1 BestPracticesCover
1 BestPracticesCover
July 2019
Version x.x - 29 May 2012
Best Practices in Dam
and Levee Safety Risk
Analysis
and
This manual was developed for internal use. The agencies make no guarantees as to the
accuracy or applicability of the information presented herein.
ACRONYMS AND ABBREVIATIONS
1D one-dimensional
2D two-dimensional
3D three-dimensional
i
July 2019
CIRIA Construction Industry Research and Information Association
CMS conditional mean spectra
CPT cone penetrometer tests
CR Comprehensive Review
CSR cyclic stress ratio
CSSM critical state soil mechanics
CSZ Cascadia Subduction Zone
EE excessive erosion
EFA Erosion Function Apparatus
El. elevation
EM Engineering Manual
EPRI Electric Power Research Institute
EROS Center for Earth Resources Observation and Science
ESP exchangeable sodium percentage
ETL Engineering Technical Letter
F force
FB ForeBay
FC fines content
FCM fracture critical members
Fd drain factor
FE finite element
FEMA Federal Emergency Management Agency
ii
July 2019
FERC Federal Energy Regulatory Commission
FLAC Fast Lagrangian Analysis of Continua
FOSM First Order Second Moment
FS factor of safety
FSSS fully softened shear strength
FTA fault tree analysis
M moment
MC Monte Carlo
MCE Maximum Credible Earthquake
MPBX Multi-Point Borehole Extensometers
iii
July 2019
NATO North Atlantic Treaty Organization
NE no erosion
NED National Elevation Dataset
NEHRP National Earthquake Hazards Reduction Program
NFIP National Flood Insurance Program
NLD National Levee Database
NMSZ New Madrid Seismic Zone
NRC National Research Council
NRCS Natural Resources Conservation Service
NSW DSC New South Wales Dam Safety Committee
NWS National Weather Service
PA Periodic Assessment
PAR population at risk
PDF probability density function
PERT program or project evaluation and review technique
PFDHA Probabilistic Fault Displacement Hazard Analysis
PFM potential failure mode
PFMA potential failure mode analysis
PG&E Pacific Gas & Electric Company
PGA peak ground acceleration
PGD permanent ground deformation
PHA peak horizontal acceleration
PI plasticity index
P.L. Public Law
PMF Probable Maximum Flood
PMP probable maximum precipitation
POR pool of record
PSHA Probabilistic Seismic Hazard Analysis
iv
July 2019
Reclamation Bureau of Reclamation
RM river mile
RMC Risk Management Center (USACE)
RMR rock mass rating
RQD rock quality designation
RWS reservoir water surface
SA spectral acceleration
SCADA Supervisory Control and Data Acquisition
SEFM Stochastic Event Flood Model
SI statistically independent
S-O Second-Order
SOP standard operating procedure
SPF standard project flood
SPT standard penetration test
SQRA Semi-Quantitative Risk Assessment
SSHAC Senior Seismic Hazard Analysis Committee
SWV Shear Wave Velocity Tests
v
July 2019
USSD United States Society on Dams
UU unconsolidated-undrained (tests)
V/H vertical/horizontal
Var variance
VST vane shear test
Symbols
° degree
% percent
vi
July 2019
TABLE OF CONTENTS
Preface
Part II – Loading
Chapter B-1 Hydrologic Hazard Analysis
Chapter B-2 Seismic Hazard Analysis
vii
July 2019
Part V – Concrete Structures
Chapter E-1 Concrete Property Considerations
Chapter E-2 Reinforced Concrete Failure Mechanisms
Chapter E-3 Risk Analysis for Concrete Gravity Structures
Chapter E-4 Risk Analysis for Concrete Arch Dams
Chapter E-5 Risk Analysis for Concrete Buttress Dams
Chapter E-6 Seismic Pier Failure
Chapter E-7 Seismic Evaluation of Retaining Walls
Chapter E-8 Levee Floodwalls
viii
July 2019