Work Process Flowchart Using BITRIX: Log in (Online) Option/Decision Box D1 D2 D3 D4 D5 D6 D7 D8 D2 Log Out (Offline)

The document provides a flowchart outlining the work process using the BITRIX platform. It begins with logging in online and includes decision points on whether there is work to be done, projects and tasks to perform, and time budgeting requirements. If work is to be done, the user can create projects, assign tasks, track time, and pause/finish tasks. Reports can then be generated on task and resource tracking before logging off. The flowchart provides a visual guide to the basic workflow and options using the BITRIX platform.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

Work Process Flowchart Using BITRIX: Log in (Online) Option/Decision Box D1 D2 D3 D4 D5 D6 D7 D8 D2 Log Out (Offline)

The document provides a flowchart outlining the work process using the BITRIX platform. It begins with logging in online and includes decision points on whether there is work to be done, projects and tasks to perform, and time budgeting requirements. If work is to be done, the user can create projects, assign tasks, track time, and pause/finish tasks. Reports can then be generated on task and resource tracking before logging off. The flowchart provides a visual guide to the basic workflow and options using the BITRIX platform.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Process Flowchart using BITRIX

Prepared by: Ryan Marquinez


Version date : 9.5.21
LOG IN
(online)

OPTION/DECISION BOX
D1 Are you going to work today?
No Yes LOG OUT D2 Is there a filed leave?
D1 D2 (offline) D3 Are there projects and tasks to
1 be performed?
D4 Is time budget required?
Yes No
D5 Met the required minimum
working hours?
File a leave for
Clock in approval using D6 Select another task?
workflow D7 Apply for Payroll deduction or
file a leave?
D8 Are you going to log out?
No Create Project Yes
(members and Create *Should be created by the owner (Team
D3 D4
time Leader) of the project
deadlines)*
budget **put time track and plot by team leader
Yes
No A

Plot the tasks and -Work Plan


Start/Continue -Work Done
activities to be
-Work Loads
the selected Project and performed** - Work Deadlines
Project and task Task
-Project status
and track the A
time if required
B
(can be exported )
Yes No -DTR (limited customization)
-Worktime (attendance)
No -Time Spent analysis per User and per
Pause or Finish D6 D7 Project
the task

Yes
No
Go to the
REPORTS and Yes
Generate task D5 Clock Out
resource
tracking

No
D8 Stay
online
Time and
Reports,Reports Yes
or
B
LOG OUT
(offline)