Confined Space PTW
Confined Space PTW
Confined Space PTW
6. Excavation Works
7. Gas Testing (every 4 hours)
□ Half Mask □ □ □ □
Gas Monitor SCBA Air Line Rescue Rope
disconnection necessary
- If Yes, has been isolated electrically, Tag Provided.
□ Protection against Overhead Live Cables (Double-Insulation)
E. Gas Test
Date & Time ………………………………. Details & Precautions Accepted Level
Gas Result
Oxygen % 19.5 - 22.5
Combustible LEL % 0
Toxic Gas H2S ppm 5
Toxic Gas - CO ppm 25
I. Extension of Validity
Date Valid up to
Permit Issuer (Process Owner): Requestor Permit Receiver
J. Completion of work K. Site / Equipment Acceptance
Work completed, housekeeping done & checked. Work checked and site / equipment taken over back after maintenance.
Date & Time:…………………………………………… Electrical Isolation / Tag shall be removed.
Permit Receiver: ………………………….. Permit Requestor: …………………………………. Permit Issuer (Process Owner): ………………………….....…………………………………..........
Signature: …………………………………….. Signature: ………………………………………………. Date & Time: ……………………………………......... Signature: ……………………………….........
White Copy: PTW Book (Issuer), Yellow Copy: Receiver, Blue Copy: Permit Requestor
Safety Dept. Contact No.: 056 417 6699 / 02305 2521 First Aider No. 054 785 5786/ 02305 2536