Abb Utilities GMBH: Remote Terminal Unit Connections and Settings Extension Subrack 23et23

This document provides instructions for connecting and configuring an extension subrack (23ET23) for an RTU560 remote terminal unit. Key details include: - The subrack has 19 slots for I/O boards and power is supplied via slots 1 and 5. - The subrack address is set using DIP switches to avoid duplicates across subracks connected to the same RTU560 unit. - Process I/O connections are made using crimp clips and DIN-F connectors. Voltage monitoring ensures proper power levels are maintained. - The subrack can be expanded by connecting additional units via a daisy chain using the serial peripheral bus, which must be properly terminated at each end

Uploaded by

Alik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
445 views8 pages

Abb Utilities GMBH: Remote Terminal Unit Connections and Settings Extension Subrack 23et23

This document provides instructions for connecting and configuring an extension subrack (23ET23) for an RTU560 remote terminal unit. Key details include: - The subrack has 19 slots for I/O boards and power is supplied via slots 1 and 5. - The subrack address is set using DIP switches to avoid duplicates across subracks connected to the same RTU560 unit. - Process I/O connections are made using crimp clips and DIN-F connectors. Voltage monitoring ensures proper power levels are maintained. - The subrack can be expanded by connecting additional units via a daisy chain using the serial peripheral bus, which must be properly terminated at each end

Uploaded by

Alik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

ABB Utilities GmbH RTU560

Remote Terminal Unit


Connections and Settings
Extension Subrack 23ET23

Application, characteristics and technical data have Subrack address setting


to be taken from the hardware data sheet:
DIP switch register S1 specifies the logical RTU560
23ET23 1 KGT 150 412 rack address. Each subrack must have a different
RTU 560 rack address.

Operation S1-1 S1-2 S1-3


RTU560
rack address
The 23ET23 extension subrack can be mounted in ON OFF OFF 1
hinged frames or open racks. The process signal ac- OFF ON OFF 2
cess is done by DIN-F sub-connectors. They are ON ON OFF 3
clipped into a cut-out in the DIN-F connector body. OFF OFF ON 4
ON OFF ON 5
The extension subrack has 19 slots for process I/O OFF ON ON 6
boards. The power supply is plugged to slot 1 and 5. ON ON ON 7
S1-4 not used

Processing function ON
ON
1 2 3 4
Voltage monitoring and watchdog supervi- OFF
sion
Table 1: RTU560 rack address setting
Fig. 1: shows the voltage monitoring diagram. The
relay k 01 is only switched if: Serial peripheral bus termination
Fig. 6: shows the principle serial peripheral bus
- + 5 V DC and
routing. X1 / X2 allow to expand the RTU560 with
- + 24 V DC are present. additional extension subracks by a daisy chain con-
nection. The serial bus has to be terminated by a 1 k
If one or both of the two voltages is missing relay k 01 resistor at both ends. R1 of the basic subrack is fixed
is released and the contact closed. placed. The other termination should be done during
commissioning.
- Remove all terminator resistors (R 21) on sub-
racks that are not the last one.
X 11 K 01 - Use shielded cables for the serial bus.
RK1 0V
Voltage
+5V
MK1 monitoring Regard grounding conditions, EMC specifications
+ 24 V
RK1 and power distribution in a distributed subrack con-
MK1 figuration for the serial peripheral bus (RS 485 stan-
X 12 dard).

Serial peripheral bus by 23OK22 fibre optic


coupler
Use 23OK22 boards for the serial peripheral bus if a
Fig. 1: Voltage monitoring longer distance must be linked or the grounding situ-

Doc.No.: 1KGT 150 441 V000 1 73


ABB Utilities GmbH
Connections and Settings 23ET23 RTU560

ation is not clear. See Fig. 6: how the principle con- Order number for sub-connector and crimp-
nection is done. clips
Fixing peripheral boards - 1KGN 000758 R1001 (23XS40 R 1001)
Fix each I/O-board or other peripheral RTU560 board 18-pole sub-connector
in the subrack for operation. - 1KGN 000758 R2001 (23XS40 R2001)
Fasten each board by the two fixing screws in the up- Crimp clips (500 pcs)
per and lower fixing rail of the subrack. The front plate
is then connected (grounded) to PE / A.
Tools for 23XS40:
The EMC specification of each board is only valid if - 1KGN 000797 R0001 Crimp tool
the board front plate is grounded. - 1KGN 000798 R0001
Extraction tool for crimp clips
Process I/O connections
- 1 KGN 000799 R0001
The connection of the signal wires is made by the Removal tool for sub- -connectors
means of crimp clips using snap-in fixings. In addition
to the use of premanufactured cables it is also pos-
sible to attach individual wires during commission-
ing.
Use AMP tools for crimp-snap-in spring-contacts.

DIN- -F connector

Sub- -connector looking from cable entry side

Fig. 2: I/O signal sub-connector

74 Doc.No.: 1KGT 150 441 V000 1


ABB Utilities GmbH

RTU560 Connections and Settings 23ET23

RTU 560 board address


NG 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Slot address
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81

Fig. 3: Layout basic subrack

S1

Fig. 4: Layout customer connectors (looking from back side)

Doc.No.: 1KGT 150 441 V000 1 75


ABB Utilities GmbH
Connections and Settings 23ET23 RTU560

UB +
X 14
UB - -
UB +
X 15
UB - -
z 30 / z 32 z 26 z 28
b 30 / b32 b 26 b 28
UE + d 30 / d 32 d 26 d 28
X 16 23NG23
UE - -
UE +
X 17 z8 z 10 z4 z2
UE - - b8 d 10 b4 b2
d8 b 10 d4 d2

0V + 24 V +5V
X 64 X 63
PE
PE 0V

slot 9 A (6.3 Faston) z 20 / b 20 / d 20 z 16 / b18 / d 18 z 18 b 16

slot 13 A z 20 / b 20 / d 20 z 16 / b18 / d 18 z 18 b 16

DIN F connectors
slot 57 A z 20 / b 20 / d 20 z 16 / b18 / d 18 z 18 b 16

slot 61 A z 20 / b 20 / d 20 z 16 / b18 / d 18 z 18 b 16

X 1 socket (A)
subrack X 2 socket (A)

Fig. 5: DC voltage and grounding distribution

76 Doc.No.: 1KGT 150 441 V000 1


ABB Utilities GmbH

RTU560 Connections and Settings 23ET23

BUSABSCHLUSS
+5V
R4
R6 X1 1k
Basic
2 subrack

SPB
R1
3
7
R5 Slot 5...61
socket
Address: 1...15
and slot 65 (communication unit) 2
0V
3
0V 7
(A) socket
X2

R 21 1 k X1 Extension
2 subrack
3 Adr.: 001
SPB
7
BUSABSCHLUSS
Slot 5....81 socket
Address: 1...19 2
3
0V 7
(A) socket
X2

R 21 1 k X1 Extension
2 subrack
3 Adr.: 00n
SPB
7
BUSABSCHLUSS Slot 5...81 socket last subrack
Address: 1...19
2
3
0V 7
(A) socket
X2

Fig. 6: Serial peripheral bus / Bus termination

Doc.No.: 1KGT 150 441 V000 1 77


ABB Utilities GmbH
Connections and Settings 23ET23 RTU560

BUSABSCHLUSS
+5V Slot 5...61
Address: 1...15 R4
R6 and slot 65 (communication unit) X1 1k
Basic
2 subrack

SPB
R1
3
7
R5
23OK22 socket

2
0V Replace T1 and T2
0V
in 23OK22 3
+5V 0V 7
R2 R7 R1 (A) socket
X2

RX TX
fibre optic cable
TX RX

R2 R7 R1

+5V
0V

23OK22 Slot 5....81


R 21 1 k
Address: 1...19 X1 Extension
2 subrack
3 Adr.: 001
SPB
7
BUSABSCHLUSS
socket

Place 23OK22 in slot 9 if not the last subrack 3


Place 23OK22 in slot 81 and solder R21 if last or only subrack 0V 7
(A) socket
X2

R 21 1 k X1 Extension
2 subrack
3 Adr.: 00n
SPB
7
BUSABSCHLUSS Slot 5...81 socket last subrack
Address: 1...19
2
3
0V 7
(A) socket
X2

Fig. 7: Subrack configuration with 23OK22 for serial peripheral bus

78 Doc.No.: 1KGT 150 441 V000 1


ABB Utilities GmbH

RTU560 Connections and Settings 23ET23

Doc.No.: 1KGT 150 441 V000 1 79


ABB Utilities GmbH
Connections and Settings 23ET23 RTU560

ABB Utilities GmbH


68309 Mannheim (Germany)
Telephone +49 (0) 621 381-7592
Telefax +49 (0) 621 381-7622 03/2001 Subject to alteration

80 Doc.No.: 1KGT 150 441 V000 1

You might also like