This inspection checklist is for duct insulation of HVAC ductwork systems at King Faisal Air Academy Majmaa in the Royal Saudi Air Force. It contains 9 acceptance criteria for duct insulation, including requirements that all supply and fresh air ductwork be insulated, that return ducts passing through non-airconditioned areas be insulated, and that insulation be installed according to manufacturer's instructions and SMACNA standards. Inspectors are to check that surfaces are cleaned and approved before insulation is applied, that insulation is applied with adhesive according to manufacturer recommendations, and that it is not over compressed during installation.

Uploaded by

Babar Shehzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views2 pages

03 Duct Insulation Installation

This inspection checklist is for duct insulation of HVAC ductwork systems at King Faisal Air Academy Majmaa in the Royal Saudi Air Force. It contains 9 acceptance criteria for duct insulation, including requirements that all supply and fresh air ductwork be insulated, that return ducts passing through non-airconditioned areas be insulated, and that insulation be installed according to manufacturer's instructions and SMACNA standards. Inspectors are to check that surfaces are cleaned and approved before insulation is applied, that insulation is applied with adhesive according to manufacturer recommendations, and that it is not over compressed during installation.

Uploaded by

Babar Shehzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

King Faisal Air Academy Majmaa

Royal Saudi Air Force


Kingdom of Saudi Arabia

Inspection Checklist for Duct Insulation of HVAC Ductwork System


FIR No.: Checklist No.: BSS-0-GE00-ME039-0022
Drawing No.: ITP No.: BSS-0-GE00-ME032-0008
Location Area: Date:
S/N ACCEPTANCE CRITERIA REFERENCE YES NO N/A REMARKS
A DUCT INSULATION
General: Section 15250
A.1 Insulate all air-conditioning supply and fresh Part 3
air ductwork. Refer approved materials. Clause 3.03

The return ducts shall be insulated where Section 15250


A.2 passing through a non-airconditioned area or Part 3
ceiling space not used as return air plenum. Clause 3.03

Insulation shall be installed as per insulation Section 15250


A.3 manufacturer’s instructions and SMACNA Part 3
standards. Clause 3.03

All surfaces shall be tested, cleaned, Section 15250


A.4 inspected and approved prior to the Part 3
application of insulation. Clause 3.03

Insulation shall be applied adhesives


Section 15250
according to manufacturer’s recommended.
A.5 Part 3
It applied to entire circumference of ducts
Clause 3.03
and to all surfaces of fittings and transitions.

Non-flammable adhesive shall be applied Section 15250


A.6 over entire duct and flexible duct insulation Part 3
shall then be wrapped over adhesive. Clause 3.03

Apply insulation on rectangular duct elbows Section 15250


A.7 and transitions with a full insulation segment Part 3
for each surface. Clause 3.03

Apply insulation on round and flat- oval duct Section 15250


A.8 elbows with individually mitered gores cut to Part 3
fit the elbow. Clause 3.03

Section 15250
Do not over compress insulation during
A.9 Part 3
installation.
Clause 3.03
Note: Other Inspection criterias which is not in this list & aplicable as per site condition shall be refered to the
technical specification & approved IFC/Shop drawing.

Remarks: Specification Section 15250 - General-Pipe, Duct and Equipment Insulation

CONSTRUCTION – BSS JV SITE SUPERVISION CONSULTANT - DAR


Name, Initial and Name, Initial and
Date Date
QA/QC INSPECTOR - BSS JV SITE SUPERVISION CONSULTANT - DAR
Name, Initial and Name, Initial and
Date Date
QA/QC SUPERVISOR - BSS JV SITE SUPERVISION CONSULTANT - DAR
Name, Initial and Name, Initial and
Date Date

You might also like