GD-10 Senior User's Manual: GD-10 Series D.C. Geo-Electrical System
GD-10 Senior User's Manual: GD-10 Series D.C. Geo-Electrical System
Content
GD-10 Senior User's Manual.................................................................................................................. 0
Chapter 1 Unpacking Your New System......................................................................................... 4
Chapter 2 System Introduction..........................................................................................................4
2.1 Hardware system........................................................................................................................5
2.1.1 GD-10 mainframe...........................................................................................................5
2.1.3 Solid non-polarization electrode...............................................................................9
2.2 Software System.........................................................................................................................9
Chapter 3 Geomative Studio Operation........................................................................................10
3.1 Install Geomative Studio....................................................................................................... 10
3.2Register & Upgrade of Geomative Studio........................................................................ 12
3.2.1 Register Geomative Studio.......................................................................................13
3.2.2 Parameters Setting...................................................................................................... 14
3.3 Create project and test zone............................................................................................... 16
3.3.1 Create project................................................................................................................ 16
3.3.2 Create test zone............................................................................................................17
3.4 Create script............................................................................................................................... 18
3.4.1 Create 1D script............................................................................................................ 19
3.5 Upload file....................................................................................................................................22
5.5.1 Synchronized data........................................................................................................22
3.5.2 Upload project and zone file.................................................................................... 24
3.5.3 Upload script file........................................................................................................... 25
Click “Script” to switch to script interface..................................................................... 25
Chapter 4 GD-10 Mainframe Operation........................................................................................ 26
4.1 Turn on GD-10 & Adjust the screen brightness........................................................... 26
4.2 Setting environmental parameters................................................................................... 26
4.31D VES survey............................................................................................................................ 27
4.3.1 Set new 1D task............................................................................................................27
4.3.2 Data measurement...................................................................................................... 29
4.4 Data management................................................................................................................... 30
4.4.1 Download data from GD-10 mainframe to Geomative studio................... 30
4.4.2 Browse and edit data.................................................................................................. 31
4.4.3 Output data.....................................................................................................................32
Appendix 1 Connection........................................................................................................................33
Appendix 2 Solid non-polarization electrode instruction..........................................................34
Appendix 3 BP-145power source operation guide................................................................... 36
Appendix 3 BP-300 power source operation guide.................................................................. 40
0 / 38
ST Geomative Co., Ltd
Preface
GD-10 Series Geo-electrical System
GD-10 series is a new electrical geophysical exploration system with highly engineered
& cutting edge technology with a revolutionary change. It is promoted to market
focusing the best solution to meet emerging technological advancements, cost
affordability, flexibility in field practices, the greatest accuracy in geo-electrical
exploration, the enduring sustainability for a basic user to a progressive researcher.
GD-10 series supports 1D VES, 2D ERI and 3D ERT Resistivity/IP measurement, which
are the versatile geophysical method apply for a broad range of applications, as
groundwater and mineral exploration, infrastructure site investigations and so on.
GD-10 series divided into Basic, Advanced 2D, Supreme 2D, Supreme 2D Plus,
Supreme 3D and Supreme 3D Plus with different functions.
Note:
a. Low model support online upgrade to higher model;
b. Supreme 2D Plus can’t upgrade to Supreme 3D,vice versa.
Application:
Resources Prospecting
Environment Detection
Underground water detection
Underground pollutant change
Geothermal prospecting detection
Energy resource prospecting Seawater Intrusion Detection
Metal and nonmetal mineral Dam Detection
resources survey
Underground tank leak detection
Slope failure detection
Engineering Geology Exploration
City engineering exploration
Others
Cave exploration
Geological mapping
Pile foundation
Archaeology
1 / 38
ST Geomative Co., Ltd
2 / 38
ST Geomative Co., Ltd
Feature:
Can measure the resistivity, time domain induced polarization method (IP)
and spontaneous potential (SP);
High power, wide range, high precision;
Transmitter and receiver designed in one unit, light and portable;
The unique sub-level centralized cable system realized the electrode
switching by CL-10 cable leader, no electrode limit on measurement, which
features light, low cost and easy operation.
Using a unique scrolling technology, which can detects deeper than
comparable instruments with no repeated measuring point. And the
scrolling function is realized during detection, which improve the working
efficiency.
The data management platform, Geomative Studio, breaks through the
bottleneck of traditional embedded software, which enrich the software
function greatly;
Designed with built-in GPS, can accurately determine the measurement
coordinates;
Multi-electrode cable with bi-direction design and dual take-outs enable the
parallel electrodes for high power applications;
Powerful self-checking function for the high-quality data during
measurement, including Grounding R test, switcher test and cable leader
test.
Communication port for USB data transfer;
Real-time data valuation, the time window can be set in IP survey;
High reliability, security and robustness, can use in extremely harsh
weather.
3 / 38
ST Geomative Co., Ltd
Thanks for choosing Geomative GD-10 series. Please check after you receiving
the package, for any problem, please contact us or local agency in 14 days.
Transport box
GD-10 mainframe
USB cable
6A fuse
Charger
Charge/External power line
Catalog
U disc
4 / 38
ST Geomative Co., Ltd
Left Panel
Portable Handel
Shockproof Ring
Right Panel
Aluminum Case
5 / 38
ST Geomative Co., Ltd
Specifications
Transmitting
Max transmitting power: 3200W
Max transmitting voltage: ±800V
Max transmitting current: ±4A
Seal, over-voltage, reverse, lighting, leakage, high
Protection:
temperature, over current short circuit
Pulse: Square wave
auto, (Res)
Pulse width:
1, 2, 4, 8, 16, 32, 64s (IP)
Current precision: 0.3% ± 1uA
Input resistance: ≥100MΩ
Iteration: 1~255 times
IP measuring method: Full time domain
IP transmitting wave: Positive, off, negative, off
IP wave period: Available set in software
Receiving
Voltage range: ±24V
Voltage precision: 0.3% ± 1uV
SP compensation: ±10V (auto)
Frequency interference: ≧95dB (50Hz or 60Hz, option)
A/D converter: 24 digit
Polarizability precision: 0.30%±1μA
Other
Display: 5.7 inch full color LCD, with backlight, 640*480
A/B/M/N/∞, multi-electrode cable socket 1/2, charge,
Interface:
external power, USB, RS485
Storage: ≥8GB for about 4000,000 readings
built-in 16.8V lithium battery for continuously 24 hours
Battery:
work
Charging voltage: 100~250V (50Hz or 60Hz)
External power: 30V~60V
Working temperature: -10°C~+50°C
Storage temperature: -20°C~+60°C
Humidity: 95 %
Dimension: 39cm*20cm*29cm
Weight: 8KG
6 / 38
ST Geomative Co., Ltd
User Control Panel
LCD Screen:
640x480, 5.7 inch full color LCD
Note:
Please don’t press or draw the
screen to avoid damage.
7 / 38
ST Geomative Co., Ltd
Right Panel
Alarm:
The yellow area is high voltage one, forbidden to
DC Power Input:
operate on this area after power on.
For DC power input, “+”for
positive,“–”for negative
Note:
The max input peak voltage
is1200V。
M(P1) and N(P2): Forbidden to reversed
for potential electrode connection of “+” “–”
terminals, which will
damage the mainframe.
Left Panel
Nameplate:
basic information of GD-10
mainframe, including version,
factory date etc. RS485:
To communicate with
external device.
Ground: grounding interface.
1. It can prevent leakage Charging/External Battery:
wounded the operator when Charging interface
connecting an external high Note:
voltage power supply To connect charger.
To connect external DC
2. It effectively avoid the power source(30v~60v) for
influence of the internal charging.
interference of the mainframe to
the test results, especially in the Power:
field with high ground resistivity. Power on & off.
8 / 38
ST Geomative Co., Ltd
Usage:
For Res survey, it is used as
Material:Stainless steel both potential electrodes and
Weight:0.4kg current electrodes.
Length:40cm For IP survey, it is used for
current electrodes only.
9 / 38
ST Geomative Co., Ltd
10 / 38
ST Geomative Co., Ltd
Following prompt will pop up to remind you run as administrator in Win7, Win8,
Win10. Please click “Yes” to continue.
11 / 38
ST Geomative Co., Ltd
After installation successfully, the shortcut key will show in the desktop of PC.
12 / 38
ST Geomative Co., Ltd
3.2.1 Register Geomative Studio
Select “Manage – Device – Main View” to enter to the main interface of “device
management;
On the left device list, enter into “Online device-New device”, and right click to
register the mainframe. The progress window will pop up, waiting for about 15s,
the registration will success.
13 / 38
ST Geomative Co., Ltd
14 / 38
ST Geomative Co., Ltd
b. Local upgrade
Please download the current version program, upgrade tool and upgrade driver
through server firstly.
Connected GD-10 mainframe with PC through USB; the installation guide will
pop up after pressing knob key, F1 key and turn on GD-10 simultaneously. Click
“Next” and input X86 program path of driver.
15 / 38
ST Geomative Co., Ltd
After the hardware installation finished, double click “APP.bat” file of program
file, then the upgrade window will pop up and auto upgrade the mainframe.
After update completely, restart the GD-10 mainframe for new functions.
Finally, for both up methods, it is available to check the latest version
information in the device management.
Before operate the GD-10 mainframe, it needs to set project, script and so on in
Geomative Studio by PC firstly, then upload to GD-10 mainframe. Meantime,
the data of GD-10 also could be uploaded to Geomative Studio for data
management, the data format including DAT and Excel.
16 / 38
ST Geomative Co., Ltd
17 / 38
ST Geomative Co., Ltd
Two methods for option:
Choose “Manage-Project-Operate-Create zone locally”
Or choose project on left list, right click for “Create zone locally”.
Note:
if selects "1D VES / 2D ERT", the user can only
measure 1D VES test and 2D multi-electrode imaging
test; if selects "3D",the user can only measure 3D test.
18 / 38
ST Geomative Co., Ltd
On the left-bottom, there are three script menus as “1D VES”, “2D ERI”, “3D
ERT”, which could be switched freely.
19 / 38
ST Geomative Co., Ltd
Then, edit script file:
Input a = 1/2 * AB, half of the A (C1) and B (C2) distance of the current
electrode;
Input b = 1/2 * MN, half of the M (P1) and N (P2) distance of the potential
electrode;
Stacking – input the staking number of the measuring points, 1 to 100 for
option;
After input parameters, please click "Add" save.
If need to modify a record, please select it, input again and select "Update" , the
data will be replaced by the new one;
If need to delete a record, please select it and click "Delete";
After edit the script, select "OK" to save it; or select "Cancel" to delete it.
b. DIPOLE array
Firstly, edit the script head file:
Input the script name – no more than 20
characters;
Input the operator – no more than 20
characters;
Input remark – no more than 50
characters;
Select time – the fault is the date of
project establish; it also supports user
defined.
c. 3PVES array
20 / 38
ST Geomative Co., Ltd
d. RECTGL array
Gird
The horizontal offset coordinate of o’, which is the middle point of M(P1)
and N(P2).
The vertical offset coordinate of o’, which is the middle point of M(P1)and
N(P2).
Stacking- the stacking number of the measuring point, 1~100 for option;
21 / 38
ST Geomative Co., Ltd
Choose “Add”, to add one record in the script file.
e. Custom array
Firstly, edit the script head file:
Input the script name – no more than 20
characters;
Input the operator – no more than 20
characters;
Input remark – no more than 50 characters;
Select time – the fault is the date of project
establish; it also supports user defined.
x
y
K – Distance constant, which need calculated and input by manual.
Stacking- the stacking number of the measuring point, 1~100 for option;
Choose “Add”, to add one record in the script file.
22 / 38
ST Geomative Co., Ltd
Click “Ok”, the Geomative Studio will auto synchronize GD-10 mainframe. A few
seconds later, it will synchronize successfully.
23 / 38
ST Geomative Co., Ltd
Select “OK”, Geomative will upload project and test zone o to GD-10 mainframe
one by one. There is a progress prompt at each file uploading.
24 / 38
ST Geomative Co., Ltd
3.5.3 Upload script file
Click “Script” to switch to script interface.
In the list of “Script in local”, choose the script you need. Click “Download”,
Geomative will upload script one by one, there is a progress prompt at each file
uploading.
The script upload successfully will show in the list of “Script in device”.
25 / 38
ST Geomative Co., Ltd
Note:
The main interface is the start of all functions, you will finally back to the main interface by
press “ ”return key continuously at any interface.
26 / 38
ST Geomative Co., Ltd
Note:
Though Knob key, it is available to set following parameters:
“GPS Position”: choose “Update device for GPS”by knob key, then press “ ” menu key, pop
up the box, choose “Update Device”and confirm by knob key. GD-10 mainframe will auto search
GPS satellite and receive the GPS position; if failed, please repeat above steps.
“Weather”: 23 weathers for option, including sunny, overcast, cloudy, partly cloudy, light rain,
moderate rain, heavy rain, showers, thundershower, rainstorm, fog, haze, frost, violent storm,
typhoon, snowstorm, heavy snow, moderate snow, light snow, sleet, hail, floating dust, sand
blowing.
“Wind”: 8 winds for option, including north, northeast, east, southeast, south, southwest, west
northwest.
“Temperature”: the user can input through soft keyboard, the unit is Celsius.
“Humidity”:the user can input through soft keyboard.
“Rg Alarming Level”: the value could be set according to local geology. If the grounding R is
larger than this value, GD-10 mainframe will prompt “ the Rg is too large. Then the user can take
some measurement on decrease the grounding R.
“ Low power alarm” : if user set as “open”, it will prompt low power when the voltage of GD-10
mainframe is low.
27 / 38
ST Geomative Co., Ltd
28 / 38
ST Geomative Co., Ltd
After setting all above parameters, press “Save” key (F4) to finish the setting of
one new 1D task.
4.3.2 Data measurement
After setting new 1D task successfully, the pop box will disappear by press any
key except “Back” key.
Press F3 for data details
Roll the knob key can choose measuring point, choose one and press F4 for
measure. Then to measure one by one until finish the whole task.
After finish the task, choose one point and press Knob key can check the details
data of current point.
29 / 38
ST Geomative Co., Ltd
For 1D Res VES, it includes current, voltage, SP, R0(apparent resistivity) and so
on; for 1D IP VES, it includes current, voltage, SP, R0(apparent resistivity) and
polarizability (M0~M4).
30 / 38
ST Geomative Co., Ltd
Select a connected device, then choose the project and zone need to download
on the left “Project in device”, then the data file of the project and zone will
appear in the list of “Test data in device.
Choose the data file need, and click “ Add” to transfer to the list of “Test data to
be uploaded”.
Choose the data in “Test data to be uploaded”, then click “Upload”, the project
and zone file will be upload to Geomative Studio.
Note:
During upload, if click ““√” in the front of file box, it means the file will be deleted auto after
uploading.
31 / 38
ST Geomative Co., Ltd
Choose the data format needed, as Excel, and select the export path also, then
click “Done”.
32 / 38
ST Geomative Co., Ltd
The following window will pop up, finally confirm it, to export data.
Appendix 1 Connection
1D Res VES
33 / 38
ST Geomative Co., Ltd
Note:BP-145 and transmitting & receiving cable are optional items.
1D IP VES
electrode instruction
34 / 38
ST Geomative Co., Ltd
the original package.
7. If the solid non-polarized electrode works in dry field and the surface soil is
not humid, every 3~5 days dip the solid non-polarized electrodes into the
3-5cm high salt solution, 3~5 minutes later, pack the electrodes back into the
original package.
8. Every time field work finishes, put the solid non-polarized electrode into the
plastic bag to keep the water and stabilizer inside the electrode from volatility.
9. If the electrode is not to use for a long time, put the electrode into the
original package, and store it in shadowy and cool environment. If it is not to use
for about one month, dip it in a container filled with 3-5cm high saturated salt
solution, for 5 minutes, and then put it into the original package
10. The solid non-polarized electrode may fail to work because of lead reveal
of the electrode which is resulting from long-tern storage or improper use. In
that case, those two solid non-polarized electrodes are not allowed to be utilized
once again. Please replace them with new ones in time.
11. DO keep it in mind: the pair of DC-2 solid non-polarized electrodes should
be abandoned together. Non-polarized electrodes of two different pairs should
not work as a new pair.
35 / 38
ST Geomative Co., Ltd
operation guide
BP-145 is a new generation Digital DC Power Source. It can output 50V, 150V
voltage.
Fully sealed Aluminum Alloy Shell
Over-current protection and over discharge protection
Displaying work status intelligently
Control Panel is replaceable
Portable
Technical Specifications
Max output voltage: 150V
Max output current: 3A
Charging voltage:110V~ 240V AC
Output mode: DC output
Operating Temp: -10 ℃/+50℃
Weight: 7.5Kg
Dimension: L377*W299*H195mm
Material of Shell: GE Plastic
Fuse Size: 5.2*20mm
Appearance
36 / 38
ST Geomative Co., Ltd
Operation
Power "On"
Press “Power On” button to start BP-145
The LED Screen displays “0”.
The LED Indicator will keep green light flashing.
Note: Make sure the Output Switcher on the left-side panel is turn off.
37 / 38
ST Geomative Co., Ltd
Select Voltage
Set Voltage
Press “Set” key to confirm selected voltage.
The LED Screen displays the actual output voltage.
The LED Indicator will keep flashingred light.
Note: Make sure the Output Switcher is turn off when you set the output
voltage.
38 / 38
ST Geomative Co., Ltd
Notice
1.Voltage Low
When the LED Screen prompts "UL → Voltage", it signifies " voltage
is too low".Please charge BP-145 immediately.
Note:
If youuse BP-145 continuously in this situation. It might reduce the battery
performance and life.
In Low Voltage condition, BP-145 could be Power ON , only after complete
charging.
2.Charging
1. Connection
BP-145 can't be connected in parallel.
39 / 38
ST Geomative Co., Ltd
operation guide
Technical Specifications
Weight: 8Kg
Dimension: L377*W299*H195mm
40 / 38
ST Geomative Co., Ltd
Start up BP-300
BP-300 includes 2 groups power. Each group is fully with 52-54V power; if any
group with the power less than 42V, please charge it immediatly.
Caution: Control panel operation is disabled while self-testing
Connecting with GD-10 mainframe
Connecting the output interfaces of BP-300 and GD-10 mainframe with
connection cables. Red is positive; black is negative.
Attention:
Make sure BP-300 and GD-10 mainframe are turn off during connection
Place the equipment on the dry and flat ground to avoid equipment slips or hurt
by humans or animals.
Fobiddent to inverse connected BP-300 and GD-10 mainframe, which will
damaged the device and hurt the operator.
41 / 38
ST Geomative Co., Ltd
Select Voltage
Press “Select Voltage” to choose voltage, which show 50V, 150V in a circular
manner
Caution: When you select voltage, the “Battery Voltage” button is disabled at
that instance.
000.0 – Output voltage is 0V (without output),
50.00 – Output voltage is on 50V Level,
150.0 – Output voltage is on 150V level,
OFF – then press “Set” to turn off BP-145.
5
0
O
1
Several sets of BP-300 could be connected in series for high power output.
Please note the current must be no more than 3A, or it will broken the fuse.
2 sets connected in series is also available for extend power time.
Forbidden to connect several BP-300 in parallel.
Set Voltage
After select voltage, press “Set” key to confirm the selected voltage.
42 / 38
ST Geomative Co., Ltd
Voltage Low
When the LED Screen prompts "UL", it signifies " the voltage is too
low". Please charge BP-300 immediately.
In fireld survey, if the “Battery voltage”
UL → Voltage:
After choose 50V output and press “Set” , screen will prompt “UL-Voltage”
if power less tha 42V;
After choose 100V output and press “Set” , screen will prompt “UL-Voltage”
if power less tha 84V;
After choose 150V output and press “Set” , screen will prompt “UL-Voltage”
if power less tha 126V;
After choose 300V output and press “Set” , screen will prompt “UL-Voltage”
if power less tha 252V;
Caution:
Forbidden use BP-300 continuously with low power which will reduce the
performance and life.
The low temperatue (< 0℃)will reduce the real output power.
Charging
Turn off BP-300, then plug the charger to the socket on the
Left-side Panel.
Caution: Make Sure the red dots on the plug and socket sink together, then
push the plug.
43 / 38