MARJAN INCREMENT PROGRAM Installation of Steel Support and Gratings For TR Area
MARJAN INCREMENT PROGRAM Installation of Steel Support and Gratings For TR Area
MARJAN INCREMENT PROGRAM Installation of Steel Support and Gratings For TR Area
For
Installation of Steel MIP-MS-CT-CM-016
Support for Grating in Method Statement for PAGE 1 OF 10
TR Area Installation of Steel Support for REV 00
Grating in TR Area
Subcontract: SM12-SC-IK-AR-001
BI/JO: BI-09003-005
REV. 00
Sign. Sign.
DATE 16 SEPT 21
ORIG. BY H.BELTRAN
ENGINEERING
SAFETY
REVIEW IMMAM
SAFETY SUPERVISOR
BY
QC
REVIEW E.ANSARI
QC MANAGER
BY
M.RIYAZUDDI
APP. BY N
PROJECT MANAGER
CLIENT
APP
Issue History
Rev Reason for Issue
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
TABLE OF CONTENTS
1.0 PURPOSE...................................................................................................................3.
2.0 SCOPE........................................................................................................................ 3.
3.0 APPLICABLE DOCUMENTS..................................................................................….3.
4.0 RESPONSIBILITY.......................................................................................................4.
5.0 MANPOWER...............................................................................................................6.
6.0 MATERIAL...................................................................................................................6.
7.0 METHOD / PROCEDURE...........................................................................................7.
8.0 QUALITY CONTROL.............................................................................................................. 9.
9.0 HEALTH SAFETY AND ENVIRONMENT..........................................................................10.
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
1.0 PURPOSE
1.1 Define a procedure to provide a proper and efficient sequence of work for the installation of
steel grating supports at transformer oil pit area which are required to be perform in safely
manner in accordance to the project specifications Saudi Aramco and other relevant industry code
& standard
2.0 SCOPE
2.1 This method statement will cover the work associated with the installation of steel support
(channels, end plates and angle) for steel grating of transformer oil pit area at Marjan increment
program package 12 in conformance to the contract scope of work. This shall be read in
conjunction with the other approval method statement and project specification. In the event of
conflict with the other, the most stringent shall govern
3.0 REFERENCE
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
Designation Responsibility
QC Manager 4.3 The QA/QC Manager is responsible for ensuring that the
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
Designation Responsibility
4.4 Site Engineer- Civil shall be responsible for the direct work
supervision at site and ensure that the work is performed in
accordance with Contractor and company Technical Scope of
Site Engineer- Civil
Work and latest approved for construction drawings. He
shall monitor the availability of materials in line with his required
schedule.
4.7 Surveyor shall study and analyze if the location where the
structure should be installed satisfies the condition or restriction
Surveyor of erection works on site. He shall coordinate with other
discipline to visualize possible conflicts in the drawings as well as
in the schedules to provide other options in preventing
Unnecessary delays obstructions.
5.0 MANPOWER
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
The Contractor shall deploy an adequate number of resources as per requirement and
quantum of work in compliance to work schedule and resource histograms.
6.0 MATERIALS
Supply and fabrication of cover plate for valve pit from carbon steel detail c compose of edge
angle L50x50x5 with anchor bar PRV 14 mm o. Cover plate from checkered plate 6mm cover plate
frame from L50x50x5 lifting handle from PRB 12mmo detail A & B composed of two side edge
angle L50x50x5 with anchor bar PRV 14 mm O two side edge angle L50x50x5 without anchor bar
cover plate from chucked plate 6mm thk, cover plate frame from L50x50x5 lifting handle from PRB
12mmo, gravel stopper from plate 10mm hk ht=350mm as per drawing according to the
specifications at inclusion section hot dipped galvanized as per ASTM A123
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
FRAME
Supply and fabrication of frame from carbon steel MC6x163 replaced with Jis C150x75x5.7x10
detail f end plate 13 mm detail G gusset plate 10 mm thk detail H guset plate 10mm thk as per
drawing according to the specification at inclusion section hot dipped galvanized as per ASTM
A123
Supply and fabracation of grating from carbon steel grating 32x5x30x100, ASTM A1101 PIP
STF05530 Hot Dipped Galvanised as per ASTM A123
7.1.2 Prepare all materials, tools and equipment needed for the job.
7.1.5 General. Gratings or floor plates to be installed in structure shall be installed after
erection, alignment and bolt tightening of the main structural members with
scaffolding platform
7.1.6 Prior to erect the structure, scaffold access and platform should be installed.
Scaffold will serve as the access, working platform and anchorage point for
Full Body harness if permanent rails, access and platform are not installed.
If structure is already installed without scaffold, scaffold installation shall
Commence immediately.
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
Install barricade at area covered of grating installation with proper signage’s “danger
on-going grating installation”.
No simultaneous activity (working at same location and different level), it is
strictly prohibited.
7.1.7 Repair or replace members which are damaged during Installation. Do not secure
damaged members in position.
7.2.2 All repaired, reworked, damage galvanized steel supports and gratings will be
coated as per applicable coating system.
8.1 QC Inspector / QC Supervisor will be assigned to attend to the quality control and
assurance of this work.
8.3 QC Inspector will produce all the documents attesting to the acceptability of the
works and submits to contractor.
8.4 QC Inspector has to utilize the applicable SATIP’s & SAIC’s for every activity
9.0 HEALTH SAFETY AND ENVIRONMENT
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
The HSE shall perform a splendid role in all construction activities to ensure that all
the works are being carried out in a safe manner and creating a healthy environment
at the site. All activities shall be carried out safely in accordance with CONTRACTOR
approved CSSP and relevant SACSM requirements.
Work Permits (WP) shall be obtained from the relevant authorities thru the assistance
of the Contractor. The WP shall always be available during the work execution.
Approved Job Safety Analysis (JSA) must be discussed by Site Engineer/Safety Officer
to the Working Team before the activity starts. Each personnel must be aware of all
hazards associated with the Works. And since JSA is an active document, it may
change accordingly as the work progresses.
Personal Protective Equipment’s (PPE) shall be provided and required, varying and
appropriate to type of Works. Safety Belts, with associated harness and lifeline shall
be provided for the personnel working at heights.
All tools & equipment should be checked prior to commencing any work and at the
end of any work to report any defect or damage that may have occurred during an
activity.
Hand tools should be inspected on a regular basis and be in good working condition.
All workers shall have working at heights training prior to working at heights. To
ensure that all workers working at heights shall wear full body harness with 100% tie
off.
All workers shall have Chemical Handling Training prior to start the work.
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area
Any incident at site shall be immediately reported to client and recorded. Weekly
Safety Statistics Reports and Safety Performance Reports, etc. shall be prepared and
recorded.
Document Name: Method Statement for Installation of Steel Support for Grating in TR Area