Predictive Maintenance: & Condition Monitoring

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TPC Live training onsite, online, or at a seminar near you.

TRAINING

Predictive
Learn About:

• Identify Why Time Based

Maintenance
Maintenance Doesn’t Work

• Describe the Benefits

& Condition Monitoring


of a PdM and Condition
Monitoring Program

• Identify What Equipment


to Monitor

• Understand Different PdM


Technologies

• Predict What Maintenance


Needs to be Done and When Condition monitoring
maintenance requires
• Choose the right PdM less personnel, saves
Technologies for You money, and downtime!
“Learned the importance of PdM
• Measure the Effectiveness and how to justify it.”
of Maintenance Decisions Daniel A. – Maintenance Planner

• Communicate the
Condition Monitoring
Program through the Facility

• Choose a PdM Service Learn How to Develop a Predictive Maintenance


Provider
Program and Monitor the Results!
• Implement Your Own
PdM Program

• Reserve your space now! CALL 1-877-978-7246


• Check us out online at live.tpctraining.com for a complete listing of all
seminars coming to your area
• This seminar is also available as an Online Simulcast or can be
brought On-Site to your facility
© 2019 TPC Training PUB PDM 1219
Reserve Your Space Now! Call 1-877-978-7246 or visit us online at live.tpctraining.com

SEMINAR OVERVIEW DISCUSSION TOPICS SEMINAR FEE & AGENDA


With ever increasing demands from top Predictive Maintenance Program Types This 2-day course is just $1195 (Earn 1.6 CEUs)
management to do more work and decrease costs,
investing in predictive maintenance and condition Failure Rate vs. Time 7:30 am Registration
• Bathtub Curve
monitoring makes more sense today than ever. • Weibull Distribution Curve vs. Time 8:00 am Class Begins
While many organizations still rely heavily on 12:00 -1:00 pm Lunch (on your own)
time based maintenance, it’s a proven fact that Sixteen PdM Program Benefits 4:30 pm Class Ends
condition monitoring maintenance requires less • How to Develop a PdM Program Worksheet
personnel and saves money and downtime.
Four Foundations for Improving Reliability NO RISK REGISTRATION
• The Culture of Reliability
Predictive Maintenance and Condition Monitoring
• Product Mission & MONEY-BACK GUARANTEE
will provide students with a framework to make the You can reserve your space in the class at any time
• Reliability Specifications
right decisions on what equipment needs condition • Defining Universal Failures and cancel without penalty. Cancellations made more
monitoring, what technologies to use to meet their than 14 days prior to the seminar may be refunded
needs and how to measure the effectiveness of Comparing Maintenance Strategies based on Cost or rescheduled. Cancellations made within 14 days
their decisions. In addition to exposing students and Availability with “Large Truck Case History” may be rescheduled for any future topic and/or date.
to the principles and options for a program, they • Run to Failure
If you’re not satisfied with the course, we’ll promptly
will learn about real world applications that have • Scheduled Repair/Replacement
• On-Condition Inspections refund your payment.
benefited other successful maintenance programs.
Basic Concepts of FMEA and FMECA
WHAT YOU WILL TAKE HOME JOIN OUR CLASSROOM SEMINARS
Identifying Probability and Costs of Equipment Failure
• Comprehensive classroom materials
• Recovering CMMS Data
FROM VIRTUALLY ANYWHERE
• A Personalized Training Certificate with 0.8 • FMEA Data live.tpctraining.com/simulcast
TPC Training Continuing Education Units • IEEE 493 Standards of Electric Motors
for each day attended, 1.6 for both days. Our simulcast option allows students to connect to
• All the information you need from asking Using Maintenance Log Data a live classroom seminar via a web link, with the
our instructors specific questions about • Times-To-Failure and Times-To-Repair
• Suspension Time ability to participate fully in the classroom dialogue,
your own unique equipment or facility. exercises, and Q&A. Online participants get all the
• MTBF - Mean Time Between Failures
benefits of the full classroom experience, plus the
CONTINUING EDUCATION Root Cause Analysis for Beginners convenience of remote access.
Upon completion of this seminar, the student will • What Happened? How? Why?
• Cause Charting for Root Causes Features include
receive a Certification of Completion and .8 TPC
• Implementation Action Steps • Two full days of live, interactive instruction from
Training CEUs per day attended. Most employers
and many government agencies accept TPC a TPC Training instructor
How to Sell Root Cause Analysis to Management
Training CEUs to fulfill their continuing education • Preserving Evaluation Data • All classroom materials in PDF format
requirements. If the student needs CEUs to renew • Building the Analysis Team • Certificate of completion for 16 hours of live training
a state license, please contact us at 303-867-5039 • Analyzing the Data • Full technical support to ensure your online
to ensure the state licensing board has approved • Tracking Cost Savings experience is a rewarding one
• Calculating Bottom Line Results
the seminar. If we are currently not approved by
• Set Up a Seal Failure Analysis Program
your state licensing board, we are happy to begin
the process as long as we receive your request at The Role of Reliability Centered Maintenance
BRING THE TRAINING ON-SITE
least one month before the training date. • NASA’s Guiding Principles of RCM TO YOUR FACILITY
• Five RCM Strategies live.tpctraining.com/on-site
• RCFA-Root Cause Failure Analysis
TRAINING PHILOSOPHY
TPC Training’s curriculum is designed to provide PdM for Manufacturing Plant Operators Every public seminar class in our Course Catalog
complete coverage of essential industrial can be conducted on-site, with the same expert
maintenance skills, across a full range of electrical The Relationship between Availability and Reliability instructors. To arrange an on-site training, call or
training, HVAC, plant management, and mechanical • Profit benefits of Operational Availability email us at [email protected].
• Calculate Up-time Value in Profit Dollars
& industrial topics. Our “see, touch, do” instructional
approach allows us to impart practical skills in an Some Advantages of On-Site Training
Down-Time Analysis
intensive format. • Cost Savings — Save time and travel costs by
How PdM Technologies Integrate with RCM keeping workers on-site
The most vital part of our seminar format is the • Customized Content — Tailor the seminar to
coverage that goes beyond the course outline. How to Write a PdM Return on Investment Report your facility and equipment
Our small class sizes allow each instructor to • Flexibility — Accommodate multiple shifts and
tailor the course to address students’ individual Monitoring for Instant Machine Condition Diagnostics different start and end times
• How to Make Recommendations for Repair

TPC
needs, concerns, and experience levels. Our
instructors deliver content with hands-on exercises, The Future of Predictive Maintenance
demonstrations role-playing, visuals, and case
study discussions. Conformance Testing for Contractor Suppliers TRAINING
PUB PDM 1219

You might also like