SC c06 Cag HBK Irm ST 00916

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

1-Ras Abu Aboud Stadium-

SC-C06-CAG-HBK-IRM-ST-00916
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00916

Author HBK QAQC - 1 Assigned To Ahmad Nadeem

Author's Email [email protected] Assigned Email [email protected]

Author's Company HBK Contracting Co. W.L.L. Assigned Company HBK Contracting Co. W.L.L.

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 02 Apr 2020 10:45 AM Scheduled For 13 Jul 2021 9:10 AM

Name IRW Status New

Description Types
Material inspection for Secondary Steel support As per attached IRW: Structural
Delivery note.

Locations Location Detail


Stadium Steel Yard

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRM-ST-00916


01 Revision 1
02 Reference Drawing/s
03 Priority High
04 Method of Statement ref:
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-ST-00112
06 Inspection Test Plan Item/s 1.5
07 Inspection Activity as described in the ITP
08 Checklist Ref:
09 Material Submittal Ref. SC-C06-CAG-HBK-MAS-ST-00648
10 Material Storage Location
11 Delivery/Packing List As Attached
12 Manufacturer Test Certificate
12 Originator Company
13 *
13 IRM Approval References
14 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
15 Originator Company HBKSF
20 Status Level
22 IRW Comment Category
23 Status Level L3 No Objection
24 CSC Inspector Ramil
25 Resubmitted for Closure

Report run on 05 Sep 2021 8:10 AM by HBK SITE1 ([email protected]) Page 1 of 3


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-00916
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00916

Signatures for ID SC-C06-CAG-HBK-IRM-ST-00916

16 HBK Site Engineer: HBK SITE1 12 Jul 2021 11:28 AM 17 HBK QA/QC Engineer: HBK SITE1 12 Jul 2021 11:28 AM

18 Project Director/ QAQC Manager: Amol Rajhans 12 Jul 202119


3:44
CSCPM
Inspector/Sr. Engineer: Structural - CSC2 RAA 13 Jul 20

20 CSC Sr. Engineer: Aristofanis Chalyvopoulos 14 Jul 2021 4:11


21 CSC
PM Lead Engineer/Director: Bhikesh Rajyagor 15 Jul 2021 1

Report run on 05 Sep 2021 8:10 AM by HBK SITE1 ([email protected]) Page 2 of 3


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-00916
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00916

ILLYICH_PJSC-_00795.pdf Posco_-_00796.pdf C06-HBK-S-STA-T-ST-AL-AZ-5808.pdf

C06-HBK-S-STA-T-ST-AL-AZ-5807.pdf C06-HBK-S-STA-T-ST-AL-AZ-5806.pdf C06-HBK-S-STA-T-ST-AL-AZ-5805.pdf

C06-HBK-S-STA-T-ST-AL-AZ-5804.pdf C06-HBK-S-STA-T-ST-AL-AZ-5803.pdf C06-HBK-S-STA-T-ST-AL-AZ-5802.pdf

C06-HBK-S-STA-T-ST-AL-AZ-5801.pdf C06-HBK-S-STA-T-ST-AL-AZ-5800.pdf MAS-ST-00648.pdf

Issues for ID SC-C06-CAG-HBK-IRM-ST-00916


Issue ID Description Type Status Company Date Due Date
Created
000876 Wrong material approval document External Closed <not set> 09 Apr 2020 null
attached ,check all secondary steel Snaglist
support attachments

Report run on 05 Sep 2021 8:10 AM by HBK SITE1 ([email protected]) Page 3 of 3

You might also like