Assignment#03– RAC
For the air conditioning of a 4 m height 2-stories (1st and 2nd) office building located at (your assigned
location), the plan of which is shown:
Plaster on inside wall 1.25 mm
Outside wall construction 20 cm concrete block
10 cm brick veneer
Partition wall construction 33 cm brick
Roof construction 20 cm RCC slab
4 cm asbestos cement board
Floor construction 20 cm concrete
Brick density 2000 kg𝑚−3
Concrete density 1900 kg𝑚−3
Plaster density 1885 kg𝑚−3
Asbestos board density 520 kg𝑚−3
Fenestration (weather-stripped, Loose 2 m x 1.5 glass and U = 5.9 W𝑚−2 𝑘 −1
fit)
Doors (wood panels) 1.5 m x 2 and U = 5.9 W𝑚−2 𝑘 −1
Assignment#03– RAC
Outside-design conditions 43ºC DBT, 27ºC WBT
Indoor-design conditions 25º C DBT, 50% RH
Daily range 31ºC to 43ºC =12ºC
Occupancy 100
Lights 15,000 W fluorescence
Thermal Conductivities:
ℎ𝑜 = 23 𝑊𝑚−2 𝐾 −1
𝒉𝒊 = 𝟕 𝑾𝒎−𝟐 𝑲−𝟏
𝒌𝒈𝒍𝒂𝒔𝒔 = 𝟎. 𝟕𝟖 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝒄𝒐𝒏𝒄𝒓𝒆𝒕𝒆 = 𝟏. 𝟕𝟑 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝒃𝒓𝒊𝒄𝒌 = 𝟏. 𝟑𝟐 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝒑𝒍𝒂𝒔𝒕𝒆𝒓 = 𝟖. 𝟔𝟓 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝒂𝒔𝒃𝒆𝒔𝒕𝒐𝒔 = 𝟎. 𝟏𝟓𝟒 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝒇𝒍𝒐𝒐𝒓 = 𝟗 𝑾𝒎−𝟏 𝑲−𝟏
𝒌𝑹𝑪𝑪 𝒔𝒍𝒂𝒃 = 𝟗 𝑾𝒎−𝟏 𝑲−𝟏
Using Hourly Analysis Program (HAP) software, find:
1. Room Sensible (RSH)
2. Room Latent Heat (RLH)
3. Grand Total Heat (GTH)
4. Plot the Cycle on Psychrometric Chart
Download Link for Hap 4.9
https://drive.google.com/drive/folders/0Bzb7sItaOgh2dnVibk80UDRmSkU
First install X-Builder (ECAT_DownLoadLy.iR) and then HAP (E20II 4.90_DownLoadLy.iR)
Note: During Installation process when asks for the organization name, Provide your Full Name
(providing your own full name is compulsory here since your generated report will display the same
as organizational).