9 Bus Report
9 Bus Report
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 9 0.000 0.000 28.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 4
Location: 16.0.0C Date: 07-10-2021
Contract: SN: 4359168
Engineer: Revision: Base
Study Case: LF
Filename: 9bussystem Config.: Normal
Branch Connections
* Bus1 150.000 100.000 0.0 9.223 0.712 0 0 Bus3 9.223 0.712 35.6 99.7
Bus3 20.000 99.111 -4.4 0 0 0 0 Bus1 -9.168 0.000 267.0 100.0
Bus18 4.584 0.000 133.5 100.0
Bus6 4.584 0.000 133.5 100.0
Bus6 20.000 99.111 -4.4 0 0 6.876 0.000 Bus3 -4.584 0.000 133.5 100.0
Bus21 -2.292 0.000 66.8 100.0
Bus12 20.000 99.111 -4.4 0 0 13.752 0.000 Bus21 -6.876 0.000 200.3 100.0
Bus27 -6.876 0.000 200.3 100.0
Bus18 20.000 99.111 -4.4 0 0 6.876 0.000 Bus3 -4.584 0.000 133.5 100.0
Bus27 -2.292 0.000 66.8 100.0
Bus21 20.000 99.111 -4.4 0 0 0 0 Bus22 -9.168 0.000 267.0 100.0
Bus6 2.292 0.000 66.8 100.0
Bus12 6.876 0.000 200.3 100.0
* Bus22 150.000 100.000 0.0 9.223 0.712 0 0 Bus21 9.223 0.712 35.6 99.7
Bus27 20.000 99.111 -4.4 0 0 0 0 Bus28 -9.168 0.000 267.0 100.0
Bus12 6.876 0.000 200.3 100.0
Bus18 2.292 0.000 66.8 100.0
* Bus28 150.000 100.000 0.0 9.223 0.712 0 0 Bus27 9.223 0.712 35.6 99.7
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 7
Location: 16.0.0C Date: 07-10-2021
Contract: SN: 4359168
Engineer: Revision: Base
Study Case: LF
Filename: 9bussystem Config.: Normal
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: ETAP Page: 8
Location: 16.0.0C Date: 07-10-2021
Contract: SN: 4359168
Engineer: Revision: Base
Study Case: LF
Filename: 9bussystem Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
T1 Transformer 10.000 9.250 92.5 9.168 91.7
T7 Transformer 10.000 9.250 92.5 9.168 91.7
T10 Transformer 10.000 9.250 92.5 9.168 91.7
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
164.4 2137.2
Project: ETAP Page: 10
Location: 16.0.0C Date: 07-10-2021
Contract: SN: 4359168
Engineer: Revision: Base
Study Case: LF
Filename: 9bussystem Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: ETAP Page: 11
Location: 16.0.0C Date: 07-10-2021
Contract: SN: 4359168
Engineer: Revision: Base
Study Case: LF
Filename: 9bussystem Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 3