0% found this document useful (0 votes)
222 views1 page

Federal Democrtaic Republic of Ethiopia: Ethiopian Roads Authority

This 3 sentence summary provides the high level and essential information from the document: The document is a final engineering report from May 2015 produced by the Ethiopian Roads Authority for the Jinka Hana road project concerning the design and build of the Lot 1 road from Jinka to Mender. The report contains the final engineering details and plans for constructing this section of road.

Uploaded by

Tewodros Tadesse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
222 views1 page

Federal Democrtaic Republic of Ethiopia: Ethiopian Roads Authority

This 3 sentence summary provides the high level and essential information from the document: The document is a final engineering report from May 2015 produced by the Ethiopian Roads Authority for the Jinka Hana road project concerning the design and build of the Lot 1 road from Jinka to Mender. The report contains the final engineering details and plans for constructing this section of road.

Uploaded by

Tewodros Tadesse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

FEDERAL DEMOCRTAIC REPUBLIC OF

ETHIOPIA

Ethiopian Roads Authority

Jinka Hana (Lot 1: Jinka – Mender)

Design and Build Road Project

Final Engineering Report

May 2015
-råd du kan

You might also like