Saudi Aramco Inspection Checklist: Receiving Inspection of Pressure Vessels-Internal SAIC-D-2003 24-Jul-18 Mech
Saudi Aramco Inspection Checklist: Receiving Inspection of Pressure Vessels-Internal SAIC-D-2003 24-Jul-18 Mech
Saudi Aramco Inspection Checklist: Receiving Inspection of Pressure Vessels-Internal SAIC-D-2003 24-Jul-18 Mech
00 30-Jun-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Receiving Inspection of Pressure Vessels- Internal SAIC-D-2003 24-Jul-18 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
Reinforcing and wear pads for all internal welded attachments are sized
to meet requirements of paragraph 7.11.4 of this specification. Pads shall
be a
32-SAMSS-004,
A6 a) Minimum of 10 mm (3/8") thick, but shall not exceed the shell thickness
Par. 11.9.1
b) All of their corners rounded to a minimum radius of 50 mm.
c) Distance from any edge of the attachment to the closest edge of the
reinforcing pad shall not be less than 50 mm.
SAES-D-001,
Internal Coating system applied conformed with the Vessel Data Sheet Par. 6.7.4 &
A8 and SAES-H-001 Para 7.3. For specific applications, verify APCS system SAES-H-001,
used meets design parameters (Serv & temp) Para.
7.3
For desalters and dehydrators, the bottom 60% including all internals
SAES-H-001,
A10 except anodes, were coated up to this level. Also coat the last 25-50 mm
Par. 7.3 (H)(2)
of the tips of the grid.
The dry film thickness shall be within the minimum and maximum
SAES-H-001,
A11 limits allowed in the applicable APCS. Dry film thickness shall be
Para 9.3.5 (a)
checked in accordance with SSPC PA2.
All internal piping systems, such as feed and reflux distributors, are 32-SAMSS-020,
A14
supported from the vessel shell or head, and not from trays. Par. 9.1.10
All tray support rings and other attachments required for supporting trays
32-SAMSS-020,
A15 shall be welded to the vessel shell. The welding of tray sub-assemblies
Par. 12.1.1
and tray decks to tray supports is prohibited.
Each tray shall be provided with one or more manways designed for
32-SAMSS-020,
A16 removal from above and below the tray deck. Whenever possible, the
Par. 9.1.6
minimum clear opening dimension shall be 380 mm x 460 mm.
The clearance under tray support beams shall be a minimum of 450 mm.
Where the tray spacing is 450 mm, the clearance may be reduced to a
32-SAMSS-020,
A18 minimum of 380 mm to account for the depth of tray panel trusses. If this
Par. 9.1.8
is not achievable, manways shall be provided on both sides of beams for
both tray above and below.
32-SAMSS-020,
A20 Caps shall be removable from above the tray.
Par. 9.1.12
32-SAMSS-020,
A21 Blind trays shall be seal welded after installation.
Par. 9.1.13
Spacing between two adjacent bolt holes or clamps shall not exceed 150
mm (or 6”) for standard design loads. For trays and internals design with
32-SAMSS-020,
A22 uplift of 1psi or greater, this minimum spacing shall be 100 mm (or 4”).
Par. 9.1.15
The spacing between two adjacent tray sections on the support ring is
exempt from this requirement.
32-SAMSS-020,
A23
Par. 9.3.1
The minimum design thickness for tray decks and downcomer sheets 32-SAMSS-020,
A24
shall be not less than 1.5 mm. Par. 9.3.2
The minimum thickness of downcomer bars shall be 6.4 mm for carbon 32-SAMSS-020,
A25
steel and 5 mm for alloy steels. Par. 9.3.3
All materials for vessels in sour service shall conform to ISO 15156 and 32-SAMSS-020,
A26
SAES-L-133. Par. 10.3
The use of non-ASTM materials shall be approved by the Saudi Aramco 32-SAMSS-020,
A27
Engineer. Par. 10.5
Gasket materials shall be asbestos-free and compatible with the service 32-SAMSS-020,
A28
conditions of the vessel. Par. 10.6
Entire valve unit, i.e., valves, guides and stops, shall be a minimum of
32-SAMSS-020,
A29 type 410 stainless steel for all new and revamped columns, unless a
Par. 10.7
higher grade material is specified in the data sheet.
All tray support rings and other attachments required for supporting trays
32-SAMSS-020,
A30 shall be welded to the vessel shell. The welding of tray sub-assemblies
Par. 12.1.1
and tray decks to tray supports is prohibited
All segments of valve trays that contain valves shall be installed after the 32-SAMSS-020,
A31
vessel has been hydrotested, thoroughly dried, and cleaned. Par. 12.1.2
Vessel circumferential seams shall not be covered by the tray or tray 32-SAMSS-020,
A32
support installations. Par. 12.1.3
Tray bolts shall be tightened, using a calibrated torque wrench, to the Tray 32-SAMSS-020,
A34
Manufacturer's instructions and engaged to the full depth of the nuts. Par. 12.1.6
After installation, all trays shall be visually inspected for conformance to 32-SAMSS-020,
A37
the Tray Manufacturer's drawings and installation tolerances. Par. 13.2.1
Bubble cap and valve trays are to be inspected by using a strong light.
Any open seams, holes or gaps, which exceed 6 mm, shall be closed by 32-SAMSS-020,
A38
non-asbestos gaskets and bolt tightening. Openings less than 6 mm shall Par. 13.2.2
be repaired by bolt tightening or gaskets.
The addition of gaskets and/or ceramic rope is to be regarded as the last 32-SAMSS-020,
A39
course of action to be taken to seal trays. Par. 13.2.3
Materials for gaskets and rope must be compatible with the design 32-SAMSS-020,
A40
conditions of the vessel and chemically resistant to the service. Par. 13.2.4
REMARKS:
REFERENCE DOCUMENTS:
1- 32-SAMSS-004 -- Manufacture of Pressure Vessels (1 February 2018)
2- 32-SAMSS-020 -- Manufacture of Trays and Packing, (29 September 2016)
3- SAES-W-014 -- Weld Overlays and Welding of Clad Materials, (29 September 2016)
4- SAES-H-001 -- Coating Selection and Application Requirements for Industrial Plants and Equipment, (21 February 2018)
5- SAES-D-001 -- Design Criteria for Pressure Vessels, (20 August 2017)