You are the project manager (PM) for a development The situation req, The situation demands sharing
Effort spent on root cause analysis Prevention Cost
In a large development team, how often When they are finished
Which of the following is the main reason for establishing for later comarision
In which of the following scenarios should you All of the above
What is the frequency of collecting customer As and when received
In your project, you are working with multiple customer stakeholders. All the relevant
CSS is not applicable FALSE
The effort spent on preventing, detecting and Cost of quality
What is Quality 1 and 2
Organisation structure of TCS Quality Manual
An associate has joined as a Developer Agile Execution
Tacit knowledge can be shared All of these
you want to measure the effectiveness % Total Defect
End timeliness for the End Date Variance
Performance improvement technique define Customer
your customer has given a requirement Bayesuan Classifer Model
What model could be used by an Agile Agile Sprint Planner model
In your project the project plan covers All check boxes
A customer requested the ABC company Function point
the program is working as per the clean up the code by following
a good quality code : All of the above
in your project, you have come up with risk register
accept, transfer, avoid are valid TRUE
the recommended size and productivity FP and FP/ PH
Which of the following is not a sizing Monte Carlo Simulation
What are the three major facets of the Effort , Schedule , Size
which of the following best describes Cyclomatic Number of Independent paths
Timesheet All of the above
what are the three different means of preventing defects Ensuring team,using re-usable, using standards, referring best
identify whether the following " use of document / coding TRUE
you are managing a develpment project. high 3,6,1,4,2,5
which of the following items in your project weekly status report
which among the following could be the configurable all options except MoM
feedback from the customer through FALSE
in the ETVX model , X Exit criteria
onsite componets of the project FALSE
policy is guiding principles
which type of documents, available in iQMS wiki - variou lifecycle models Process handbooks
a customer has asked for data on the percentage % Defecr Free
match the following A-3,B-2,C-1
you are the project manager (PM) of a large development CoQ model
Some of the severs are running Capacity
you are about to start testing of Traceability
static code analysis tool can help TRUE
your project is in ithe integration all of the above
there are several steps in Risk Management Contingency
"Accept" is one of the When tit is best to deal
which of the following statements may be all of the above
which one is not a valid sizing methodology root cause analysis
which of the following parameters actual effort
the timesheet data is used all of the above
you are managing a large testing project brainstorming
which of the following things will help you to arrive Analysis of specific
all deliverables are configu TRUE
the customer had complained about the quality by sutomer interaction
your project has received CSS offline get the same uploaded
there are multiple projects in your account FALSE
iQMS inlcudes all options
a process ? all of the above
as part of knowledge transition, you are going save this in the cutomer network
bad fix referes an old fix which
match the following A-3,B-4,C-1,D-4
the project you are managing is on a tight use the cost optimizer
what are the different information classification Confidential, sceret, public, internal
what is the purpose of conducting the project to evaluate the current
at the beginning of your project transferred
where would you find the guidelines estimation guidelines
you spend two hours fixing a defect rework for review task
after delivering the software pareto Analysis
your project has got complaints 1,3,5,4,2
CSS is typically initiated at the end of the project or at the endof six months
while analysing the defects detected during an internal review estimaiton
which is the primary document to be referred by a induction manual
which iQMS document has the quality manual
size, effort and defect TRUE
your project has received a low customer rating a and b
customer specifies one of the requirements non- functional, interoperability
monitoring hels in ensuring that all options
you have prepared the Software requirement A,B and D
in static code analysis FALSE
the first step in risk management is to identify assumptons, depen
what all needs to be estimated for a project during all excpet price
your are trying to compute the 0.1 FP/ PH