Report
Report
VISION
An institution with a culture of excellence in developing globally competitive and values
oriented leaders and professionals.
MISSION
A premier institution committed to provide industry relevant programs that are anchored
on a culture of research and entrepreneurship for the development of Sorsogon and beyond.
CORE VALUES
L - Leadership
E - Excellence
A - Accountability
D - Discipline
E - Environmental Stewardship
R - Responsiveness to Change
S - Social Responsibility
i
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
3. To strengthen linkages with various local, national and government and non-government
agencies.
5. To utilize research outputs to improve community life through extension and productive
activities.
7. To inculcate ethical and desirable habits and attitudes; promote the arts and culture and
develop profound sense of social awareness and nationalism.
ii
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
Submitted to:
Submitted by:
Arjay O. Dollente
Bachelor of Science in Electrical Engineering
A.Y. 2020 -2021
iii
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
APPROVAL SHEET
This narrative report attached hereto entitled “A NARRATIVE REPORT ON ONLINE ON-
THE-JOB TRAINING”, prepared and submitted by Arjay O. Dollente in partial fulfillment of the
requirements in On-The Job Training, is hereby accepted and approved.
____________________
Date
iv
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
ACKNOWLEDGEMENT
This on-the-job training had been successfully finished by the intern through the help and
support of people who rendered their assistance in one way or another. The author would like
to extend his heartfelt and profound gratitude to the following:
First of all, the intern would like to thank his family for their tireless support in times of need,
financial and moral support. For encouraging the intern up to continue studying and giving
them guidance throughout the course of the training.
The intern would also like to express his appreciation to Mr. Leonilo D. Dollente for the help
in becoming the client of the intern.
And lastly, the intern would like to extend his gratitude for Mr. Jake Derilo and Mr. Jovenal
C. Barja Jr. for cooperation with the activity during the training.
Without the said people above, the project of the intern will not be a success. With the help
of these people, they made the project a reality and the intern can’t thank them enough.
v
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
DEDICATION
"This narrative report is heartfully committed to my family for the help, to individuals who
roused me to give an effort in the hands on preparing and completing this project, to God the
Almighty and to individuals and/or future interns who might mind understanding this."
vi
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
EXECUTIVE SUMMARY
This On-The-Job Training narrative report in contains the documentation of the project
to create an electrical plan made by Arjay O. Dollente to the house of his client Leonilo D.
Dollente that will be built in his residence San Jose, Bacon District, Sorsogon City. This paper
also contain my experiences from week one to the end of the OJT. It also contains my
assessment of the virtual internship program.
vii
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
TABLE OF CONTENTS
Page No.
Approval Sheet iv
Acknowledgement v
Dedication vi
CHAPTER
1 INTRODUCTION 1
Contextualization
Internship Focus/Objectives/Justification
Information Acquisition
Timetable
Technical Aspects
viii
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
3 SELF-ASSESSMENT 3
4 RECOMMENDATIONS 4
5 APPENDICES 5
ix
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
CHAPTER I
INTRODUCTION
Contextualization
Due to the occurring pandemic, the Sorsogon State University has adopted a virtual
internship program to cope with the needs of the students in on-the-job training course. The
internship program is a six week distance learning course comprised of 240 hours. The
intern is free to choose what kind of project he wants to make that is connected to his
program Bachelor of Science in Electrical Engineering. This project will be made in four
week span which includes the client interview, description of the project and many more.
The intern has chosen a project of making an electrical plan for a house of the client. The
intern used AutoCAD to make the electrical plan.
Internship Focus/Objectives/Justification
The virtual internship and seminar intends to empower students to acquire bits of
knowledge and improve their abilities in an online climate with exercises identified with the
program's center topics. Eventually, every student assumes liability for being proactive
online in drawing in with the educator/temporary position guide and different members to
accomplish the temporary job targets.
By the end of this course the intern is expected to exhibit familiarity with the morals
engaged with doing a temporary job, depict, investigate, and orchestrate their learning
experience in the temporary job as an entry level position paper or story report, survey the
difficulties of current advancement projects pursuing maintainability, elements of work
places and the progressions that showed pre-and existing-pandemic circumstance and,
gain significant experience despite the difficulties in their field of study.
1
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
CHAPTER II
ON- THE- JOB TRAINING PROGRAM
Information Acquisition
Timetable
The intern’s project has a one month span that includes the meeting with the client,
planning, creating the design, finalizing and modifying the electrical plan to meet the client’s
demand.
Month of July
Week 1 Week 2 Week 3 Week 4
Meeting and discussing with
client
Planning and finalizing draft
Making the electrical design
using AutoCAD
Finishing the design and
ensuring its quality
Meeting with client and
presenting the electrical
design
If there are problems, modify
the design to suit the client’s
desire and finishing
Technical Aspects
The project’s aim is to create an electrical plan for the client’s house. After meeting
and discussing with the client, the intern acquired the specifications to create the floor plan
of the client’s house. The intern used AutoCAD to make the floor plan that will be later used
to make the electrical plan. The intern then set and placed the lighting and power system
using symbols.
And lastly, the intern modified and modified the design to suit the client’s desires. The
intern plans to place a standard 100 amps service panel board to accommodate the lighting
and power systems, and also the appliances that will be used in the house. There are ten
duplex receptacle outlets and ten 5-watt and 3-watt LED lights. The wire that will be used
will be the 14-gauge wire, all of these components are placed in the electrical plan with
their own respective legends.
2
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
CHAPTER III
SELF-ASSESSMENT
The intern is concerned by the fact that the project’s scope was limited by the
current situation which led to the sense of lack in accomplishment. Bounded
knowledge, skills, and resources were also factors that the intern is worried that the
project scale is insufficient to allow progress in terms of growth in his profession and
to better the chances in the upcoming years of his career.
3
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
CHAPTER IV
RECOMMENDATIONS
Based on the experiences and outcome of the virtual internship program, the intern
would like to recommend:
1. To properly choose the type of project the future intern would get based on their
knowledge, skill, resources and interest.
3. The future interns should also gain experience in using software and technologies
that can aid to their project.
4
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
CHAPTER V
APPENDICES
5
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
6
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
I. PROJECT TITLE: Electrical Plan for a house that will be built in San Jose, Bacon
District, Sorsogon City
II. BRIEF SUMMARY: This project’s aim is to create an electrical plan for the
client’s house in a one month span. The client’s house will be built in their lot in
the residence of San Jose, Bacon District, Sorsogon City. The house is a 11.5
by 6 square meters with a height of 3 m and a porch with 2.5 by 7.5 square
meters. It is composed of two bedrooms, one restroom, kitchen, living room,
dining and family room.
Finalizing the floor plan Finishing the floor plan and fixing Attained the complete floor
of the house of the the problems. plan for the project.
client.
Electrical layout plan for Making the layout using the floor Finished the electrical plan
the client’s house. plan as the basis. layout.
IV. REFLECTION
Challenges Encountered Solution Plan
None
7
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
PROGRESS REPORT II
Engineering-Architecture Department
Virtual Internship Program (Midyear 2021)
I. PROJECT TITLE: Electrical Plan for a house that will be built in San Jose, Bacon
District, Sorsogon City
II. BRIEF SUMMARY: This project’s aim is to create an electrical plan for the
client’s house in a one month span. The client’s house will be built in their lot in
the residence of San Jose, Bacon District, Sorsogon City. The house is a 11.5
by 6 square meters with a height of 3 m and a porch with 2.5 by 7.5 square
meters. It is composed of two bedrooms, one restroom, kitchen, living room,
dining and family room.
Finalizing the floor plan Finishing the floor plan and fixing Attained the complete floor
of the house of the the problems. plan for the project.
client.
Electrical layout plan for Making the layout using the floor Finished the electrical plan
the client’s house. plan as the basis. layout.
IV. REFLECTION
Challenges Encountered Solution Plan
None
8
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
9
Republic of the Philippines
ENGINEERING & ARCHITECTURE DEPARTMENT
SORSOGON STATE COLLEGE
Sorsogon City Campus
Sorsogon City
Electrical Plan
10