Examination Report of Lifting Machine (Goliath Crane)

The examination report summarizes the inspection of three lifting machines - the Goliath crane, Hydra crane, and welding machine - at SRBH Motors factory in Madhya Pradesh, India. Key details provided for each machine include identification information, installation and inspection history, visual examination findings, test procedures and results. The inspections found the condition of each machine to be satisfactory, except the Hydra crane requires a new power switch.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views10 pages

Examination Report of Lifting Machine (Goliath Crane)

The examination report summarizes the inspection of three lifting machines - the Goliath crane, Hydra crane, and welding machine - at SRBH Motors factory in Madhya Pradesh, India. Key details provided for each machine include identification information, installation and inspection history, visual examination findings, test procedures and results. The inspections found the condition of each machine to be satisfactory, except the Hydra crane requires a new power switch.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

EXAMINATION REPORT OF LIFTING MACHINE (GOLIATH CRANE)

 Report No. RKCCJ/CD/09/21-22/785


 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Registration Certificate – Not Applicable
 PUC- Not Applicable
 Make- Santek Equipment Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model - SWL10T
 Serial No - 591
 Year of manufacturing- 2019
 Capacity – 10 T
Location At Plant /Factory

Date/year of installation of equipment at the factory 2019

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Double girder 10 Mt Capacity 12 m x 2
m one side overhang 5.75 m. Overall length 12.270m. and
Height 5.89 m Found during examination
 Load test Performed – Upto specified Limit
Details of test Performed
 Wire rope- Found in good Condition
 Mountings – Not Applicable
 Electrical System- Found OK
 Limit Switch – Ok
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
NA
previous repair or Remarks
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.

Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor
EXAMINATION REPORT OF LIFTING MACHINE (HYDRA)

 Report No. RKCCJ/CD/09/21-22/786


 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Registration Certificate – Not Avilable
 PUC- Not Available
 Make- Escorts Construction Equipments Limited
Description of Part, Component or Identity of the equipment
 Model – HYDRA 14
 Serial No - Engine No 5433A17727
 Year of manufacturing- 2010
 Capacity – 14 T
Location At Plant /Factory

Date/year of installation of equipment at the factory From Establishment of factory

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Boom Length 12.5 mtr.
 Load test Performed – Upto specified Limit
 Wire rope- Found in good Condition
Details of test Performed  Hydraulic System and brakes - Found Ok
 Electrical System – Found Ok
 Articulation – 45 Degree
 Max Speed 25 KM/hr
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or Power switch is required to separate the connection from
previous repair battery.
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.

Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/787
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10520M0051
 Year of manufacturing- 2020
Location At Plant /Factory

Date/year of installation of equipment at the factory 2020

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.

Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/788
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10514G0035
 Year of manufacturing- 2014
Location At Plant /Factory

Date/year of installation of equipment at the factory 2014

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/789
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10520M0043
 Year of manufacturing- Jan 2020
Location At Plant /Factory

Date/year of installation of equipment at the factory 2020

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/790
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10516M0093
 Year of manufacturing- Jan 2016
Location 2016

Date/year of installation of equipment at the factory From Establishment

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/791
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10519Y0067
 Year of manufacturing- Nov 2019
Location At Plant /Factory

Date/year of installation of equipment at the factory 2019

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF WELDING MACHINE


 Report No. RKCCJ/CD/09/21-22/792
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Thyristor Controlled MIG Arc Welding Machine
 Make- Panasonic India Pvt Ltd.
Description of Part, Component or Identity of the equipment
 Model – YD400KR2
 Serial No - D10514G0026
 Year of manufacturing- Sept 2014
Location At Plant /Factory

Date/year of installation of equipment at the factory 2014

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 3x3x3 Feet approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
 Rated Input -415V
Details of test Performed  Rated Out put – Rated current 0-400 AMP Rated Voltage 0-
34 V
 Mass- 150 Kg approx.
 PPE’S – Available
 Protection Shield - Available
 Earthing – Proper Earthened
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF CUTTING MACHINE


 Report No. RKCCJ/CD/09/21-22/793
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Inverter Based Plasma Cutting Machine
 Make- WARPP Engineers Pvt. Ltd.
Description of Part, Component or Identity of the equipment
 Model – AIRCUT-102I
 Serial No - FGCM000280621014200
 Year of manufacturing- 2020
Location At Plant /Factory

Date/year of installation of equipment at the factory 2020

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 2.5x 3.0 x 2.5 Feet
approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
Details of test Performed  Current Range – 30-100A
 Cooling Type – Air cooled
 PPE’S – Available
 Earthing – Proper Earthened
 SLI- Ok
 Control Switch Ok
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor

EXAMINATION REPORT OF CUTTING MACHINE


 Report No. RKCCJ/CD/09/21-22/794
 Reference No. Client WO No. SRBH/21-22/002 Dated 25.08.2021
 Next Due date of examination 02.09.2022

Name of Occupier of factory SRBH Motors (P) Ltd.

Address of the factory Delha Mod, Sarlanagar, Maihar Distt. Satna , M.P. 485772
 Inverter Based Plasma Cutting Machine
 Make- WARPP Engineers Pvt. Ltd.
Description of Part, Component or Identity of the equipment
 Model – AIRCUT-102I
 Serial No - FGCM000280621014300
 Year of manufacturing- 2020
Location At Plant /Factory

Date/year of installation of equipment at the factory 2020

Date of Last periodic examination made under factory Rules Not available

Examination Carried out by Not available


 Visual Examination – Space Occupied 2.5x 3.0 x 2.5 Feet
approx.
 Test Performed – As per Specification
 Electrical System – Wires and connection are found in good
condition
Details of test Performed  Current Range – 30-100A
 Cooling Type – Air cooled
 PPE’S – Available
 Earthing – Proper Earthened
 SLI- Ok
 Control Switch Ok
Date of test 02.09.2021

Result of test Satisfactory


Any defects , repair and malfunctioning at the time of test or
-
previous repair
We certified that on 02.09.2021. We thoroughly examined the above mention machine / equipments and that the above is correct
report of result.
Disclaimer: This report of examination reflects the condition of machine / equipments as on date. We do not accept any liability /
responsibility in case of any accident /mishandling on/with/due to this machine /equipment.

Authorized Signatory
Er.Ravindra Tomar
R.K. Consultancy and Contractor