Non Dir. O/C Relay-7SR1102-1NA87-1CA0-Z
Non Dir. O/C Relay-7SR1102-1NA87-1CA0-Z
Non Dir. O/C Relay-7SR1102-1NA87-1CA0-Z
ITE
DESCRIPTION STATUS
M
1 Verify that the relay is not damaged or defective. OK
Verify that the nameplate details are correct in accordance with data sheet and approved
2 OK
project drawings.
3 Verify that the relay is clean and free from grease and moisture. OK
For electromechanical relays, verify that glass cover, gaskets, spring, contacts etc. are all
4 NA
intact and free from damages.
Verify that the relay is securely mounted protected against mis-operation caused by
5 OK
vibration, shock etc.
3. ELECTRICAL TESTS:
SETTINGS
PHASE TIME OVERCURRENT
PHASE OVERCURRENT
Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 2 of 5
Typical Accuracy: ± 1 % In (see technical manual 7SR11_Non dir O-C page 124)
ii. NEUTRAL CT
Typical Accuracy: ± 1 % In (see technical manual 7SR11_Non dir O-C page 124)
SETTING
I injected T (expected) T(measured) Acceptance
I adjusted Time In Multilple of of (xIn) (S) (S)
Is(51n)(xIn) Mult. Current Setting
x 5=5 5A 1.6875 1.69 OK
1 0.5
x 2=2 2A 6.75 6.72
Limites: ± 5 % absolute or ± 30 ms
see technical manual 7SR11_Non dir O-C page 144
Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 3 of 5
SETTING
I injected T (expected) T(measured) Acceptance
I adjusted Time In Multilple of of (xIn) (S) (S)
Is(51n)(xIn) Mult. Current Setting
x 5=2.5 1.8 7.50 7.40 OK
0.36 0.25
x 2=1 0.72 30 29.33
Theory,
Limites: ± 5 % absolute or ± 30 ms
see technical manual 7SR11_Non dir O-C page 144
4. FUNCTION TEST:
7. LED CHECK:
8. ADDITIONAL TEST:
Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 5 of 5
Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature: