Extension works from PK24 to PK105 of the

Route Nationale Transgabonaise

EMERGENCY RESPONSE PLAN

Revisionsheet: Version R3
Organization Validator Dated Visa

EPC

Partner
SUMMARY

LIST OF TABLES........................................................................................................... 5
FIGURES… ..................................................................................................................... 6
ACRONYMS AND DEFINITIONS ............................................................................... 6
1. INTRODUCTION .................................................................................................. 8
1.1. Context ........................................................................................................ 8
1.1.1. Project display ............................................................................................. 8
1.1.2. Scope of this management plan .................................................................. 9
1.2. Terminology used ...................................................................................... 10
1.3. Approach and objectives of the INTERVENTION plan ......................... 10
2. HEALTH AND SAFETY EMERGENCIES ....................................................... 11
2.1. Generalities ............................................................................................... 11
2.1.1. Goals .......................................................................................................... 11
2.1.2. Measures.................................................................................................... 11
2.2. inteverners ................................................................................................. 12
2.3. Health and safety risks .............................................................................. 12
2.4. Definitions ................................................................................................. 13
2.5. Means of preparation ................................................................................ 13
2.6. Means of intervention ............................................................................... 14
2.6.1. Means of taking care of an injured person .............................................. 14
2.6.1.1.Human resources ...................................................................................... 14
2.6.1.2.Technical means ....................................................................................... 14
2.6.2. Fire fighting means ................................................................................... 15
2.6.2.1.Fire extinguishers ..................................................................................... 15
2.6.2.2.Water extinguishing ................................................................................. 16
2.6.3. General alarms .......................................................................................... 16
2.6.4. Means of communication and transmissions ........................................... 17
2.6.5. Emergency resources ................................................................................ 17
2.6.6. Variousmaterials ....................................................................................... 18
2.7. Organization of intervention areas ........................................................... 19
2.7.1. Command centers ..................................................................................... 19
2.7.2. Medicalposts .............................................................................................. 20
2.8. Roles and responsibilities .......................................................................... 20
2.8.1. Responsibilities of the Principal Controller ............................................. 20
2.8.2. Responsibility of the Communications Coordinator ............................... 20
2|P a ge
2.8.3. Responsibilities of the Incident Controller............................................... 21
2.8.4. Responsibility of Incident Response Team Members .............................. 21
2.8.5. Responsibility of Site Supervisors ............................................................ 22
2.8.6. Site personnel ............................................................................................ 22
2.8.7. First aid, firefighters and police ............................................................... 22
2.8.8. Subcontractors .......................................................................................... 23
2.9. Emergency response procedures .............................................................. 23
2.9.1. Emergency signalingflowchart ................................................................. 25
2.9.2. Fire ............................................................................................................ 26
2.9.2.1.Emergency response plan for a minor fire .............................................. 26
2.9.2.2.Action plan for a Major fire ..................................................................... 26
2.9.2.3.Fire emergency procedures ...................................................................... 27
2.9.2.4.Special case of firefollowing an explosion ................................................ 28
2.9.3. Personal accidents involving machinery or vehicles ................................ 30
2.9.4. Collapse of building, hangars and structures etc. .................................... 31
2.9.5. Gas leak ..................................................................................................... 32
2.9.6. Natural disasters (storm, earthquake, lightning, etc.) ............................. 33
2.9.6.1.General guidelines .................................................................................... 33
2.9.6.2.Storm procedure ....................................................................................... 33
2.9.6.3.Lightning strike procedure ...................................................................... 34
2.9.6.4.Procedureduring an earthquake .............................................................. 34
2.9.7. Response plan in the event of a fall from a height / serious injury ......... 35
2.9.8. Civil unrest / Violence ............................................................................... 35
2.9.9. Snake, scorpion or insectinjury ................................................................ 36
2.9.10. "Missing person" ...................................................................................... 37
2.9.11. Crisis management methods with internal / external interference ......... 40
2.9.11.1. Serious injury of a local resident ......................................................... 40
2.9.11.2. Case of a fire generated on the site that could impact resident soutside
the site 40
2.9.11.3. Case of an event outside the site thatcould impact the personnel inside
the site 40
2.10. Description and location of routes and meeting point ............................. 42
2.11. Control List ............................................................................................... 43
2.12. Training and retraining ............................................................................ 43
2.12.1. Emergency situations training .................................................................. 43

3|P a ge
2.12.2. Exercises .................................................................................................... 43
2.13. Maintenance and resumption of activities and emergency plans ............ 44
3. ENVIRONMENTAL EMERGENCIES .............................................................. 45
3.1. Generalities ............................................................................................... 45
3.1.1. Goals .......................................................................................................... 45
3.1.2. Measures.................................................................................................... 45
3.2. Speakers .................................................................................................... 46
3.3. Environmental risks .................................................................................. 47
3.4. Definitions ................................................................................................. 47
3.5. Means of preparation ................................................................................ 48
3.5.1. Classification of spills ................................................................................ 48
3.5.2. Preparation of resources ........................................................................... 48
3.6. Means of intervention ............................................................................... 49
3.6.1. Human resources ...................................................................................... 49
3.6.2. Technicalmeans ......................................................................................... 50
3.6.2.1.Anti-spill kit .............................................................................................. 50
3.6.2.2.Personal Protective Equipment (PPE) ..................................................... 51
3.6.2.3.Otherequipment ....................................................................................... 51
3.6.3. Means of communication and transmissions ........................................... 52
3.6.4. Emergency resources ................................................................................ 53
3.6.5. Variousmaterials ....................................................................................... 53
3.7. Organization of intervention areas ........................................................... 54
3.7.1. Command centers ..................................................................................... 54
3.7.2. Waste storage areas .................................................................................. 55
3.7.3. Medical posts ............................................................................................. 55
3.8. Roles and responsibilities .......................................................................... 55
3.8.1. Responsibilities of the Principal Controller (Project Manager) .............. 55
3.8.2. Responsibility of the Communications Coordinator ............................... 56
3.8.3. Responsibilities of the Incident Controller............................................... 56
3.8.4. Responsibility of Incident Response Team Members .............................. 57
3.8.5. HSE Director ............................................................................................. 57
3.8.6. HSE / Environment Engineer ................................................................... 58
3.8.7. Responsibility of Site Supervisors ............................................................ 58
3.8.8. Site personnel (all employees) ................................................................... 58
3.8.9. First aid, firefighters and police ............................................................... 59

4|P a ge
3.8.10. Subcontractors .......................................................................................... 59
3.9. Emergency response procedures .............................................................. 60
3.9.1. Procedure in the event of a productspill .................................................. 60
3.9.2. Emergency signalingflowchart ................................................................. 62
3.9.3. Chemical and oilspill ................................................................................. 63
3.10. Training and retraining ............................................................................ 64
3.10.1. Training in environmental emergency management ............................... 64
3.10.2. Exercises .................................................................................................... 64
3.11. Maintenance and resumption of activities and emergency plans ............ 65
4. INCIDENT MANAGEMENT PROCEDURE .................................................... 66
4.1. Incident declaration (with location) ......................................................... 66
4.2. Monitoring the effects of the incident....................................................... 66
4.2.1. Monitoring the effects of a fire ................................................................. 66
4.2.2. Monitoring the effects of an accident on an employee ............................. 66
4.2.3. Monitoring the effects of a conflict with local residents .......................... 66
4.2.4. Monitoring the effects of an environmental incident ............................... 66
4.3. Proposal of a remediation plan and modification of processes if necessary
................................................................................................................... 67
4.4. Monitoring of the implementation of the remediation plan .................... 67
4.5. Closure of the incident .............................................................................. 67
5. COMMUNICATION WITH LOCAL ADMINISTRATIVE AUTHORITIES . 67
5.1. Communication with the media ............................................................... 68
5.2. Communication with the public ............................................................... 68
APPENDICES ............................................................................................................... 69
Annex 1 -Declaration and follow-up of a health and safety emergency ............................ 70
Annex 2 -Improvement of the Emergency Plan ................................................................ 73
Annex 3 -Forms following a simulation exercise ............................................................. 75
Annex 4 -List of minimum stocks of PPE in the event of a spill ....................................... 80
Annex 5 -Immediate spill declaration form ...................................................................... 82
Annex 6 -Spill Prevention and Response Training Form Immediate Spill Declaration ..... 87

LIST OF TABLES

Table 1 - Acronyms and definition ................................................................................. 7


Table 2 - Preparation of means for preparing for health and safety emergencies ...... 13
Table 3 - Human resources internal to the project for casualty relief ......................... 14
Table 4 - Human resources external to the project for wounded relief ....................... 14
5|P a ge
Table 5 - Technical resources internal to the project for casualty relief ..................... 15
Table 6 - Classes of fires and extinguishers .................................................................. 15
Table 7 - Fire extinguishers available on site ............................................................... 16
Table 8 - Types of health and safety alarms within the project ................................... 16
Table 9 - Internal means of communication made available ....................................... 17
Table 10 - Name and contact number of the on-site emergency response team ......... 17
Table 11 - EPC Staff Telephone Numbers .................................................................... 18
Table 12 - Other internal equipment made available .................................................. 18
Table 13 - Preparation of resources for environmental emergency preparedness ..... 48
Table 14 - Human resources internal to the project for responding to an emergency 49
Table 15 - Human resources external to the project for wounded relief ..................... 49
Table 16 - Technical resources internal to the project for casualty relief ................... 50
Table 17 - Internal means of communication made available ..................................... 52
Table 18 - Name and contact number of the on-site emergency response team ......... 53
Table 19 - EPC Staff Telephone Numbers .................................................................... 53
Table 20 - Other internal equipment made available .................................................. 53

FIGURES

Figure 1 - Illustration of the 3 stages of the project ....................................................... 8


Figure 2 - Illustration of the section of road covered by this management plan ........... 9
Figure 3 - Response to Product Spills ........................................................................... 61

ACRONYMS AND DEFINITIONS

The meaning of the acronyms and the definition of certain formulas used in the plan are detailed in
the table below.

ESC Environmental and Social Coordinator


CSESD Departmental Environmental and Social Monitoring Committees
DESG Social Environment and GovernanceDirector
DGEPN Directorate General for the Environment and Nature Protection
EPC Construction contractor
WHO World HealthOrganization
NGO Non-governmentalorganization
PK Mileage point
ESMP Environmental and Social Management Plan
ESM Environmental and Social Manager
RN National road
SAG Gabon MotorwayCompany

6|P a ge
IFC International finance corporation
SGES Environmental and Social Management System
ST Subcontractor

Table1 - Acronyms and definition

7|P a ge
1. INTRODUCTION

1.1. CONTEXT

1.1.1. Project display

The SAG consortium, formed by Meridiam and GSEZ (ARISE) has been requested by the
Gabonese government to implement the project to redevelop and operate the so-called
Transgabonaiseeconomic road, linking Libreville to Franceville. The Transgabonaiseis Gabon's
major road axis, approximately 828 km long, itfollows the national roads RN1, RN2, RN3 and
RN4.
Meridiam and GSEZ (ARISE) both have experience in structuring and delivering large projects in
the country. The projectisdevelopedwithin the framework of a 30-year public-private partnership
contract by which the State grants the Partner the design, redevelopment, financing, maintenance,
operation and maintenance of the Transgabonaise.
Between Libreville and Franceville, the projectisdividedintothree stages, shown on the mapbelow:
1. Stage 1: Libreville - Alembé;
2. Stage 2:Alembé - Mikouyi;
3. Stage 3:Mikouyi - Franceville.

Figure 1 - Illustration of the 3 stages of the project


1.1.2. Scope of this management plan

Within Stage 1 of the project, the EPC will be in charge of the contract for the design and
redevelopment / construction of PK24 to PK105 of the N1 national road, connectingNkok to
Kango, passing throughNtoum, Kougouleou and Ndouaniang.
This management plan covers the activitiesrelating to the redevelopment / construction
workscorresponding to this segment rangingfrom PK24 to PK105, illustrated on the mapbelow.

Figure 2 - Illustration of the section of road covered by this management plan

The works consist of the repair or improvement of the roadway, hydraulicworks (drainage, etc.), the
installation of safety and signaling equipment.
The EPC will design, build, test and complete all installations and systemsnecessary to carry out the
work.
The redevelopment and improvementworks, as specified, will be carried out within the framework
of the existing right-of-way, avoiding the acquisition of land, except for places where the wid this
insufficient and where provisions for correcting the route, d Improvement of intersections /
geometriccharacteristics of the road are considerednecessary, feasible and affordable. This is the
case, for example, of the doubling of lanesplannedbetween PK24 and PK40.

9|P a ge
1.2. TERMINOLOGY USED

Throughout the document, the following terminology isused with the following meaning:
 The Project:Redevelopment of the section from PK24 to PK105 of the Route Nationale
Transgabonaise;
 The Partner: Société Autoroutière du Gabon (SAG);
 EPC: Afcons Infrastructure Limited.

1.3. APPROACH AND OBJECTIVES OF THE INTERVENTION PLAN

The implementation of this plan is part of the Environmental and Social Management System
(ESMS) of the EPC. This plan aims to allow the EPC to identify potential emergency situations,
with a view to planning in advance the development of organizational and technical lmeasures to
ensure a rapid and effective response to an emergency situation on the safety or environmental plan.

10 | P a g e
2. HEALTH AND SAFETY EMERGENCIES

2.1. GENERALITIES

2.1.1. Goals

This chapter aims to implement the necessary measures in order to anticipate all the situations
which would cause an emergency situation such as an explosion or even a fire in construction areas
or parking or guard areas.
These chapters will provide adequate human and material resources in order to reduce the response
time and thuslimit the accident to the smallest possible area. This chapter helps to limit indirect
impacts on the human and natural environment, in particular impacts on health.

2.1.2. Measures

This program will:

 Train operators in case of emergency response. These trainings will giverise to special
training sessions;

 Establish inspection programs;

 Identify on a map the locations of hazardous materials and the activities in which they are
used for rescue operations;

 Describe the firefighting equipment, fireextinguishers, safety data sheet, etc. ;

 Certify the availability of Personal Protective Equipment and the necessary equipment in the
event of an intervention in an emergency situation;

 Describe the planned organization in the event of an intervention (internal and external
notification procedures, responsibilities, decision-making process, emergency exits and
post-accident operations);

 Describe the coordination of planning with a view to informing the public, response
organizations, indicating first aid and emergency medical treatment, and finally reviewing
and updating the response plan in the event of an emergency regularly to take in to account
all the realities on the ground. Ensure that this information is communicated to employees;

 Establish an emergency response register.

11 | P a g e
2.2. INTEVERNERS

The main stakeholders for the management of emergency situations within the emergency response
team willbe:

 The Principal Controller is responsible for all aspects of emergency preparedness and
response during operations.

 The Communications Coordinatoris the only official spokes person authorized to deal with
external gencies.

 The Incident Controller.

 Members of the Incident ResponseTeam.

 Site Supervisors.

 Site personnel.

 Senior Officials, the Safety and Security Service, any local and administrative authority
involved or not at different levels of information depending on the nature of the emergency
to be managed.

 Intervention and rescue services (external firefighters), depending on the nature of the
emergency to be managed.

2.3. HEALTH AND SAFETY RISKS

The main crisis situations identified during the construction phase likely to impact the health and
safety of people, and requiring the implementation of intervention and emergency procedures are
listed below:

 Serious injury to a workerworking on the site;

 Serious injury to a local resident due to site activities;

 Natural event of storm type, flooding;

 Collapse of structure on site;

 Fire on the site or near the site;

 Civil unrest / violence;

 Conflicts with the neighborhood of the building site (local residents).


This list will be constantly updated according to the news of the site.

12 | P a g e
2.4. DEFINITIONS

Serious injury: Cannot be supported by internal means on the project.


Civil unrest / violence: Popular events, conflicts or demonstrations likely to represent a source of
aggression to the physical integrity of people.
Internal resources: Resources made available by the EPC within the framework of the
project.

Externalmeans : Public means.

2.5. MEANS OF PREPARATION

In order to facilitate the implementation of response operations in the event of an emergency


situation, and therefore in order to ensure efficiency and speed, various technical and organization
almeasures will be implemented at each of the sites.
Table2 - Preparation of resources for emergency health and safety emergency preparedness
Theme Preparatory measures
Escape routes  Clearlyidentified on the site
 Permanentlyclear
 Clearlyidentified on the site
Means of
intervention  Accessible at all times
 Available in sufficientnumbers
 Checked and maintained
Warning means  Clearly visible
 Checked and maintained
Emergency  Displayed at strategic locations on the site
numbers
 Clearly visible
 Updatedwheneverneeded
First aidprocedures  Displayed at strategic locations on the site
 Clearly visible
Means of  Permanentlycharged
communication
 Available in sufficient numbers
Meeting points  Clearly identified
 Large enough to accommodate all staff
 Location in a safe area
Lifeguards  Permanently present in sufficient numbers
 Easily and quickly identifiable
First aid kit  Always full
 Always accessible
Staff  Trained and regularlytrained
Weather data  Daily monitoring of weather data and storm warning
Geopolitical context  Daily monitoring of the geopolitical context
13 | P a g e
2.6. MEANS OF INTERVENTION

2.6.1. Means of taking care of an injured person

2.6.1.1. Human resources

Human resources internal to the project


The humanresourcesinternal to the projectinvolved in the care of a serious injury generated by the
activities of the site, and the management of the emergency situation, are listed in the following
table:
Table3 - Human resourcesinternal to the project to help the injured
Qualification Roleduring the emergency Phone
number
First aid First aid 07 75 79 264 /
06 64 44 995
Security agents Unauthorized entry control and 06 64 32 658
barricades.
Head of HSE Fire zone accesscontroller 06 10 05 417

External resources to the project


The external resources to the project directly involved in the care of a serious sinjury generated by
the activities of the site, and the management of the emergency situation, are listed in the following
table:
Table4 - Human resources external to the project to help the injured
Qualification Phone number
Police 177
Firefighters 18
Ambulance 177
Army Instruction Hospital +241 11 79 00 00
Military Hospital, PK-9, Libreville
NTOUM Medical Heath center

2.6.1.2. Technical means

The technical means internal to the projectdirectlyinvolved in the care of a serious injury generated
by the activities of the site are listed in the following tables:

14 | P a g e
Table5 – Technical resources internal to the project for wounded relief
Type Location
First aid kit Offices/Warehouse/Vehicle/
oil Station/Power
Plant/Workshop/Kitchen/
Hotmix and bayching plant
Warm blanket or silver rescue sheet Warehouse/Clinic
Rescue harness Hotmix and batching
plant/Workshop

Drug stock Clinc

2.6.2. Fire fighting means

2.6.2.1. Fire extinguishers

Fireextinguishers of the correct type and in correct working condition are the first line of
defenseagainst a fire. Knowing the location of extinguishers and the type of firethey are intended to
extinguishis essential.

Types of fire extinguishers


Extinguishers of the correct type and in good workingorder are the first line of defenseagainst a fire.
Know the location of the extinguishers and the type of fireeachisdesignated to extinguish
Board6 - Classes of fires and extinguishers
Serial
Fire class APPROPRIATE TYPE OF APPLIANCES
No
1 Class "A" - Fires in ordinary fuels (wood, Type of water expelledfromgas and buckets
plants, fibers, rubber, plastics, paper, and the of water.
like).
2 Class "B" - Fires in flammableliquids, paints, Carbon dioxide and dry
greasesolvents and the like. powderchemicalfireextinguishers and
sandbuckets
3 Class "C" - Fires of gaseous substances under Dry Chemical Powder and
pressure, includingliquefiedgases. Carbon dioxide.
4 Class "D" - Combustible metalfire Special types of dry powderextinguishers
and sandbuckets.
5 Class "E" - Electrical Installations, Motors Dry Chemical Powder and
and Switchgear Carbon dioxide

6 Class "F" - Fire of combustible liquids Wetchemicalfireextinguishers


(cooking oil and grease)

15 | P a g e
Fire extinguishers deployed on the project
The extinguishers available on the site will be:
 Provided in sufficient numbers.

 Arranged appropriately.

 It will be guaranteed that the extinguishers will not be blocked and will be certified annually
by an external company. Monthly fire extinguisher inspection should be performed and
documented
Table7 – Fire extinguishers available on site
Breakdown Type of
by Type of Number extinguishing Capacity Precise locations on the
geographic extinguisher agent (L) site
area
10 Offices/ Warehouse
3 /Vehicle/oil Station/Power
AB portable Liquid
6 Plant/Workshop/Kitchen/
Hotmix and bayching plant
Mobile AB 0
Construction Portable 8 Wharehouse/Kitchen/Hotmix
site Powder 9
powder and Batching plat/ Workshop
Powder 0
mobile
3 Oil Station
CO2 CO2 2

2.6.2.2. Water extinguishing

A overhead water tank is present at the PK 50 and 95 base camps for fire fighting purposes.

2.6.3. General alarms

In certain cases, a generalalarmwill have to betriggered to warn all the personnel of a site and / or to
warn the neighboringresidents by the emergency situation.

Table8 - Types of health and safetyalarmswithin the project


Alarm / alert type Modalities
Manuel alarm ,soundis intermittent
Fire and the siren is switched off ten
times

Weatherevent Manuel alarm ,soundis intermittent


and the siren is switched off ten
16 | P a g e
times
Manuel alarm ,soundis intermittent
Civil troubles and the siren is switched off ten
times
Manuel alarm ,soundis intermittent
(Other) and the siren is switched off ten
times

2.6.4. Means of communication and transmissions

In an emergency, the necessaryresourceswillbe made available to:


 Communicatewithinternal and external people involved in the management of the incident;

 Follow the news live from the incident control center.


Table9 - Internal communications resources made available
Means Number Characteristics Location
VHF / HF radio 0

Mobile phones 70 CUG


Everywhere
Satellite phones 0
0
Talkie Walkie 2 Everywhere
Television 1 Everywhere
Radio station 0

2.6.5. Emergency resources

This plan shouldbeupdated if thereis a change in any of the contact persons / contact number.
Table10 - Name and contact number of the on-site emergency response team
Last name Designation Roleduring the emergency Contact no.
Mr. Sujit Kumar Jha Project Manager Main Controller 06 01 83 319/06
10 05 400
Mr. Agnelo Pereira Head of Communications Coordinator 06 10 05 406
Administration
Mr. AneeshKumar.S Head of HSE Fire zone accesscontroller 06 10 05 417
Mr. Nishant Kumar Plant Manager Installation of facilities and equipment 06 10 05 412
Mr. Jerome Security agent Unauthorized entry control and 06 64 32 658

17 | P a g e
barricades.
Mr. NdongBitome First aid First aid 07 75 79 264/06
Lucien 64 44 995
Contact details of externalagency in Gabon
Police 177
Firefighters 18
Ambulance 177
Medical services
Army Instruction Hospital Military Hospital, PK-9, Libreville +241 11 79 00 00

Table11 - Telephonenumbers of EPC staff


Last name Designation Contact no.
Mr. Sujit Kumar Jha Project Manager +241 610 05 400
Mr. Agnelo Pereira Head of Administration +241 610 05 406
Mr. AneeshKumar.S Head of HSE +241 610 05 417
Mr. Nishant Kumar Plant Manager +241 610 05 412
Mr. Rajeshwar Sao QA / QC Manager +241 610 05 915
Mr. Jerome Security agent +241 664 32 658
Mr. Avdesh Kumar Execution Engineer +241 610 05 415
Mr. Sandesh Kumar Execution Engineer. +241 610 05 416
Mr. ManikAich Sr. Surveying Engineer +241 610 05 409

2.6.6. Variousmaterials

Table12 - Otherinternalequipment made available


Means Number Characteristics Location
160 KVA
415 Volts Hot mix plan / Pont
Generator 2
bascule
Brand Stamford
Emergency lighting 0
Emergency Lamps and
0
Torches

18 | P a g e
2.7. ORGANIZATION OF INTERVENTION AREAS

2.7.1. Command centers

The Meeting Room has been identified as the Emergency Control Room.
The following items are provided in the Incident Control Center:
01. Site plan showingevacuation routes and assembly point and access routes.
02. List of emergency contacts, numbers of key project personnel and other external agencies
such as the Gabon Fire Department, Ambulance, etc.
03. List of safetyequipment applicable on the site and theirstorage locations.
04. Details of the fire station.
05. Emergency power ON / OFF.
06. Hand lamps / emergency torches, Hand alarms.
07. Details of the surroundingcommunity, including the telephonenumbers of village and
township chiefs.
The location of the EPC Project Manager's office isindicated on the plan of the base-camp located
at PK-50.

Emergency Control Room


(Meeting Room)

19 | P a g e
2.7.2. Medicalposts

Seriously injured people are sent directly to hospitals.


The injured will be taken to the first aid center for initial treatment and advised for furthertreatment
in hospitals, if necessary. As soon as the necessary first aid means prove to beinsufficient, the
person will be redirected to hospitals.

2.8. ROLES AND RESPONSIBILITIES

The roles and responsibilities of the emergency response team are outlined below.

2.8.1. Responsibilities of the Principal Controller

 Control and lead the overall situation from the incident control center

 Coordinate the action with the Incident Controller

 Call and inform the emergency public services if necessary

 Inform the Partner of the changeover of the project in a crisis management situation

 Direct the evacuation of people and stop construction activities if necessary

 Use key operational staff

 Continuouslyreview and assess possible developments

 Ensure the injured receiveap propriate attention

 Communicatewith public emergency service agents

 Keep a register of accidents or emergencies

 Issue statements to employees and public media

 Control the return to normal operationsafter the emergency

2.8.2. Responsibility of the Communications Coordinator

 Wait for instructions from the Main Controller.

 Ensurethatoutsidefirefighters are called (if necessary). This can be done using either the
front desk phone or the mobile phone clearly indicating the NAME AND ADDRESS OF
THE SITE LOCATION and the NATURE OF THE EMERGENCY (Fire, Chemical Spill,
etc.).

 If the phone lines do not work, send the companyvehicle to notify the FireDepartment.

20 | P a g e
 If the vehicle, machinery, etc. are not available, seek help from neighboring businesses.

 Maintain contact with the Emergency Coordinator and the Fire and Safety Coordinator for
the requirement of Ambulance Services or company vehicles needed to sendinjured people
to the doctor.

 Meet the firefighters on theirarrival and informthem of the state of evacuation of the Site
and of the location and type of emergency.

"THE COMMUNICATIONS COORDINATOR IS THE ONLY OFFICIAL SPOKESMAN


AUTHORIZED TO DEAL WITH EXTERNAL AGENCIES"
(Governmentauthorities)

2.8.3. Responsibilities of the Incident Controller

 Check the initial situation on the sites.

 Evaluate the level of intervention required.

 Call the Senior Manager, if applicable, whowillbecome the Principal Controller.

 Call and inform the emergency public services if necessary.

 Direct the evacuation of people and shutdown of the plant, if necessary.

 Direct operations at the scene of the incident.

 Set up communication between the incident scene and the incident control center.

 Keep in touch with the Communications Coordinator for the requirement of Ambulance
Services or other transportation.

 Inform the Main Controller on arrival.

2.8.4. Responsibility of Incident Response Team Members

The role of the operational teams is to implement the technical means necessary to control the
emergency situation.
 Fightfires and control spills

 Give first aid

 Search for the missingperson and rescue personnel

 Shut down plant and energized equipment, isolate materials and move equipment

 Provide emergency power and lighting

 Manage assembly points and emergency exits, and instruct staff to assemble there.
21 | P a g e
2.8.5. Responsibility of Site Supervisors

 Immediatelyinform Senior Officials.

 Seek help from the Security and Safety Service.

 Assess the situation and ordergeneralevacuations.

 Save trapped / injured people and organizetheir First Aid.

 Stop operations in a safemanner after consulting the Principal Incident Controller and
attempting to control the emergency.

 Direct the firefighting team to the causes of the fire and to areas where water
cannotbeapplied.

 Check the direction of the wind and whetherthereis a danger to others; inform the Incident
Controller and others.

 Record all evidence.

 Keep control of the situation until the arrival of Senior Officials. Submit a detailed report to
them.

 Coordinate roll call and transfer of injured to hospital in a timelymanner.

2.8.6. Site personnel

When witnessing an event, each person present on the site will be responsible for:

 Report the information to hissupervisor;

 Without putting your own safety at stake, intervene on a flame start using the extinguishers
available;

 Without jeopardizing your own safety, secure the accident area where the injured persons
located.

 Alert the first-aidworkers at work.

2.8.7. First aid, firefighters and police

First aid, firefighters and the police can intervene in the event of a major disaster on construction
sites, such as extinguishing a fully developed fire, helping victims, or, for the police, apprehending
possible intruders who may represent a threat. They also act on the external consequences to protect
residents from the current incident.

22 | P a g e
2.8.8. Subcontractors

Subcontractors and theirsupervisors are assimilated to EPC site personnel. Theirrole in providing
information and responding to emergency situations isidentical to everyone in the project.

2.9. EMERGENCY RESPONSE PROCEDURES

The following emergencies have been identified as potential emergencies at the site during
construction.

 Fire& Explosion.
 Accidents related to the Installation / Machines / Vehicle.
 Collapse of Structures.
 Gas leak.
 Spill of Chemicals.
 Natural calamities (Storm, Earthquake, Lightning, etc.).
 Fallfrom a Height.
 Civil unrest.
 Medical Evacuation.
 Missing Person.

General guidelines
1. Do not panic.
2. Do not approach the incident site as a spectator. However, stay at home,
unlessotherwisespecified.
3. Do not engage in communication channels / phones except to deal with the emergency.
4. Don't move unnecessarily.
5. Keep your guests / visitors away from the site.

23 | P a g e
24 | P a g e
2.9.1. Emergency signalingflowchart

Emergency situation
1. Fire& Explosion
2. Incidents related to the Installation / Machines / Vehicles
3. Collapse of Structures.
4. Gas Leak.
5. Spill of Chemicals.
6. Natural Calamities.
7. Fallfrom a Height.
8. Civil unrest
9. Medical Evacuation

Front line engineer


Mr. Rajeshwar Sao - 06 10 05 915
Mr. Nishant Kumar - 06 10 05 412
Mr. Avdesh Kumar - 06 10 05 415
Mr. Sandesh Kumar - 06 10 05 416
Mr. ManikAic - 06 10 05 409

Head of Administration Head of HSE Project Manager


Mr. Agnelo Pereira Mr. Aneesh Kumar. S Mr. Sujit Kumar Jha
Mob: 06 10 05 417 Mob: 06 01 83 319

Ambulance / First aid Head of Corporate


Emergency Vehicle HSE
Mr. Ndong
Mob: 06 64 44 995
Police station /
Firefighters Client / Consultant

Inform relatives of
the injured

25 | P a g e
2.9.2. Fire

Minor : A minor fireis a small, localized fire that can beeasily and safely extinguished using
portable firefighting equipment.
Major : A major fireis a firewhichcannotbeeasilycontrolled by the use of portable extinguishers
and whichrequiresthat an emergency bedeclared.

2.9.2.1. Emergency response plan for a minor fire

 Thosewhodetect the fireshoutloudlyfire, fire, fire or in the regionallanguage and willtry to


put out the fire. At the same time, theywillberequired to move closer to the nearest trigger to
sound the alarm. Duringthis time, otherswill arrange to join in and inform the
concernedSupervisor / Engineer and the FireDepartment.

 The person on site shouldformthree groups immediately and act as follows:


o 1st group: One or two people should use a fire extinguisher to extinguish the fire.
o 2nd group: Must bring the fire extinguisher close to the site / area to supplement the
firefighting equipment and close to the site for emergency use.
o 3rd group: removes the burning materials from the neighboring site, keeps the main line
de-energized in the event of an electricalfire and notifies the main emergency controller,
Assistant Security Guard / Security Guard indicating the site of the event and
burningmaterials / incidents, etc.

 People not involved in firefightingshouldreach the assembly point closest to the area
wherethey are.

2.9.2.2. Action plan for a Major fire

If it spreads to an uncontrolled situation, the steps below should be followed,

 The witness should immediately report to the Principal Controller.


 The Principal Controller must immediately inform the nearest Fire Brigade.
 All fuel lines supplying the fire or at risk should be isolated by members of the incident
response team.
 In addition, team members will remove combustible materials near the area affected by the
fire.
 Security will direct people aroundfire to move at a safe distance (200 meters).
In the event of a potential danger to the communities, the specific measures in chapter2.9.11.2. also
apply.

26 | P a g e
2.9.2.3. Fire emergency procedures

General standard fire alert procedures


The instructions for personnel for alerting in the event of minor or major fires are as follows:

I. Remember the actions to be performed seen in training and exercises.


II. Intervene quickly without haste or sudden gestures.
III. Report any type of fire to the security / fire department immediately afterwards.
IV. Trigger the alarm.
V. Know / recognize the signals and messages of the hand.

General standard fire response procedures


Guidelines for personnel when fighting minor or major fires are as follows:
I. Identify the audible firealarm signal.
II. Remember the actions to be performed seen in training and exercises.
III. Intervene quickly without haste or sudden gestures.
IV. Identify the location of the nearestfireextinguishers.
V. Try to protect surrounding roperties fromexposure to fire.
VI. Try to keep the area up wind away from heat, smoke or gas.
VII. Know / recognize the signals and messages of the hand.
VIII. Do not enter aplace if you cannot exit easily.
IX. Try to shut off the power source in case of an electrical fire.
X. Move away from excessively smoky areas and stay low, this is where the oxygenis.
XI. Use the extinguisher within its effective range.
XII. First extinguish the fire on the ground and continue to the source if itis up.
XIII. Never direct a water jet at a Type B, C and D iefire of oil, gasoline, electrical, machine fires,
reactivechemicals and metals.
XIV. If the firecannotbecontrolled by the extinguishers take a safe position by immediately
informing the fire department and wait for them to arrive in a safe place.
XV. Make sure the fire is completely extinguished.
XVI. After extinguishing the fire, collect the used powder and debris as far as possible and
dispose of it properly.

27 | P a g e
General standard fire evacuation procedures
The guidelines for personnel during evacuation in the event of a minor or major fire are as follows:
I. Remember the actions to be performed seen in training and exercises.
II. Intervene quickly without haste or sudden gestures.
III. Recognize hand signals / messages.

IV. Do not enter aplace if youcannot exit easily.


V. Switch off all equipment and gear before evacuating.
VI. Evacuate the area to the assembly point closest to its area.
VII. Do not leave the assembly point until authorized by a supervisor.
VIII. Staylow, that'swhere the oxygens.

2.9.2.4. Special case of firefollowing an explosion

In the event of a fire due to the explosion of highlyflammablematerialssuch as gasoline, LPG, etc.,
the followingproceduresshouldbefollowed:

 Anyone who has witnessed the incident should immediately report the situation to the
Designated / Alternate Person (see Annex III: Emergency Reporting Flow chart) regarding
the extent of the fire and the exact location of the accident.
 The designate / deputy immediately takes charge of the situation and informs the
othermembers of the central command team. The Central Command, in turn, willinform the
administrative office, first aid, fire brigade, hospital, police, etc., and alsoimmediatelynotify
the internalauthority and the team to take charge of the situation.
 Members of the incident response team immediately rush to the location. Devices required
by the initial team such as high powered torches whistles and helmets with identifying
marks must beavailable in the administrative office and they must bebrought to the site and
provided to the members.
 All fuel lines feeding the fire or endangered must beisolated. If possible, all combustible
materials in the vicinity of the fire location should be removed. People around a fire should
also be moved to a safe distance (200 meters). The area will be cordoned off for the moment
and handed over to the experts (firefighters) after their arrival.
 Clear the approach road for the Rescuer, the Fire Department and the Ambulance to access
the location to rescue and protect the injured. Immediately send the seriously injured to
hospitals and the remaining injured will be taken to the first aid center for initial treatment
and advised for further treatment in hospitals, if necessary. The Rescuer will provide CPR if
the victim is unconscious.
28 | P a g e
 Once the fire is completely extinguished, the visual inspection should be performed by the
security service.
 At the end of the formalities, workers and machines must be organized to remove debris and
restart work.

29 | P a g e
2.9.3. Personal accidents involving machinery or vehicles

If the incident is major, the Principal Controller (Project Manager) will declare it as an emergency
and the EPC emergency response system will act respectively.

EMERGENCY ACTION
1. Go quickly to the emergency site hearing the alarm and / or the emergency message.
2. In the event of a lifting devicecollapsing, anyonewho has witnessedit must immediately
report the situation to theirsupervisor on the extent of the incident and the location of the
accident.
3. The supervisorwillinform the othermembers of the central command team.

4. The central command team shouldalsoinform the administrative office, first aid, fire brigade,
hospital, police, etc. to take charge of the situation.
5. Clear the approach road for the Rescuer, Fire Truck and Ambulance to access the location to
rescue and protectinjured people.
6. Immediately takes seriously injured people to hospitals and others injured will be taken to
the first aid center for initial treatment and advised for furthertreatment in hospitals, if
necessary. The rescuer will provide CPR if the victimis unconscious.
7. If necessary, use a crane, etc. to immediately remove aging material if someone is trapped
underneath.
8. The EPC security service must attend the scene of the incident, cordon off the area and
preventunauthorized entry by others.

30 | P a g e
2.9.4. Collapse of building, hangars and structures etc.

Guidelines for the person who is locked inside the collapsed building
1. Position your self immediately under tables, desks or other items that will provide protection
from shards of glass and debris. If you are in a building that is experiencing full or partial
collapse, use your best judgment to determine whether it is safer to evacuate the building
immediately or to take cover and stay in the building.
2. If you are in an affected building and itissafer to evacuate, immediately evacuate the
building, advising others to do so when you leave. Evacuate in the direction as close to the
affected area as possible. Do not use the elevators. Help injured people as long as you are
able to do so. Once outside, go to an area at least 300 meters from the building.
3. If a bombmay have caused the explosion during the collapse (there may have been an
anonymous call, priorthreats, a context of litigation with malicious groups, etc.), do not
activate the alarms / siren. Fire because it could detonate other bombs.
4. Do not block accessroads or parking lots adjacent to the building, as emergency personnel
may need them.
5. Whenyou are able to do sosafely, call the Main Controller and the Incident Controller.
6. Do not enter the affected building untilyou are instructed to do so.

If the incident is major, the Principal Controller (Project Manager) will declareit as an
emergency
and the EPC emergency response system willactrespectively.
Emergency response
I. Immediatelyinform the nearestfire station and police department.
II. Clear the access for the free flow of rescue vehicles.

III. The rescuer must also rush to the scene and immediatelysend the seriously injured to hospital.
The other injured will be taken to the first aid center for initial treatment and advised for
further treatment in hospitals, if necessary.
IV. The rescuer will provide CPR if the victimisunconscious.
V. Use an emergency vehicle and any other vehicle available for hospitalization of injured
persons.
VI. Use all our devices / vehicles / EDM for rescue imprisoned staff.

VII. If available, enlist the help of construction crewsworkingnear the project.


IX. Do not allow a seriously injured person to be moved unless there is an immediate life-
threatening situation (eg, fallingdebris)

31 | P a g e
2.9.5. Gas leak

A minor gas leakis a small volume leakthat can be easily contained, affecting only a small area. For
gas cutting, the EPC will use an LPG cylinder. Gas escaping from the LPG cylinder poses an
explosion hazard.

Emergency response procedure:


1. Notify the Incident Controller to report a gasleak.
2. The incident controller will report this to the main controller.
3. Members of the Incident Response Team will evacuate operatives and others.
4. If outside, staff and operatives will move in the wind against odors.
If the situation could result in danger, the Principal Controller must declare an emergency and
he must immediately in form the nearest fire department.
Guidelines for persons at the time of gas leak detection:
I. Uponentering the site / building, if yous smell gas, turn off the regulator and wait until the area
is clear. Ventilation will help him considerably.
II. Never look for a leakwith a match. Use soapy water, and if youfind a leak, immediatelyshut off
the power.
III. Pay close attention to leaking liquid propane and butane. Severe burn scaused by freezing will
occur on contact with the liquid.
IV. If a cylinder is leaking fluid while it is lying on its exterior, hold the cylind eruprigh tbefore
closing the cylinder.
V. If a line isint errupted and the power cannot be removed, the line cans be crimped with a pair of
pliers.
VI. A leak that cannot be stopped can often be cut by binding the area with a damp cloth. This will
freeze and temporarily prevent further leakage. Use thick gloves during this attempt.
VII. If itis not possible to stop the leaking cylinder put it in a safe place outside, keeping people and
ignition sources at least 20 metersaway.
VIII. In the event of a fire around a cylinder, make sure the cylinder stays cool by spraying itwith
a stream of water.
IX. If a cylinder valve cannot be closed and the gas is burning, keep the cylinder cool by throwing
it out, but do not attempt to extinguish the flame as the build-up of flue gases may explode if
re-ignited.
X. Never try to ignite a gas leak.

32 | P a g e
2.9.6. Natural disasters (storm, earthquake, lightning, etc.)

2.9.6.1. General guidelines

 Go quickly to the emergency site upon hearing the alarm and / or the emergency message.

 Set up work teams with available people, made up of fire fighters, security guards. The work
team should perform the following tasks:
1. Clear the approach road for the fire department and ambulance.
2. Evacuate injured people for medical treatment.
3. Control traffic around the emergency site.
4. Organize to save people, property and materials.
5. Ensure the availability of an adequate water supply at the incident site. Disconnect
electrical power to the emergency site, if necessary in consultation with the Incident
Controller.

2.9.6.2. Storm procedure

Site manager / engineer will take the following actions in the event of a storm:

 Obtain the regular weather forecast report from the relevant authority

 All height related work should be stopped if the wind speed is 32 km / h or 20 MPH or
greater.

 If he receives a warning in the event of a strong wind, then he must ask a special team to
secure the loose objects.

 Ensures that buckets, ladders, maintenance materials and the like are to bekept in a safe
place.

 Factories should be shut down and equipment should be placed in safe positions / locations.

 Electrical equipment must not beused, it must be de-energized.

 All lifting operations must be suspended.

 The crane boom must belowered& the crane must belocked.

 Work at height must be suspended and all workers must be placed in a safe place.

 All building materials i.e. beams, pipes, electrical equipment, etc. which cannot be moved to
a safe place, must be secured in the best possible way.

33 | P a g e
2.9.6.3. Lightning strike procedure

In the event of storm activity generating lightning in the local area, the following work activities
should be stopped immediately:

 Work at height

 Work in exposedoutdoor areas

 Crane work (booms and masts must belowered)


Within the limits of practice — and for guidance only — if you hear thunder; you are within
striking distance. The following precautions should be observed:

 Be shelteredfrom a substantial building and avoidtall or steel structures.

 Look for low ground and avoid high or open areas. If you are on high or open ground,
crouch close to the ground with your feet close together.

 Avoid sheltering under trees, especially isolated trees.

 Avoid touching or staying near any metallic object such as mobile installation, towers and
power lines / poles).

 Avoid the use of telephones.

 Unplug TV / radio antennas and unplug electronic equipment.

 Storms are fast approaching; distances can be estimated using 0.62 miles (1 kilometer) at 3
seconds between lightning and thunder.

2.9.6.4. Procedureduring an earthquake

 Warnings issued by government agencies will be communicated on site by the


communications coordinator.

 All Chefs / Engineers / Shift Employees will be alerted.

 An emergency vehicle will be available on site.

 The Emergency Response Team willbe on alert.

 After an earthquake, a visual inspection of the structures should be performed to assess any
material damage.

 After an earthquake, the entire scaffolding structure shouldbe re-inspected by a scaffolding


inspector.

34 | P a g e
If you are in a car:

 Pull-over to the side of the road in an open area.

 Avoid bridges, overpasses, buildings, underpasses or anything that could collapse.

 Buckle up and stay in your car.

 Do not attempt to get out of your vehicle if electrical wires have fallen on it. Wait for help.

 If you need help, put a "Help" sign in the window.

2.9.7. Response plan in the event of a fall from a height / serious injury

 The affected person must not be moved in the event of a fall from a height and suspected of
having a back injury.

 First aid (ABC approach) for anyother injuries sustained should be provided at the site.

 The injured can only be moved by members of the emergency response team if thereis a risk
of an accident on the victim.

 She will be made comfortable by removing her shoes, loosening her clothes and giving her
water to drink.

 A vehicle will immediately be called and the stretcher gently lifted and placedinside the
vehicle.

 At the same time, the doctor with whom the on-site visit was made, the permanent
arrangements should be discussed over the phone and he should be informed of the patient's
condition and should be ready to receive the patient.

 A responsible person must accompany the patient to the hospital. Remember, too many
people don't help and are more of a nuisance.

 All other people concerned will thenbeinformed by the fastestmeans.

 The work must bestopped; all personnel must collect and receive a toolboxhighlighting the
reasons for the accident, the failures that have occurred and the corrective actions to
betaken.

2.9.8. Civil unrest / Violence

If there are persons in or near company property with suspected intent to cause property damage,
injury to project personnel, disruption of normal operations, etc. The information will be
communicated to the SAG community liaison officer and to the security company responsible for
securing the site and the equipment. The following steps will be taken:

35 | P a g e
 In the event of an attack on the site / camp, do not assemble at the assembly point, try to stay
hidden wherever you are, awayfrom a window (under your bed in your room, turn off the
light and do not make noise)

 The site / camp must be kept secure at all times and access by unauthorized personnel is
prohibited.

 Passes / ID cards will be verified by security on site and in the camp.

 The security shift supervisor will be responsible for providing related details and law
enforcement will be notified by the communications coordinator, if necessary.

 Service personnel or other personnel as indicated in the project personnel emergency


notification list will be called upon to be vigilant.

 The security shift supervisorwillordersecurity to close and lock all entrance doors to the site.

 The security shift supervisor will order security to close and lock all entrance doors to the
site. It will be guaranteed that no unauthorized person is authorized to access the site without
positive identification by the security personnel of the door and according to the instructions
given by the Head of Administration / Head of Security.

 Emergency vehicles will be ready.

 The medical emergency response team and the fire and security team willbealerted.

 The communications coordinator will also communicate the emergency panel to


Headquarters for the evacuation of the country (if necessary).

2.9.9. Snake, scorpion or insectinjury

As the projectisprimarily a bare land project, therewillbeseveral occasions whereworkerswill enter


areas which are the source of living grounds for certain dangerousanimals. Snakes, scorpions and
insects commonly infest these areas. Therefore, workers maybe at potential risk of bites or stings.

General guidelines for a bite or sting:

 Wash the wound and keep the area lowerthan the heart, calm the victim and takethem to the
hospitalimmediately.

 Loosen tight clothing, minimize use of infected end. Do not try to remove their clothes
because by moving to do so, it will cause the movement of the venom along the blood
stream. Use a gutter if necessary to immobilize it.

 Lightly compress the bandage at the end above the wound. The bandage should be very
tight.

 Clean itwith a sponge and save the sponge for later testing.

 Wash with soap and water if available after secretions.

36 | P a g e
 Dress the wound.

 Take the injured person urgently in an ambulance to a Doctor or to the Hospital.

 General measures to takeintoaccount:


o DO NOT allow the person to exercise excessively. If necessary, take the person to
safety.

o Do NOT apply cold dressings to the bite or sting.


o DO NOT cut the bite or stingwith a knife or blade.
o DO NOT try to aspirate the venom.
o DO NOT giveanything to the victim by mouth.
o DO NOT give stimulants or medications to the person unless a doctor tells you to.
o DO NOT elevate the bite or sting area above the person'sheart level.

2.9.10. "Missing person"

A person is considered missing when they are absent fromwheretheyshouldbe and no one
knowswherethey are.

Confirmation procedure if a person is missing.

 Check the person's support plan, area newspaper, or other relevant sources to see if the
personis at a pre-arranged meeting or appointment.

 Askother people during the day or residential service if the person has toldanyonewherethey
are going.

 If this information is not recorded, inform the HR manager of the day or his assistant,
whothenbecomes the researchcoordinator.

 Inform all persons in the immediatevicinity.

 A full search of buildings and grounds should eorganized immediately.

 Inform the nearest village / community chief.

A persondisappearsduring an outing

 Look for the immediate area

 Ask the spectators and guardian for help if the personis in danger if they are alone

 Notify the manager and staff of the day as well as their parents / guardians.

A persondoes not arrive at his day shift

37 | P a g e
 Contact the person's place of residence to find out wherethey are

 If thereis no response, contact their usual means of transport to find out if the person has
been picked up or dropped off.
If the missed person is not found and no explanation is forth coming, the person is confirmed as
"missing"

If a person is confirmed as "missing":

 The Manager or Person responsible for the daybecomes the ResearchCoordinator.

 The ResearchCoordinator calls all available staff, includingthosefromotherregions, to


includethem in a research team.

 The Research Coordinator coordinates with the members of the research team and
designates the areas to be researched.

 An extensive search should take place.

 The Research Coordinator must remain in place during the day or in the residential area and
remain reachable by telephone

 Depending on individual circumstances, the research team may require some or all of the
following:
o A fully charged flashlight in the case of a missing person after dark.
o Warm blanket or silver rescue sheet
o Potable water

o First Aid Kit.

 The manager (also the ResearchCoordinator) of the day or residence service must inform the
parents / guardians of the person.

 If the missing person is not found after the search, immediately notify the nearest police
station.

When the person is found:

 The Research Coordinator must be informed immediately

 The Research Coordinator must then inform:


o All members of the research team
o The person's family / guardian.
o All relevant staff

38 | P a g e
o The Manager, the Hierarchical Executive

 The person should be medically examined by the rescuer on duty and a doctor if necessary.

 If a new medical referral or hospital transfer is indicated, this should be arranged and the
person'sfamily / guardian should be informed.

39 | P a g e
2.9.11. Crisis management methods with internal / external interference

2.9.11.1. Serious injury of a local resident

A local resident can beinjuredduring contact with the site, for example:

 By collision with a light or construction vehiclenear the site or in the event of an intrusion;
 By collision withan out of control construction machine;
 By a projection towards the outside of the site;
 By the effects of an uncontrolledfire.
In the event of a medical emergency involving a local resident, take the person out of danger and
first inform the person in charge of the emergency medical team. The first aid attendant available on
site will assist the injuredperson (s) and provide first aid, in accordance with the definedprocedure.
If an emergency ambulance isrequired, call the nearest SAMU or hospital,

2.9.11.2. Case of a fire generated on the site that could impact resident soutside the
site

By site wemean:
 The construction site of the Transgabonaise.
 The life bases located at PK-50 and PK-95.
A fire occurring on the construction site or on one of the life bases can, if itis not controlled,
generate dangerous effects on the population. To prevent this risk, in order to protect populations as
quickly as possible, the following measures will be deployed:
 A security perimeter will be set up around the site;
 The nature and extent of the perimeter will be worked out by the operational fire
intervention team, with regard to the location and size of the fire;
 EPC people will be placed around this perimeter to preventany local residents from entering
the perimeter.

2.9.11.3. Case of an event outside the site thatcould impact the personnel inside the
site

A procedure will be established between each site of the construction site (the road, life bases, etc.)
and the administrative point of attachment with the local authorities.
This procedure will be the object of defining the modalities according to which the sites will be
warned in the event of external events which could impact the site (for example a fire outside the
site, the appearance of civil disturbances…).
Communication will be by landline or mobile phone between the local authorities and the EPC
manager of the place concerned.

40 | P a g e
Procedure in case of COVID positive workers 19 :
 A worker presenting the symptoms of COVID 19 (fever, cough, headache, sore throat and
respiratory discomfort) coming for a consultation in our infirmary;

 The latter is systematically tested for COVID 19 ;

 If the patient is positive to the COVID 19 test, he is systematically quarantined;

 Isolation is done in an outside hotel in accordance with national regulations;

 A curative treatment is prescribed to him and he follows it from his quarantine area;

 Access to the premises is forbidden to unauthorized persons during the entire quarantine
period;

 The person concerned is provided with a sufficient quantity of masks, a hand washing
device, sanitary control including coughing/sneezing, temperature, etc. ;

 In any case, the premises will only be used again after this disinfection.

 A record is kept and documented of the screening data.


Response to suspected covid-19 cases
It will be requested to follow the national/local protocol for how to manage persons suspected of
having symptoms of COVID-19.

41 | P a g e
2.10. DESCRIPTION AND LOCATION OF ROUTES AND MEETING POINT
One or more assembly points will be defined for each construction site. The chosen location (s)
must meet the following criteria:
 Provide enough space to accommodate all workers;

 Stay away from any source of danger (aggravation of the fire, traffic outside the site, etc.);

 Access must be easy, secure and free of all obstacles at all times.

 Meeting points will be identified on the project site and clearly marked with signage.

 Signswillbeplaced to indicate the direction to the assembly point from different work areas.

The assembly point on the PK-50 life base isindicated on the ground plan below:

Emergency Control Room


Meeting Room

Assembly point 2
Assembly point 1

42 | P a g e
2.11. CONTROL LIST
A list of the safetye quipment applicable on the site and their storage locations is provided in the
Emergency Control Room (cabin / project manager's office).
The intervention equipment must be operational at all times. To keep the equipment in good
workingorder, regular checks must be carried out. The material to be checked is that shown in the
following tables:
 Technical resources internal to the project for the rescue of the wounded (2.6.1.2. )

 Fire extinguishers available on site (2.6.2.1. )

 Internal communications resources made available (2.6.4. )

 Other internal equipment made available (2.6.5. )


The checks carried out will be mentioned in a register kept up to date.

In the event of an anomaly, the equipment concerned will be immediately repaired or replaced.
Defective material will be immediately disposed of in the garbage so that it is not used by mistake.

2.12. TRAINING AND RETRAINING

2.12.1. Emergency situations training

The EPC will conduct regular prevention trainings sothat all staff and workers are aware of
emergency situations and the procedures to befollowed, in order to minimize the impact on staff and
communities.
Employee emergency response training will cover the following topics:
 The function and elements of the emergency response plan.

 Types of potential emergencies.

 Notification, warning and communication procedures.

 Emergency responseprocedures.

 Evacuation & Assembly.

 Use of current safety equipment.

2.12.2. Exercises

Capacities to manage emergencies will be developed through necessary simulation exercis


esrepeated periodically.
The exercises will take the form of different scenarios, including:
43 | P a g e
 A regularfire drill (every month);

 A simulation of a worker or local resident accident repeated every month;


Exercises will be carried out periodically on each site. The HSE officers will be responsible for
planning these exercises and analyzing how they unfolded. The exercises make it possible to check
the knowledge by the workers of the measures to be adopted in the event of a Fire.
In addition, the exercise can be repeated jointly with local firefighters and local authorities.
During the exercises, the points to check are the following:
 Each act or knows his` role and reacts appropriately to the emergency situation encountered,

 The human and material resources necessary to resolve the emergency are available in
sufficient number and in the right place;

 If the exercise was carried out jointly with the emergency services and the public
authorities:thereis good coordination between internal and external actors;

 The emergency was resolved quickly;


An observer for this simulation exercise will be appointed, he will submit an observation report, an
example of which is provided in the Appendix.
Following the exercise, the “Simulation exercise analysis report” form will be completed in order to
be able to analyse its progress. It may be necessary to repeat the exercises as soon as an
insufficiencyisobserved, and thenperiodically.

2.13. MAINTENANCE AND RESUMPTION OF ACTIVITIES AND EMERGENCY


PLANS

During the emergency, the activity on the site concernedmaybefully or partiallymaintained, or it


must becompletelyinterrupted.
The decision rests with the management of the EPC, depending on the level of emergency.
At the end of the emergency situation, in the event of a partial or total interruption, the total activity
can only resume when the conditions defined in chapter 4 will beverified.

44 | P a g e
3. ENVIRONMENTAL EMERGENCIES

3.1. GENERALITIES

3.1.1. Goals

This plan aims to implement the necessary measures in order to anticipate all the situations that
would cause an emergency situation such as an accidental spill of hazardous materials or wasteinto
the environment at the level of work sites or work areas. parking or guarding.
This plan will make it possible to have adequate human and material resources in order to reduce
the intervention time and thus limit the accident to the smallest possible area. This plan helps to
limit the impacts on the biophysical environment and to limit the indirect impacts on the natural
environment, in particular the impacts on health and on ecosystems.

3.1.2. Measures

This program will:

 Train operators in case of emergency response. These trainings will giverise to special
training sessions;

 Describe the pollution control equipment that will be put in place by companies at
storagesites: anti-pollution kits, safety data sheet, etc. ;

 Certify the availability of the necessary equipment in the event of an intervention in an


emergency situation;

 Describe the planned organization in the event of an intervention (internal and external
notification procedures, responsibilities, decision-making process, emergency exits and
post-accident operations);

 Describe the coordination of planning with a view to informing the public,


responseorganizations, indicating first aid and emergency medicaltreatment, and
finallyreviewing and updating the response plan in the event of a emergency regularly to
takeintoaccount all the realities on the ground. Ensure that this information is communicated
to employees;

 Implement a system of community awareness, notification and participation (nature of


project operations, preventive measures implemented, description of possible scenarios and
effects on the environment, behavior to be adopted in an emergency);

 Establish a register of accidental spills and contaminated soil as well as responses to


emergency situations.

45 | P a g e
In case of contamination:

 Identify the cause and rectify it;

 Identify the source, carry out tests, analyze the results and deduce whether any measures
need to be taken (exceeding thresholds, etc.);

 Perform a detailed risk assessment;

 Implement measures to reduce, eliminate or limit one or all three risk factors (contaminants,
receptors and routes of contamination)

 Implement risk management measures throughout the project;

 Raise awareness and protect personnel who will work near contaminated areas.

3.2. SPEAKERS

The main stakeholders for the management of emergency situations within the emergency response
team are:

 The Principal Controller (Project Manager) is responsible for all aspects of emergency
preparedness and response during operations;

 The Communications Coordinatoris the only official spokes person authorized to deal with
external agencies;

 The Incident Controller;

 Members of the Incident ResponseTeam;

 The HSE Director;

 The HSE Engineer;

 On-Site Supervisors;

 Site personnel and all employees;

 Senior Officials, the Safety and Security Service, any local and administrative authority
involved or not at different levels of information depending on the nature of the emergency
to be managed;

 Intervention and rescue services (external fire fighters), depending on the nature of the
emergency to be managed.

46 | P a g e
3.3. ENVIRONMENTAL RISKS

The main crisis situations identifiedduring the construction phase likely to impact the environment
and requiring the implementation of intervention and emergency procedures is listedbelow:

 Chemical or hydrocarbonspillfrom fuel and hazardouschemicalstorageunits, fuel and


hazardouschemical tanks and cans, refuelingvehicles, etc.
This list will be constantly updated according to the news of the site.

3.4. DEFINITIONS

Internalresources: resources made available by the EPC within the framework of the project.
Externalmeans: publicmeans.
Danger: Source likely to cause injury and healthproblems.
Hazardouschemical: Chemical productthat has propertiesthatmayharmhuman or animal health, the
environment, or that can damage property.
HazardousMaterial : Any item or agent (biological, chemical, radiological and / or physical)
thatmay cause harm to humans, animals or the environment, either by itself or by interaction
withotherfactors.
Impact: The activities of road projectswill have environmental and social impacts, suchas:
atmospheric pollution, soil contamination, concentration and sedimentation of suspendedsediments,
loss of habitat, increasedrisksassociatedwith road traffic, job opportunities.
Incident: Event occurring as a result of or in the course of workwhichcould or doesresult in
pollution, injuries and illhealth.
Spill: Dropping or dropping (something), sinking or going over the edge of a container,
usuallyaccidentally.

47 | P a g e
3.5. MEANS OF PREPARATION

3.5.1. Classification of spills

A spillincludes, but is not limited to, any of the following:


 The release of chemicalsintosoil or water fromstorage, vehicles or anyothermeans of
containment;

 The discharge of sedimentintowater;

 The discharge of contaminated water into the ground;


According to the EPC procedure, spills are reported in the followingtwocategories:
 Small spills <10 L

 Large spills > 10 L

3.5.2. Preparation of resources

In order to facilitate the implementation of response operations in the event of an environmental


emergency, and therefore in order to ensure efficiency and speed, various technical and
organizational measures will be implemented on each of the sites of construction.

Table13 - Preparation of resources for environmental emergency preparedness


Theme Preparatorymeasures
 Clearlyidentified on the site
Means of  Accessible at all times
intervention  Available in sufficientnumbers
 Checked and maintained
 Clearly visible
Warning means
 Checked and maintained
 Displayed at strategic locations on the site
Emergency numbers  Clearly visible
 Updatedwheneverneeded

Means of  Permanentlycharged
communication  Available in sufficientnumbers
Staff  Trained and regularlytrained
Weather data  Daily monitoring of weather data and storm warning

48 | P a g e
3.6. MEANS OF INTERVENTION

3.6.1. Human resources

Human resources internal to the project


The human resources internal to the project involved in handling an environmental emergency
generated by site activities are listed in the following table:
Table14 - Human resourcesinternal to the project for the response to an emergency
Qualification Roleduring the emergency Phone number

Main Controller 06 01 83 31 906


Project Manager
10 05 400

Head of HSE Area accesscontroller 06 10 05 417

Engineer / Coordinateoperations and To befilled in


Environmental Manager procedures by EPC
Security agents Unauthorized entry control and 06 64 32 658
barricades.

Human resourcesexternal to the project


The human resources external to the projectdirectly involved in handling an emergency generated
by site activities, and managing the emergency situation, are listed in the following table:
Table15 - Human resourcesexternal to the project to help the injured
Qualification Phone number
Police 177
Firefighters 18

49 | P a g e
3.6.2. Technicalmeans

The technical means internal to the project directly involved in handling a spill generated by site
activities are listed in the following tables:
Table16 – Technical resources internal to the project for the rescue of the wounded
Type Number Location
Oil Station/Hot mix
and batching
Anti-spill kit 10 plant/Workshop

50 reflectivevests
25 bluesafetyvests
18 orangesafetyvests
Personal Protective Equipment (PPE) 15 bluehelmets
Oil Station/Hot mix
(pants and jacket clothes, mask, glasses, 75 yellowhelmets and batching
gloves, boots, etc.) 20 greenhelmets plant/Workshop
350 pairs of gloves
150 safetyshoes Fuel
Station/Power
Plant/Workshop
0
Mobile pumps

Plastic bags (2) Oil station /Hot mix


Manual equipment
brushwithhandle(1) and batching plant/
(brushwithhandle, shovel, polyethylene bag) Workshop
Office/Warehouse/
First aid kit car/ Oil Station /Hot
20
(pharmacy box) mix and batching
plant/Workshop
Oil station /Hot mix
Sand buckets 4 and batching
plant/Workshop

3.6.2.1. Anti-spill kit

Small spills will be cleaned up using the availables pill prevention kits. Used spill kits and
associated bags and PPE should then be disposed of in the appropriate garbage cans (thesewastes
are generally hazardous).
To eliminate soil pollution, priority will be given to the part of the soil where the greatest amount of
chemicalsisfound. Thus, the first few centimeters or evenmeters of soilmayneed to beexcavated, and
the pollutedsoil must thenbetreated as hazardouswaste.
Spill kits willbe made available to all locations wherehazardousmaterials are used and
storedsothatthey can beeasilydeployed in the event of a spill. Having clean-up kits in high-risk areas
givesworkers the toolstheyneed to containspillsquickly, reducingwaste and improving clean-up
time.
The spill kit willcontain at least:

50 | P a g e
 Absorbent materials (papertowels, cleaning pads, cleaningsocks)

 Throwawaybagswith tape or twist ties

 Poly propylene dust pan and broom

 Waste container

Examples of anti-spill kits

3.6.2.2. Personal Protective Equipment (PPE)

Personal protective equipment, including clothing, should be provided to enable workers to safely
mop up spills. The extent of this PPE must beadapted to the spillslikely to been countered. Personal
protective equipment will be at a minimum:
 A protective mask for the forehead,
 Waterproof glasses;
 Gloves resistant to chemical attack (corrosive);
 Boots;
 Respiratory mask (corrosive, toxic);
 Clothing, jacket, coveralls and / or pants resistant to chemicalattacks (corrosive, toxic);
 Self-containedbreathingapparatus (ARI).
Emergency equipmentrequired, with the exception of spill response kits and PPE, mayinclude, but
are not limited to, first aid kits, pictorialsigns and stickers, hand tools. hand, pumps, etc.
A check list of minimum stocks of PPE to be supplied by the employer is provided in the Annex.

3.6.2.3. Otherequipment

Mobile pumps
Mobile pumps will be available to collect any liquid contained in the secondary containment, to
allow evacuation and proper treatment of the pumped liquid.
Manual equipment
Manual equipmentshouldbeavailable to pick up the spill and pollutedsoil:
 Handlebrush;
51 | P a g e
 Shovel ;
 Polyethylene bag.

3.6.3. Means of communication and transmissions

In a crisis situation, the necessary resources will be made available to:


 Communicate with internal and external people involved in the management of the incident;

 Follow the news live from the incident control center.

Table17 - Internal communications resources made available


Means Number Characteristics Location
VHF / HF radio 0

Mobile phones 70 CUG


Everywhere
Satellite phones 0
Talkie Walkie 0
Television 2 Everywhere

Radio station 1 Everywhere

52 | P a g e
3.6.4. Emergency resources

This plan should be updated if thereis a change in any of the contact persons / contact number.
Table18 - Name and contact number of the on-site emergency response team
Last name Designation Roleduring the emergency Contact no.
Mr. Sujit Kumar Jha Project Manager Main Controller 06 01 83 319/06
10 05 400
Mr. Agnelo Pereira Head of Communications Coordinator 06 10 05 406
Administration
Mr. AneeshKumar.S Head of HSE Fire zone accesscontroller 06 10 05 417
Mr. AangeEngonga Environment Environmental engineer
Manager
Mr. Vasudevan T. N Plant Manager Installation of facilities and equipment 06 10 05 412
Mr. Jerome Security agent Unauthorized entry control and 06 64 32 658
barricades.
Mr. NdongBitome First aid First aid 07 75 79 264/06
Lucien 64 44 995
Contact details of externalagency in Gabon.
Police 177
Firefighters 18
Ambulance 177
Medical services
Army Instruction Hospital Military Hospital, PK-9, Libreville +241 11 79 00 00

Board19 - Telephonenumbers of EPC staff


Last name Designation Contact no.
Mr. Sujit Kumar Jha Project Manager +241 610 05 400
Mr. Agnelo Pereira Head of Administration +241 610 05 406
Mr. AneeshKumar.S Head of HSE +241 610 05 417
Mr. Nishant Kumar Plant Manager +241 610 05 412
Mr. Rajeshwar Sao QA / QC Manager +241 610 05 915
Mr. Jerome Security agent +241 664 32 658
Mr. Avdesh Kumar ExecutionEngineer +241 610 05 415
Mr. Sandesh Kumar ExecutionEngineer. +241 610 05 416
Mr. ManikAich Sr. SurveyingEngineer +241 610 05 409

3.6.5. Variousmaterials

Table20 - Otherinternalequipment made available

53 | P a g e
Means Number Characteristics Location
160 KVA
415 Volts Hot mix plan / Pont
Generator 2
bascule
Brand Stamford
Emergency lighting 0

Emergency Lamps and


0
Torches

3.7. ORGANIZATION OF INTERVENTION AREAS

3.7.1. Command centers

The Emergency Control Room of an emergency situation depends on the importance of the level of
emergency triggered.
The project meeting room has been identified as an Emergency Control Room.
The following items are provided in the Spill Control Center:
01. Site plan showingevacuation routes and assembly point and access routes.
02. List of emergency contacts, numbers of key project personnel and other external agencies
such as the Gabon Fire Department, Ambulance, etc.
03. List of safetye quipment applicable on the site and their storage locations.
04. Details of the fire station.
05. Emergency power ON / OFF.
06. Hand lamps / emergency torches, Hand alarms.
07. Details of the surroundingcommunity, including the telephone numbers of village and
township chiefs.
The location of the office of the EPC Project Manager is indicated on the plan of the base-camp
located at PK-50.

54 | P a g e
Emergency Control Room
(Meeting Room)

3.7.2. Waste storage areas

The residues collected following the spreading recovery operations will be stored in a predefined
area on the site, and evacuated as waste.
Non-hazardous waste will be collected in designated bins and handed over to an external body
authorized to dispose of it.

For hazardous waste, an authorized external company will then be hired for treatment and disposal.

3.7.3. Medical posts

Thoseinjured as a result of a spill will be taken to the first aid center for initial treatment and
advised for further treatment in hospitals, if necessary. As soon as the necessary first aid means
prove to bein sufficient, the person will be redirected to hospitals.

3.8. ROLES AND RESPONSIBILITIES

The roles and responsibilities of the emergency response team are outlined below.

3.8.1. Responsibilities of the Principal Controller (Project Manager)

55 | P a g e
 Control and lead the overall situation from the incident control center

 Inform the Partner of the changeover of the project in a crisis management situation

 Coordinate the action with the Incident Controller

 Call and inform the emergency public services if necessary

 Direct the evacuation of people and stop construction activities if necessary

 Use key operational staff

 Continuouslyreview and assess possible developments

 Communicatewith public emergency service agents

 Keep an emergency register

 Issue statements to employees and public media

 Control the return to normal operationsafter the emergency

3.8.2. Responsibility of the Communications Coordinator

 Wait for instructions from the Main Controller.

 Ensure tha toutside fire fighters are called (if necessary). This can be done using either the
front desk phone or the mobile phone clearly indicating the NAME AND ADDRESS OF
THE SITE LOCATION and the NATURE OF THE EMERGENCY (Fire, Chemical Spill,
etc.).

 If the phone lines do not work, send the company vehicle to notify the Fire Department.

 If the vehicle, machinery, etc. are not available, seek help from neighboring businesses.

 Maintain contact with the Emergency Coordinator and the Fire and Safety Coordinator for
the requirement of Ambulance Services or company vehicles needed to send injured people
to the doctor.

 Meet the fire fighters on their arrival on site and informthem of the evacuation status of the
Site and the location and type of emergency.

"THE COMMUNICATIONS COORDINATOR IS THE ONLY OFFICIAL SPOKESMAN


AUTHORIZED TO DEAL WITH EXTERNAL AGENCIES"
(Government authorities)

3.8.3. Responsibilities of the Incident Controller

 Check the initial situation on the sites.

56 | P a g e
 Evaluate the level of intervention required.

 Call the Senior Manager, if applicable, who will become the Principal Controller.

 Call and inform the emergency public services if necessary.

 Direct the evacuation of people and shutdown of the plant, if necessary.

 Direct operations at the scene of the incident.

 Set up communication between the incident scene and the incident control center.

 Keep in touchwith the Communications Coordinator for the requirement of Ambulance


Services or other transportation.

 Inform the Main Controller on arrival.

3.8.4. Responsibility of Incident Response Team Members

The role of the operational teams is to implement the technicalmeansnecessary to control the
emergency situation.
 Fightfires and control spills

 Give first aid

 Search for the missingperson and rescue personnel

 Shut down plant and energizedequipment, isolatematerials and move equipment

 Provide emergency power and lighting

 Manage assembly points and emergency exits, and instruct staff to assemble there.

3.8.5. HSE Director

 Developrules and best practices for the project in order to avoidspillsduring construction
work and monitor itsimplementation and compliance

 Review the spill risk assessment and suggest improvements that should be incorporated into
the assessment

 Organize training in spill prevention and response

 Investigate any spill occurring on the site;

 Manage and control situations arising during a spill emergency. Continuously review and
update the spill response procedure

 Maintain all records and reports relating to spill incidents and responses.

57 | P a g e
3.8.6. HSE / Environment Engineer

 Maintain all records and reports relating to spill incidents and responses.

 Train staff, including subcontractor personnel, on appropriate emergency and spill response
procedures;

 Establishment of spill control kits and their maintenance as well as PPE and hand
toolsnecessary to control, contain, absorb and dispose of materials associated with spill
response.

 Immediate notification (verbal and written letter) to the customer of any spill that has
occurred on the site.

 Proactively engages in post-spill reviews and corrective actions.

3.8.7. Responsibility of Site Supervisors

 Immediately inform Senior Officials.

 Seek help from the Security and Safety Service.

 Assess the situation and order general evacuations.

 Save trapped / injured people and organizetheir First Aid.

 Stop operations in a safe manner after consulting the Principal Incident Controller and
attempting to control the emergency.

 Direct the fire fighting team to the causes of the fire and to areas where water cannot be
applied.

 Check the direction of the wind and whetherthereis a danger to others; inform the Incident
Controller and others.

 Record all evidence.

 Keep control of the situation until the arrival of Senior Officials. Submit a detailed report to
them.

 Coordinate roll call and transfer of injured to hospital in a timely manner.

3.8.8. Site personnel (all employees)

When witnessing an event, each person present on the site will be responsible for:

 Report the information to his supervisor.

58 | P a g e
 Be able to correctly use the spill control kits, which will be made available in sufficient
quantity at strategic locations.

 Participate in exercises and workouts.

 Report to the controller any unsafe or unhealthy conditions or any defect in the installations
or equipment.

3.8.9. First aid, firefighters and police

First aid, fire fighters and the police can intervene in the event of a major disaster on construction
sites, such as extinguishing a fully developed fire, helping victims, or, for the police, apprehending
possible intruders who may represent a threat. They also act on the external consequences to protect
residents from the current incident.

3.8.10. Subcontractors

Subcontractors and theirsupervisors are assimilated to EPC site personnel. Their role in providing
information and responding to environmental emergencies is identical to everyone in the project.

59 | P a g e
3.9. EMERGENCY RESPONSE PROCEDURES

A spillis an accidental release of chemicals or grease into the surrounding environment (ground,
parking lot, construction site, water, etc.). In situations where it is not possible to contain a spil
limmediately, and in a safe manner, itis the responsibility of responders to clean up and report any
spill.
Spill prevention will be the first line of defense to prevent releases to the environment. Many of the
identified mitigation measures will be covered by standard professional working procedures or good
practices. The main sources of spills identified during the construction phases are:

 Storage of liquid products;

 Activities involving materials;

 Transfer of liquid products;

 Waste disposal.
The following emergencies have been identified as potential emergencies at the site during
construction.

 Spill of Chemicals

3.9.1. Procedure in the event of a productspill

According to the EPC procedure, spills are reported in the followingtwocategories:


 Small spills <10 L

 Large spills > 10 L


The following diagram akes it possible to classify the type of spill (Minor / Major) according to the
quantityreleased, the nature of the substance and itspotential impact on the environment:

60 | P a g e
Spill of
Chemical product

Can the substance


cause a fire?

Can the
quantityreleasedgen
erate
a danger ?

Can the spill impact the


environment or
beunconfined?

The substance
isitverytoxic?
(eg Mercury)

SpillMAJOR
MINOR spill

Figure 3 - Reaction in the event of productspillage


3.9.2. Emergency signalingflowchart

Emergency situation

1. Spill of Chemicals.

Front line engineer


Mr. Rajeshwar Sao - 06 10 05 915
Mr. Nishant Kumar - 06 10 05 412
Mr. Avdesh Kumar - 06 10 05 415
Mr. Sandesh Kumar - 06 10 05 416
Mr. ManikAic - 06 10 05 409

Head of Administration Head of HSE Project Manager


Mr. Agnelo Pereira Mr. Aneesh Kumar. S Mr. Sujit Kumar Jha
Mob: 06 10 05 417 Mob: 06 01 83 319

Ambulance / First aid Head of Corporate


Emergency Vehicle HSE
Mr. Ndong
Mob: 06 64 44 995
Police station /
Firefighters Client / Consultant

Inform relatives of
the injured

62 | P a g e
3.9.3. Chemical and oilspill

A spillis the accidental release of a chemical / oil (hydrocarbons) into the surrounding environment
(ground, parking lot, workshop, body of water, etc.). A spill should be cleaned up using this
procedure in cases whereit cannot be safely and immediately contained, or if any material enters the
drain, enters the ground, or mayevaporate. In the event of an oil spill in the water body,
immediately start the gully suction cup and move the flexible hose over the spill in the water body.
It is the responsibility of incident response teams to clean up and report anyspills.
In the event of a chemical / petroleum spill in / or outsideour site or in the water body, the site
emergency response team will be alerted to handle the situation in a safe and legal manner. You
willneed to consult the manufacturer's instructions and refer to the safety data sheet

Emergency response procedure:


I. If this is possible without putting yourself in a position of danger, it is necessary to try to cut
off the source of the leak.
II. Notify the Incident Controller to report a chemical leak.
III. The incident controllerwill report to the Principal Controller.
IV. Response team members will begin to prevent the spread of chemicals and clean up spills.
V. If the situation could lead to danger, the Principal Controller will declare it as an emergency
and immediately inform the nearest fire department.
Response to chemical and oil spills during transport:
I. Carefully drive a bulk tanker to a pre-identified open space.
II. Warn people to be at a safe distance. Close the area or restrictit with markup.
III. If the spillis of a flammable chemical (HSD), do not allow any activity that may cause a
spark in the vicinity of the spill.
IV. If this is possible without putting yourself in a position of danger, it is necessary to try to cut
off the source of the leak.
V. Extinguishany open flames nearby.
VI. If the spilled chemical is toxic in nature, do not stand upwind. Evacuate people in the
direction opposite to the downwind to the crosswind and the direction of the winds.
VII. If it's possible; Without endangering life, try putting sand in the event of a spill or using a
containment kit. This will help disperse the spills in a controlled manner.
VIII. Stop all traffic on the road coming into the vulnerable danger zone.
IX. If there are burned / poisoned injuries, referthem to the nearby hospital.

63 | P a g e
Action taken at the on-site diesel tank :
Ensure that all applicable regulations or guidelines regarding the storage of petroleum products are
followed.
At the time of installation, we will take the following measures:
- The tank implementation area must be easily accessible by vehicles (transporters, firefighters) to
facilitate product ingress and egress and response
- Avoid flood plains and areas with a shallow water table.
- Consider soils with a high rate of water infiltration that present a significantly increased risk of
groundwater contamination.
- Place the tank on an impermeable platform that can contain the volume of the tank to compensate
for any failure, it includes a channeling of river water that transits to a tank de-oiling;
- Equip the diesel storage site with two spill kits, fire extinguishers and sand trays

- Train site operators on the use of spill kits and fire extinguishers
- Post safety instructions and guidelines for all persons on the storage site

3.10. TRAINING AND RETRAINING

3.10.1. Training in environmental emergency management

The EPC will conduct regular prevention training so that all staff and workers are aware of
emergency situations and the procedures to be followed, in order to minimize the impact on the
environment.
Employee emergency response training will cover the following topics:
 Intervention training to stop a leak in progress.

 Training in the use of spill kits.

 Training in identifyinghazardpictograms and knowing which substances are compatible or


not with each other.

3.10.2. Exercises

Although the exercises are used for training purposes, their primary function is to test the adequacy
of the plan, available resources, equipment and the readiness of personnel. Exercises are a very
effective way to check the effectiveness of training and to make improvements by correcting
deficiencies found during practice.

64 | P a g e
Regular exercises must be carried out in order to involve as many people as possible, in various
situations. Before the exercises, briefings could be organized in order to recall the main principles
and to highlight the last modifications. Below are examples of exercises to organize:
 Situation of loss of confinement.
 Grouping exercise.
 Functional exercise.
 Evacuation drill.
 Complete exercise.
An exercise report is provided in the appendix.
For these exercises, different types of scenarios will be considered in particular:
 Small hazardous chemical spill (<10 L);
 Large spill of hazardouschemicals (> 10 L);
 Spillsgreaterthan or equal to 200 L;
 Spills in the terrestrialenvironment;
 Spill on a watercourse.
Response personnel will respect the following response priority:
 Environmental Protection ;

 Preservation of humanlife;

 Preservation of property.
Immediately after each exercise, a meeting isorganized to analyze and highlight all the positive and
negative points, to establish an action plan and to define any updates to the ERP.
The HSE director is responsible for:
 Exercise reports and organization of debriefing sessions;

 Analysis of exercise results and updating of the ERP if necessary.

3.11. MAINTENANCE AND RESUMPTION OF ACTIVITIES AND EMERGENCY


PLANS

During the emergency, the activity on the site concerned may be fully or partially maintained, or it
must be completely interrupted.
The decision rests with the management of the EPC, depending on the level of emergency.

65 | P a g e
At the end of the emergency situation, in the event of a partial or total interruption, the total activity
can only resume when the conditions defined in chapter Error! Reference source not found.Will
be verified.

4. INCIDENT MANAGEMENT PROCEDURE

4.1. INCIDENT DECLARATION (WITH LOCATION)

At the end of the emergency, a form will be used for the declaration of emergency situations. An
example of incident reporting and monitoring is given in the Appendix.

4.2. MONITORING THE EFFECTS OF THE INCIDENT

4.2.1. Monitoring the effects of a fire

Following a fire, it is necessary to check whether structures have not been damaged, so that their
stability would be likely to compromise the safety of workers.
Depending on the case, in-depthstudies carried out by a specialistwillbe carried out for a more
detailed expertise.

4.2.2. Monitoring the effects of an accident on an employee

Following an accident involving an employee, it is necessary to check the health of this person after
returning to the site, if necessary after a period of sick leave. A suitable medical follow-up can be
set up on thisperson, carried out by a doctor.
The objectis to check that this person is recovering well following their accident, and to avoid a
relapse.

4.2.3. Monitoring the effects of a conflict with local residents

Following a conflictual relationship between a site and the residents, mediation will be set up in
order to maintain a regular dialogue, in order to ensurethat all the subjects of tension are well dealt
with in the short, medium and long terms.
This mediation unit willinclude at least:
 The EPC crisis management unit;
 A representative of the residents;

66 | P a g e
 The district chiefconcerned.
This mediation unit will be maintained as long as necessary.

4.2.4. Monitoring the effects of an environmental incident

Following an environmental emergency, itisnecessary to verify the absence of residual pollution in


the soilthatcould spread in waterways in particular.
Depending on the case, in-depth studies carried out by a specialist will be carried out for a more
detailed expertise.

4.3. PROPOSAL OF A REMEDIATION PLAN AND MODIFICATION OF PROCESSES


IF NECESSARY

As soon as the emergency situation isfullyunder control, priorityisgiven to identifying the causes
and determining corrective measuresfor:
 Prevent the same situation from happening again;
 Improve the procedures for managing emergency situations.
This remediation plan willthenbeimplemented (Annex 2).
A report must bewritten by the EPC in order to take stock of the root causes thatled to the incident
occurring.

4.4. MONITORING OF THE IMPLEMENTATION OF THE REMEDIATION PLAN

The EPC maysubmit the followinginformation:


 Declaration of the implementation of mitigation measures;

 Declaration of compliance following a negativeassessment.


The monitoring of the remediation plan willbe carried out according to the process of
implementation and monitoring of corrective actions defined by the project'senvironmental and
social management system.

4.5. CLOSURE OF THE INCIDENT

The emergency isdeclared over when the followingelements are met:


 Monitoring of the effects of the incident concludesthatthereis no residualrisk;

 The emergency has been declared in accordance withthis emergency plan;

67 | P a g e
 A remediation plan has been determined and isbeingimplemented.
An incident isclosedwhen the remediation plan isfullyimplemented.

5. COMMUNICATION WITH LOCAL ADMINISTRATIVE AUTHORITIES

In an emergency situation, external communication (to externalagencies or governmentauthorities,


to the attention of the media and the public) is of particular importance. It must berigorous,
consistent, regular and proactive. It isimperativelybased on proven and factual information.
Communication within the EPC is the responsibility of the Communications Coordinator.
As communication vis-à-vis the outside of the projectisensured by the Partner, a communication
procedureestablishedwith the EPC allows the Partner to collect the necessary information on the
crisis situation and the associated management.

5.1. COMMUNICATION WITH THE MEDIA

Good communication, in particularwith the media (in the event of a major accident), makesit
possible to control the information provided to the public. Indeed, when the media have confidence
in the information theyreceive, the reports and articles about the incident are generally more
accurate.
In the first hours of the emergency situation, communication revolvesaround 3 main topics:
 The eventsthat have occurred;

 The message of compassion towardsaffected populations and communities;

 Actions initiated.
Subsequently, itendeavors to respond in anticipation to the questions and expectations of the media
and the public. A question / answer document must bedrawn up and kept up to date in this regard.
The information shouldbeneithertooalarmingnor excessive.
In times of crisis, communication with the media is the responsibility of the Communication
Manager.

5.2. COMMUNICATION WITH THE PUBLIC

It is important that the public, during an emergency, beinformed in the mostprecise and
regularmanner of the evolution of the situation.
To avoid confusion and misunderstanding, youshould:
 That thereisonly one spokespersonwhowillbe the Head of ExternalCommunication;

 That information beprovidedonly by reading official press releases.


68 | P a g e
 Inform the nearest village / communitychief.
A model for an externalpress release isprovided in Annex 3.

APPENDICES

69 | P a g e
ANNEX 1 -DECLARATION AND FOLLOW-UP
OF A HEALTH AND SAFETY EMERGENCY

70 | P a g e
CONDUCT OF THE EMERGENCY SITUATION

INCIDENT / ACCIDENT TITLE: DATE:

Message
Hour Message details / Events Comments
From: AT :

……… …………………… ………………… ………………………………………………………………………… ……………………………………


……… …………………… ………………… ………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………… ……………………
……… …………………… ………………… ………………………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………… ……………………………………
……… …… ………………… ………………………………………………………………………… ……………………………………
……… …………………… … ………………………………………………………… ……………………
……… …………………… ………………… ………………………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………………………… ……………………………………
……… …………………… ………………… ………………………………………………………… ……………………
……… …………………… ………………… ………………………………………………………………………… ……………………………………
……… …… ………………… ………………………………………………………… … ……………………………………
SITUATION EVALUATION SHEET

Objective: It allows at regularintervals to make an assessment of the situation on the ground

EDITOR: _______________________

EVALUATION DONE ON ___________________ at ______ H ______

TYPE OF LOSS AT THE ORIGIN OF THE INCIDENT (fire, materialfailure, etc.):

MEANS / DOCUMENTS
MISSIONS CONTACT PERSONS
REQUIRED

1 / Triggering the alert / taking up functions

2 / Assessment of the situation

3 / Definition of the strategyundertaken

5 / Preparation of Communication

6 / Take stock of the general situation


periodicallywith the variousinterlocutors

7 / Manage after the crisis

EQUIPMENT INVOLVED:

PLACE OF INCIDENT:

TYPES OF EQUIPMENT DAMAGE AND EXTENT:

NUMBER OF WORKERS AFFECTED:

NUMBER OF AFFECTED RIVERS:

RESOURCES ALREADY COMMITTED: _______________________________________

ADDITIONAL MEANS ALREADY REQUESTED:


______________________________________

ADDITIONAL MEANS TO CALL: ______________________________________


ANNEX 2 -IMPROVEMENT OF THE
EMERGENCY PLAN
EMERGENCY PLAN IMPROVEMENTS SHEET

A fulfillsbased on experience feedback from HSE situations encountered

ITEM ACTION BY TIME LIMIT


ANNEX 3 -FORMS FOLLOWING A
SIMULATION EXERCISE
SIMULATION EXERCISE ANALYSIS REPORT

SIMULATION EXERCISE AREA / LOCATION: ______________________


__________________

SCENARIO: _________________________________
DATED: _____ / _____ / _____

NAME & DESIGNATION OF OBSERVER: ___________________________

Serial
DESCRIPTION STATUS NOTES
No.

1 Emergency declared time (siren time)

2 First personreachingassembly area (time)

3 Last personreaching the staging area (time)

Total time (evacuation + directions) taken for the


4
simulation exercise (time)

5 Interventions of members of the emergency team

After the siren, the reaction and interventions of


6
people, etc.

7 Unobstructed emergency exit routes

8 Unobstructed emergency assembly area

State of availability of the First Aid Box and


9
medication

10 State of availability and first aid interventions

11 Fireextinguishersavailable in good workingorder

12 Availability and intervention of the firefighting team


SIMULATION EXERCISE ANALYSIS REPORT

Serial
DESCRIPTION STATUS NOTES
No.

All Air Conditioners, ElevatorSystems are in


13
shutdown state

Staff from all departments and workers support


14
duringheadcount

The securityinvolved in this simulation exercise and


15
the support is effective

16 Cooperation of electricianswith the emergency team

An emergency vehicleisavailable for emergency


17
purposes

For emergencies beyond the hospital, the


18
linkisavailable

If an emergency exit lighting system isavailable at


19
night

Electric panel mains emergency lighting system


20
isavailable

21 Number of missingpersons
SIMULATION EXERCISE ANALYSIS REPORT

DATED: _____ / _____ / _____

Nature of the simulatedcrisissituation:


Scenario reminder:

TOTAL DURATION OF THE SIMULATION EXERCISE: ________________________

TIME NECESSARY FOR EVACUATION: ______________________________


SIMULATION EXERCISE AREA / LOCATION:
______________________________________

CORRECTION TARGET RESPONSIBILITY

PLANNED CORRECTIVE ACTIONS TARGET RESPONSIBILITY


SIMULATION EXERCISE ANALYSIS REPORT (POSITIVE POINTS)

DATED: _____ / _____ / _____

SCENARIO: _________________________________
DATED: _____ / _____ / _____

NAME & DESIGNATION OF OBSERVER: ___________________________

POSITIVE ACTIONS OBSERVED AND TO BE ENCOURAGED NOTES

Summarysummary:
ANNEX 4 -LIST OF MINIMUM STOCKS OF
PPE IN THE EVENT OF A SPILL
List of minimum stocks of Personal Protective Equipment (PPE) in the event of a spill

MINIMUM STOCK OF PPE


No. EQUIPMENT
Initial
Availability Note
quantity

1 Pair of protective shoes

2 Safety glasses

Respiratory protection mask (corrosive,


3
toxic)

4 Pair of cottongloves

5 Pair of rubbergloves

6 Pair of leathergloves

7 "High visibility" vest / jacket

8 Pair of rubber boots

9 Protective clothing (Pants)

9 Protective clothing (Jacket)

10

11

Verified by : Logistics / Warehouse HSE

Last name

Dated

Signature
ANNEX 5 -IMMEDIATE SPILL DECLARATION
FORM
Immediatespilldeclarationform

Name of contractor: Report date: (DD / MM / YY) Report time (24 hourclock): (HH /
MM)
Name of the Signature: Date: (DD / MM /
individualdepositreport: YY)
Reception report Signature: Date: (DD / MM /
categoryname: YY)
Spills:
 NB:Anyspillinto a body of water must berecorded and reported to the operator.
 NB:Spillsgreaterthan or equal to 200 liters must bereported to the section Responsibilities of the
Mauritaniangovernment for spillresponse.

Report type Spill number

 Initial spill report s-


 Combined report (initial + closure) of spill s-
 Update spill report (provide original spillnumber) s-
 Spill Closure Report (provide original spillnumber) s-
Spill Include location descriptor AND name of nearestcommunity (i.e. village, town) NOTE: Must
location provide 2 location data elements
GPS
coordin Latitude: Longitude:
ates

Brief description of the spill incident, how ithappened, the source of the spill, etc. (25 words or less)

Type of materialspilled Specify the material (s) spilled

 Cooling of vehicle engines /


equipment

 Hydrocarbon solvent

 Solid chemicals

 Lubricants

 Acidic or caustic substances


 Liquidchemicals

 Dangerous waste

 Other substances

Spilled volume
Volume recovered (liters)
(liters)
Detailed description of the
Includedetails of the location, cause and duration of the spill, response actions
spill incident and response
taken, types of wastegeneratedduringspillresponse and cleanup, how and
/ clean-up measures (use
wherespillresponse and cleanupwastescleaning have been eliminated, new
additional pages if
preventivemeasures, etc.)
necessary)

Seeattached

Parties notified
about the spill
List all parties otherthan the operatorwho have been informed of the spill (eg local
(useadditional communities and governmentofficials). pleasecomplete all fields
pages if
necessary)

Name of notified Place of notified party


Dated Hour Information provided in the notification
party (Contact number)
Weekly spill report form

Name of contractor: Report date: (dd / mm /


yy)
Name of the individualdepositreport: Reference period: (mm /
yy)
Spills
 NB:Anyspillageinto a body of water must berecorded and reported to the operator.
 NB:Spillsgreaterthan or equal to 200 liters must bereported to the section Responsibilities of the
Mauritaniangovernment for spillresponse.

The total number of spills to record / report during the currentweek


Types of spill sites
Number of spills in a body of water (e.g., river, stream)
Number of spills in an open water body (e.g. lake, ocean)
Number of spills in marshes / swamps
Number of spills on land surface
Number of spillsinvolving fuels
Types of spilledmaterial
Number of coolantspills
Number of solvent spills
Number of spillsinvolvingsolidchemicals
Number of spillsinvolvinglubricants
Number of spills of acidic or caustic substances
Number of liquidchemicalspills
Number of hazardouswastespills
Number of spillsinvolvingother substances
Totals
Total quantity of materialspilled Total amount of materialrecovered
(liters)
 Include as an annex a summaryspreadsheetcontaining the following data concerning the spills to
berecorded / reported in the currentweek as well as the spill incidents stillactive:
No. Spill Date of Date of Type of Spille Volume of Volume of state
spill report locatio initial spillclosu spill dmate materialsp matter current
n spill re report (i.e. in rials illed recovered
report (DD / running (L) (L)
(DD / MM / water, in
MM / YY) open
YY) water, in
a swamp /
swamp,
on dry
land)
Name of
contractor
S-
Name of
contractor
S-
Name of
contractor
S-
Total
ANNEX 6 -SPILL PREVENTION AND
RESPONSE TRAINING FORM IMMEDIATE
SPILL DECLARATION
Spill Prevention and Response Training Form

Potential training topics for spillprevention and response:

- Use of PPE
- Recognizepictograms
- Using the spill kits
- ...

Training subject:
__________________________________________________________________

Date: __________________ Time: _____________ to _________________

Realized by : ______________________________________ Location :


______________________

PARTICIPANTS

Serial Last name Society Designation Signature


No

10

11

12

13

14

15

Signature of trainer: ___________________________


ANNEXE 7 – Agreement with the Hospital of
instruction of the armies of PK 9
ANNEXE 8 – Location plan for firefighting in the
logistics base of PK 50
key Plan

CLIENT:- INDEPENDENT CONTROL OFFICER :- CONTRACTOR :- TITLE:-


PROPOSED BASE CAMP (PK-50 RHS) Drawing No. CAD / DWG / AIL / 5267 /009
CONSULTING TRANSGABONAISE ROAD PROJECT-5267 Prepared by Reviewed by Approved by Scale Size Rev Sheet
AFCONS INFRASTRUCTURE LIMITED
ENGINEERS GROUP PROJECT:-
An ISO 9001:2008 Company AFCONS HOUSE, 16, SHAH INDUSTRIAL ESTATE, REHABILITATION & UPGRADATION OF 2-LANE
CEG Tower, B-11(G), Malviya Industrial Area, VEERA DESAI ROAD,ANDHERI(W), MUMBAI 400053 (INDIA).
NATIONAL ROAD RN1 FROM PK24+000 TO PK105+000
1:1500 A3 R0 1/1
Société Autoroutière Gabonaise Jaipur - 302017, Rajasthan India ( QAP / IS / 456-2000 / 6.5 )