Plaxis 2D V20 I Bintang
Plaxis 2D V20
SHORING SYSTEM (Tie Back Wall)
o Data Tanah
o Data Wall
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
o Data Node to Node Anchor
o Data Grout Body
Tahapan Penggalian :
1. Galian 3 m
2. Galian 4 m
3. Galian 3 m
Muka air tanah ada di elevasi - 18 m.
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
➢ PLAXIS INPUT
• Open Plaxis Input → New Project → ok
• Input Project Title : Shoring System
• Pada Dimensi masukkan : Right = 80 ; Top = 20
1. Create Borehole
2. Klik di koordinat posisi borehole (Contoh di 0,0)
3. Modify soil Layer:
• Input setiap lapisan tanah
• Tentukan muka air tanah
• Input data Material Tanah
• Drag Soil ke Modify Layer
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
4. Pada Toolbar → Structure → klik Create Plate
o Input di Command : 30 0 30 -16 & 50 0 50 -16
5. Pada Toolbar → Structure → klik Show Material
o Input di Material Plate
o Drag ke Geometry Plate
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
6. Pada Toolbar → Structure → klik Create Line
o Input di Command : 30 -3 50 -3
o Input di Command : 30 -7 50 -7
o Input di Command : 30 -10 50 -10
7. Pada Toolbar → Structure → klik Create Interfaces on the Boundary
8. Pada Toolbar → Structure → klik Create Line (Create Interface)
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
9. Pada Toolbar → Structure → klik Create node to node Anchor
o Input di Command : 30 -3 21 -9 & 50 -3 59 -9
o Input di Command : 30 -7 21 -13 & 50 -7 59 -13
o Input di Material Anchor
o Drag ke Geometry Anchor
10. Pada Toolbar → Structure → klik Create Embedded Beam Row
o Input di Command : 21 -9 20 -10 & 59 -9 60 -10
o Input di Command : 21 -13 20 -14 & 59 -13 60 -14
o Input di Material Embedded Beam
o Drag ke Geometry Embedded Beam
11. Pada Toolbar → Structure → klik Create Line Load
o Input di Load : -10 kN/m/m
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
12. Pada Toolbar → Mesh → Generate Mesh
o Select Points for curves
13. Pada Toolbar → Flow Condition
14. Pada Toolbar → Staged Construction
• Initial Phase
• Phase 1 : Wall dan Interface
• Phase 2 : DeActive Galian 1
• Phase 3 : Active node to node Anchor dan Embedded Beam 1
• Phase 4 : DeActive Galian 2
• Phase 5 : Active node to node Anchor dan Embedded Beam 2
• Phase 6 : DeActive Galian 3
• Phase 7 : Active Load
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
15. Pada Toolbar → Staged Construction → CALCULATE
16. Pada Toolbar → Staged Construction → View Calculation Results
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
o Total Displacement
o Principal Effective Stresss
o Axial Forces
PLAXIS 2D V20 I Bintang
Plaxis 2D V20 I Bintang
o Bending Moment
o Table Forces
PLAXIS 2D V20 I Bintang