1 (horizontal/vertical). Top soil shall be separately stored
and used in the development of green belt.
(x) A detailed drainage plan for rain water shall be drawn up and implemented.
(xi) Ground water shall not be abstracted during the construction and operation
phases. Drinking water shall be obtained from Municipal sources. Water
conservation measures such as rain water harvesting and using treated water
from the STP will be applied to minimize the use of fresh water.
The project authorities must strictly adhere to the stipulations made by the
SPCB, State Government and any other statutory authority.
(ii) No further modification or expansion in the project shall be carried out without
prior approval of the Ministry of Environment Forest and Climate Change. In
case of deviations or alterations in the project proposal from those submitted to
this Ministry for clearance, a fresh reference shall be made to this Ministry to
assess the adequacy of conditions imposed and to add additional
environmental protection measures required, if any.
(iii) The overall noise levels in and around the plant area shall be kept well within
the standards by providing noise control measures including acoustic hoods,
silencers, enclosures etc. On all the sources of noise generation. The ambient
noise levels shall conform to the standards prescribed under the EPA Rules,
1989 viz. 78 dBA (daytime) and 70 dBA (night-time).
(Kushal Vashist)
Director
Copy to
1. The APCCF (C), Ministry of Environment, Forest and Climate Change, Regional
Office, 1st Floor, Handloom Export Promotion Council, 34, Cathedral Garden
Road, Nungambakkam, Chennai — 34.
2. The Principal Secretary, Department of Environment, Forest, Science &
Technology, Government of Andhra Pradesh, Hyderabad, A.P.
3. The Chairman, Andhra Pradesh Pollution Control Board, Paryavaran Bhawan, A-Ill,
Industrial Estate, Sanath Nagar, Hyderabad — 18, Andhra Pradesh.
4. Guard File.
5. Monitoring Cell
(Kushal Vashist)
Director