Customer SWCC

SHOAIBA- PHASE-2, UNIT-


Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 1 of 5

1. GENERAL DATA & INFORMATION

10BD04 (FEEDER TO AUX PHASE CT Ratio


Panel Ref. 150:1
TRANS 10BT-06) ______
2. Relay Type 7SR110[237]-1xAxx-xCA0 In 1
NEUTRAL CT Ratio
Manufacturer SIEMENS 1500:1
______
Serial No. BF2001501385 In 1
No. of contacts: 3BI+5BO Drawing/Sheet No 10BD050101KA1
7SR110[237]-1xAxx-xCA0
Order - No. 24-250 VDC
Auxiliary Voltage
Software Revision 2436H80003R4k-3d#125e 100-230 V 50/60 Hz
88V DC Threshold
Opto-coupler supply: Frequency (fn) 60 Hz
(Rated 110-220VDC)
MECHANICAL CHECKS AND VISUAL INSPECTION:

ITE
DESCRIPTION STATUS
M
1 Verify that the relay is not damaged or defective. OK
Verify that the nameplate details are correct in accordance with data sheet and approved
2 OK
project drawings.
3 Verify that the relay is clean and free from grease and moisture. OK
For electromechanical relays, verify that glass cover, gaskets, spring, contacts etc. are all
4 NA
intact and free from damages.
Verify that the relay is securely mounted protected against mis-operation caused by
5 OK
vibration, shock etc.

3. ELECTRICAL TESTS:

SETTINGS
PHASE TIME OVERCURRENT

SL PROTECTION DESCRIPTION PICK UP CURVE TIME


NO SETTINGS(xIn) SELECTION SETTINGS/TMS(S)
1 51-1 PHASE TIME OVER CURRENT 1 VERY INVERSE 0.5

PHASE OVERCURRENT

SL PROTECTION DESCRIPTION PICK UP CURVE TIME


NO SETTINGS (xIn) SELECTION SETTINGS/TMS(S)
1 50-2
PHASE OVERCURRENT HIGH 20 DMT 0.04
SET
NEUTRAL TIME OVERCURRENT

Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 2 of 5

SL PROTECTION DESCRIPTION PICK UP CURVE TIME


NO SETTINGS(xIn) SELECTION SETTINGS/TMS(S)
1 51G NEUTRAL TIME OVER 0.36 LONG TIME 0.25
CURRENT(S.B.E.F) INVERSE

3.1 METERING TEST


i. PHASE CURRENT CT

INJECTED MEASURED CURRENT (A)


EXPECTED
CURRENT
READING (A) PHASE A PHASE B PHASE C REMARKS
(A)
0.5 75 74.8 74.9 74.8 OK
1 150 150 150 150 OK

Typical Accuracy: ± 1 % In (see technical manual 7SR11_Non dir O-C page 124)

ii. NEUTRAL CT

INJECTED CURRENT EXPECTED CURRENT


MEASURED CURRENT (A) (IN) REMARKS
(A) READING (A)
0.5 750 754 OK
1 1500 1510 OK

Typical Accuracy: ± 1 % In (see technical manual 7SR11_Non dir O-C page 124)

3.2 PHASE TIME OVER CURRENT (51) TEST:

SETTING
I injected T (expected) T(measured) Acceptance
I adjusted Time In Multilple of of (xIn) (S) (S)
Is(51n)(xIn) Mult. Current Setting
x 5=5 5A 1.6875 1.69 OK
1 0.5
x 2=2 2A 6.75 6.72

Limites: ± 5 % absolute or ± 30 ms
see technical manual 7SR11_Non dir O-C page 144

Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 3 of 5

3.3 PHASE OVER CURRENT (50) TEST

FUNCT CURRENT SETTING DROP OUT TIME MEASURED REMA


PICK UP (A)
ION PHASES (Is)(X In) (A) SETTING[Sec] TIME [mSec] RK
IR 19.91 19.44 50.7
50-2 IY 20 19.90 19.43 0.04 50.0 OK
IB 19.95 19.50 50.5

Limits: Element basic operate time(tbasic)= 2 x Is: 35 ms, ± 10ms


5 x Is: 25 ms, ± 10ms
Operate time following delay(top)= tbasic + td, ± 1 % or ± 10ms

see technical manual 7SR11_Non dir O-C page 140

3.4 TIME DELAYED EARTH FAULT PROTECTION(51N)

SETTING
I injected T (expected) T(measured) Acceptance
I adjusted Time In Multilple of of (xIn) (S) (S)
Is(51n)(xIn) Mult. Current Setting
x 5=2.5 1.8 7.50 7.40 OK
0.36 0.25
x 2=1 0.72 30 29.33

Theory,

Limites: ± 5 % absolute or ± 30 ms
see technical manual 7SR11_Non dir O-C page 144

4. FUNCTION TEST:

BREAKER TRIP 86 OPERATED LED DCS


FUNCTION REMARKS
TEST SERVICE
51-1 OK
50-2 OK
51N OK
IRF NA NA NA OK
**IRF Conatct (BO-2) is merged with OC for DCS (BO-3)
Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 4 of 5

5. BINARY INPUT CHECKING

Control input No. Terminal Configuration Result


BI1 B2-B4 NOT USED OK
BI2 B6-B8 NOT USED OK
BI3 B10-B12 NOT USED OK

6. BINARY OUTPUT CHECKING

Output Relay No. Terminal Configuration Result


BO1 A3-A2 50-1/2 TRIP TO 86 OK
BO2 A5- A6 IRF TO DCS OK
BO3 TRIP TO DCS(Spare Wired for OK
A7-A8
DCS)
BO4 A9-A10 51N TRIP TO 86 OK
BO5 A11-A12 SPARE OK

7. LED CHECK:

LED No. Configuration Remarks


01 General PickUp OK
02 General Trip OK
03 PHASE A OK
04 PHASE B OK
05 PHASE C OK
06 51N OK
07 51-1 OK
08 50-2 OK
09 NOT USED OK

8. ADDITIONAL TEST:

ITEM DESCRIPTION REMARKS


1 Human Machine Interface [ HMI ] checked. Yes N/A
2 Test switch checked for correct function. Yes N/A
3 Binary Input checked Yes N/A
4 Checked all binary output configured as per scheme Yes N/A

Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020
Signature:
Customer SWCC
SHOAIBA- PHASE-2, UNIT-
Location 10,BD BUS, BD04, FEEDER
AUX TRANS 10BT06
Contractor ALSHARIF GROUP HOLDING Contract No. BT-1196
NON DIR. O/C RELAY- Sheet No.
Site Test Record
7SR1102-1NA87-1CA0-Z Page 5 of 5

5 Checked all configured LED’s as per scheme Yes N/A


6 Reset of indications checked. Yes N/A
7 Auxiliary power supply checked for rating and polarity Yes N/A
8 Date and Time in the relay Yes N/A

In compiance with IEC 60255-3 and IEC 60255-6, EATS48

1. TEST EQUIPMENTS LISTING AND CALIBRATION DATA

Item Description Make Device Sr. No. Calibration Date Calibration


Due Date
1 Secondary Injection Test Set Programma 1502874 05/10/2020 04/10/2021

Test Performed by: ASG SWCC Witness SWCC Engineer Date of Test
Name: JABIRALI. P A. MURSHED 26-DEC-2020