Summary of Submittals by Macro Wall Industrial

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Project Name: ALVEO CERCA VIENTO TOWER 2

Project Package/ Service: LIGHTWEIGHT WALL PANELS


Subject: SUMMARY OF SUBMITTALS OF LIGHWEIGHT WALL PANEL (GFRC) BY MACRO INDUSTRIAL

PRODUCT DATA / SHOP DRAWINGS


VIENTO TOWER 2 MACRO WALL INDUSTRIAL
AS PER PLAN
(SPECIFICATIONS) (MACRO AIR SABS)
GLASS FIBER REINFORCED CONCRETE

WALL THICKNESS (AS PER IFC PLAN)


MACRO AIR SAB
100MM THK
100MM THK
WALL THICKNESS 125MM THK
150MM THK
150MM THK
200MM THK
200MM THK

A. EXPANDED POLYSTYRENE (EPS):


• THE EPS (EXPANDED POLYSTYRENE) IS IN ACCORDANCE WITH ASTM C-578 STANDARD.
• NORMAL EPS DENSITY IS EITHER 0.90 PCF OR 1.5 PCF (14.4KG/M3 TO 24KG/M3) NOMINAL MACRO AIR COMPOSITE WALL
SHAPED INTO VARIOUS CONFIGURATIONS SUCH AS RECTANGULAR, CURVED, OR !-SHAPES. WALL THICKNESS: 100MM - 150MM
• THE THICKNESS RANGES FROM 2 INCHES TO 16 INCHES (51MM TO 406MM) DEPENDING ON EPS THICKNESS: 76MM - 126MM - ASTM (C578)
THE END USE AND DESIGN CONSIDERATIONS. COATING THICKNESS: 12MM (BOTH SIDES)
• SURFACE BURNING CHARACTERISTICS ARE A FLAME-SPREAD INDEX OF 25 OR LESS AND A SMOKEDEVELOPED INDEX OF 450 OR LESS
WHEN TESTED IN ACCORDANCE WITH ASTM E 84 AT A 4-INCH (102MM) THICKNESS.

B. MACRO AIR SABS STRUCTURAL COATINGS:


• THE MACRO AIR-SABS STRUCTURAL COATINGS ARE COMPOSITE MATERIALS CONSISTING OF MAS
PREMIX, SAND, MAS ADDITIVES, AND WATER.
• FLEXURAL STRENGTH AND MODULUS OF ELASTICITY MUST BE DETERMINED BY TESTS IN
ACCORDANCE WITH ASTM C 947, AND COMPRESSIVE STRENGTH MUST BE DETERMINED BY TEST
COATING
IN ACCORDANCE WITH ASTM C 109.
COATING THICKNESS: 12MM (BOTH SIDES)
• THE THICKNESSES OF THESE STRUCTURAL COATINGS RANGES FROM 6 TO 50MM, DEPENDING ON
THE REQUIRED LOADS IMPOSED ON THE STRUCTURAL COMPONENTS AS DESCRIBED IN THE
STRUCTURAL DESIGN DOCUMENTATION.
• THE STRUCTURAL COATING IS A CLASS A INTERIOR FINISH WITH A FLAME-SPREAD INDEX OF 25 OR
LESS AND A SMOKE-DEVELOPED INDEX OF 450 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E 84 AT A 6MM THICKNESS.

MATERIALS

POLYURETHANE ADHESIVE
BASE: POLYURETHANE
CONSISTENCY: STABLE FOAM
CURING SYSTEM: MOISTURE-CURE
TAKE FREE TIME: 7 MINS AT 20°C/60% R.H.
ADHESIVE RATE FROM: 1 HOUR AT 20°C/60% R.H.
SPECIFIC GRAVITY: 19 KG/M3 (EXTRUDED)
TEMPERATURE RESISTANCE: 140°C ~ 100°C (CURED )
BOND STRENGTH: ABOUT 0.012 N/M2 (EPS & WOOD)
THERMAL CONDUCTIVITY: 0.030 W / (M*K)
C. ADHESIVES:
FIRE STOP SEALANT
THE ADHESIVE ARE USED TO ADHERE WITH EPS SEGMENTS TO CREATE WALLS PRIOR TO STRUCTURAL
SOURCE FISCHER FIAM TECHNICAL DATA SHEET
COATING WITH THE MACRO AIR-SABS PROPRIETARY STRUCTURAL COATING, USING SINGLE OR TWO-PART FOAM PLASTIC ADHESIVE.
CHEMICAL BASE: WATER-BASED ACRYLIC
RELATIVE GRAVITY: APPROX 1.6 KG/M3
SKIN-FORMING TIME: APPROX 10 MINUTES AT 23°C RH
CURING RATE: APPROX 1.5 MM PER 24 HOURS
STORAGE TEMPERATURE: +5°C TO 25°C
MOVEMENT CAPABILITY: ±25%
SLUMP: NIL UP TO 30MM
SHELF-LIFE: 18 MONTHS (UNDER RECOMMENDED CONDITIONS)
PH VALUE: 08.09.2005
SOUND TRANSMISSION: CLASS 63DB
COLOR: WHITE, GREY

MACRO AIR COMPOSITE WALL (100MM-150MM THK WALL W/ 12MM COATING) = 2 HOURS FIRE RATED
FIRE RATING 4 HOURS
MACRO AIR ICC WALL (100MM-150MM THK WITH 20MM COATING) = 4 HOURS FIRE RATED

SOUND TRANSMISSION ASTM E413


ASTM E90 STC 50
(DECIBELS) (63db)

RFA'S
MDC-TSD-RFA-AR-AVT2-130-21
AVT2 - MACRO WALL SYSTEM METHODOLOGY AND TECHNICAL SPECIFICATIONS BY MACRO INDUSTRIAL

REVISE AND RESUBMIT


V.A COMMENTS
APPROVED AS COMMENTED
1. FOR IDG COMMENTS AND APPROVALS PRIOR TO BIDDING/PROCUREMENT. MAKE SURE THIS WALL SYSTEM IS APPROVED BY PROPONENT.
2. PROVIDE SITE MOCKUP OF WALL SYSTEM FOR JOINT INSPECTION AND APPROVAL OF PROJECT TEAM.
3. VERIFY IF THERE ARE PENDING ISSUES WITH SUPPLIER AND WALL SYSTEM IN OTHER ALVEO PROJECTS. THIS MAY AFFECT APPROVALS
FROM HIGHER MANAGEMENT.
4. PROVIDE WARRANTY FOR FURTHER APPROVALS.

NOTE: MAKE SURE THICKNESS OF WALL AT T&B ALREADY INCLUDES THICKNESS OF TILES.
MAKE SURE TO HAVE APPROVED KEYPLAN WITH CORRESPONDING
THICKNESSES WITH FIRE RATING EQUIVALENT PRIOR TO PROCUREMENT,
IMPLEMENTATION ON SIT
CLEARANCE OF T&B SHOULD BE AS PER AR INTENT.

IDG COMMENTS
REVISED AND RESUBMIT
1. REMOVE MACRO WALL ICC FROM THE SUBMITTAL. SHOULD BE MACRO AIR.
2. CM TO VERIFY AND REVIEW.

CMG COMMENTS
REVISED AND RESUBMIT
EXCLUDE ICC SINCE IT IS NOT PART OF THE APPROVED MATERIALS WITH ALVEO.
(ADVANCED COPY / PROCORE 04-27-2021)

MDC-TSD-RFA-AR-AVT2-130A-21
AVT2 - MACRO WALL SYSTEM METHODOLOGY AND TECHNICAL SPECIFICATIONS BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. SECURE APPROVAL FROM IDG & CMG PRIOR TO PROCUREMENT AND INSTALLATION AT SITE.
2. KEYPLAN PROVIDED IS UNDERGOING APPROVAL FROM IDG DUE TO REQUIRED THICKNESS OF CHB WALLS AT FIRE-RATED AREAS SUCH AS SHAFTS, EE ROOM, ETC.
3. SUBMIT SAMPLES PER THICKNESS TYPE OF MACROWALL FOR FURTHER APPROVAL.
4. OK AND NOTED ON PASSED REQUIRED TEST RESULTS.
5. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS.
6. FOR IDG REVIEW AND APPROVAL, CMG COST QUALIFICATION.

CMG COMMENTS
APPROVED AS COMMENTED
APPLICABLE FOR T&B WALL

TCT COMMENTS
REVISED AND RESUBMIT
1. REFER TO ALVEO STANDARD OPR FOR THE WALL MATERIALS. MACRO AIR IS FOR T&B ONLY. IDG & CM TO CLARIFY.
2. REVISE AND RESUBMIT OTHER WALL MAPPING AREAS.

IDG COMMENTS
APPROVED AS COMMENTED
1. FOLLOW ACG APPROVED DIRECTION FOR FIRE-RATED AREAS (UTILITY ROOMS, SHAFTS, ETC)
2. OK TO USE 150MM LWP
3. FOLLOW AS PER ARCHITECTS COMMENTS
4. OK AND NOTED ON PASSED TEST RESULTS
5. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS
6. FOR CM REVIEW ON THE KEYPLAN OF WALL SYSTEMS

CMG COMMENTS
ON-GOING
MDC-TSD-RFA-AR-AVT2-131-21
AVT2 - PHYSICAL SAMPLE OF 150MM THK (ICC) AND 100MM THK (COMPOSITE) WALL
BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. PROVIDE ACTUAL SITE MOCKUP OF WHOLE WALL SYSTEM FOR JOINT INSPECTION AND APPROVAL OF PROJECT TEAM.
2. SUBMIT WARRANTY FOR FURTHER APPROVAL
3. FOR IDG APPROVAL & CMG COST QUANTIFICATION
NOTE: SECURE APPROVAL FR ALVEO MANAGEMENT PRIOR TO BIDDING, PROCUREMENT AND INSTALLATION AT SITE.

IDG COMMENTS
REJECTED
• APPROVED WALL SYSTEM INTENT IS MACRO AIR SUB.
• NO APPROVALS FOR MACRO ICC.
• INCLUDE ONLY SAMPLES FROM THE APPROVED INTENT.

CMG COMMENTS
REVISED AND RESUBMIT
APPROVED WALL SYSTEM IS MACRO AIR SUB ONLY, PLEASE DISREGARD ICC AND RESUBMIT

MDC-TSD-RFA-AR-AVT2-132-21
AVT2 - PHYSICAL SAMPLE OF WALL SYSTEM SAMPLE BOARD; INCLUDES SAND, CEMENT, GLASS
FIBER, PUPP 750X, EPS, MASS ADDITIVES, EPOXY A AND B, CORNER AID AND FISCHER
FIAM600 & MATERIAL SAFETY DATA SHEET BY MACRO INDUSTRIAL.

V.A COMMENTS
APPROVED AS COMMENTED
1. PROVIDE ACTUAL SITE MOCKUP OF WHOLE WALL SYSTEM FOR JOINT INSPECTION AND APPROVAL OF PROJECT TEAM.
2. SUBMIT WARRANTY FOR FURTHER APPROVAL
3. FOR IDG APPROVAL & CMG COST QUANTIFICATION

CMG COMMENTS
APPROVED AS COMMENTED
REFER TO CONSULTANT'S COMMENTS
THIS IS FOR MACRO AIR SUB

MDC-TSD-RFA-AR-AVT2-142-21
AVT2- WALL STAKING PLAN (MACRO WALLS, LIGHTWEIGHT PANEL, CHB, AND DRYWALL KEY PLAN)

V.A COMMENTS
APPROVED AS COMMENTED
APPROVED AS COMMENTED. (CONDITIONAL) ATTACH DIRECTIVE/APPROVAL FROM PROPONENT/CMG FOR PROCEEDING WITH USE OF MACROWALL ESP AS UNIT TO UNIT &
UNIT TO HALLWAY PARTITION.
1. VERIFY FIRE-RATING OF SINGLE-SIDE PLASTERED MACRO WALLS TO BE USED IN PIPECHASES. WILL THESE BE COMPLIANT TO 2-HOUR FIRE RATING AS REQUIRED BY CODE?
2. AS OF MAY 2021, THERE IS ONGOING STUDY OF INCREASE IN WALL THICKNESS FOR FIRE RATED AREAS SUCH AS FIRE STAIRS, EE ROOM, ELEVATOR SHAFT ETC. TO CONFORM
TO 2-HOUR FIRE RATING REQUIREMENT. APPROVAL FOR THESE AREAS TO BE DISCUSSED IN DIFFERENT RFA.
3. SECURE APPROVAL OF MACROWALL (FOR EACH THICKNESS, TYPE) FROM PROPONENT PRIOR TO PROCUREMENT AND IMPLEMENTATION ON SITE. WAS MACROWALL
APPROVED TO BE USED IN AREAS OTHER THAN T&B?
4. REFLECT ALSO CLADDING FOR REFPIPE/CDP LAYOUTS.
5. MAKE SURE AR INTENT, ADSG AND OPR ARE FOLLOWED.
6. FOR IDG & CMG REVIEW, COMMENTS AND APPROVAL.
NOTE: AS DISCUSSED WITH CMG, SUPPLIER TO PROVIDE CERTIFICATIONS FOR SINGLE-SIDE PLASTERED MACRO WALLS, AS WELL AS OTHER REQUIREMENTS TO ENSURE STABILITY
AND CODE COMPLIANCE. THIS RFA IS TO SERVE AS REFERENCE FOR BIDDING ONLY.

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-148-21
AVT2 - PRODUCT TECHNICAL DATA AND MSDS OF MACRO WALL BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
(CONDITIONAL) APPROVED AS COMMENTED. ATTACH DIRECTIVE/APPROVAL FROM PROPONENT/CMG FOR PROCEEDING WITH USE OF MACROWALL ESP AS UNIT TO UNIT &
UNIT TO HALLWAY PARTITION.
1. VERIFY FIRE-RATING OF SINGLE-SIDE PLASTERED MACRO WALLS TO BE USED IN PIPECHASES. WILL THESE BE COMPLIANT TO 2-HOUR FIRE RATING AS REQUIRED BY CODE?
2. AS OF MAY 2021, THERE IS ONGOING STUDY OF INCREASE IN WALL THICKNESS FOR FIRE-RATED AREAS SUCH AS FIRE STAIRS, EE ROOM, ELEVATOR SHAFT ETC. TO CONFORM
TO 2-HOUR FIRE RATING REQUIREMENT. APPROVAL FOR THESE AREAS TO BE DISCUSSED IN DIFFERENT RFA.
3. SECURE APPROVAL OF MACROWALL (FOR EACH THICKNESS, TYPE) FROM PROPONENT PRIOR TO PROCUREMENT AND IMPLEMENTATION ON SITE. WAS MACROWALL
APPROVED TO BE USED IN AREAS OTHER THAN T&B?
4. FOR IDG & CMG REVIEW AND COMMENTS, APPROVAL.
NOTE: AS DISCUSSED WITH CMG, SUPPLIER TO PROVIDE CERTIFICATIONS FOR SINGLE-SIDE PLASTERED MACROWALLS, AS WELL AS OTHER REQUIREMENTS TO ENSURE STABILITY
AND CODE COMPLIANCE. THIS RFA IS TO SERVE AS REFERENCE FOR BIDDING ONLY.

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-150-21
AVT2 - MSDS OF ALKALI RESISTANT GLASS FIBER PRODUCT BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
OK WITH SUBMITTED DATA. FOR CMG REVIEW AND APPROVAL.

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-151-21
AVT2 - MSDS OF ALKALI RESISTANT GLASS FIBER PRODUCT BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
OK WITH SUBMITTED DATA. FOR CMG REVIEW AND APPROVAL.

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-152-21
AVT2 - MSDS OF ALKALI RESISTANT GLASS FIBER PRODUCT BY MACRO INDUSTRIAL
SUBMITTED RFA
V.A COMMENTS
APPROVED AS COMMENTED
OK WITH SUBMITTED DATA. FOR CMG REVIEW AND APPROVAL.

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-153-21
AVT2 - MSDS OF ALKALI RESISTANT GLASS FIBER PRODUCT BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. FOLLOW RECOMMENDED APPLICATION THICKNESS, METHODOLOGY, PROCEDURE AND MIX AS PER MANUFACTURER'S SPECIFICATIONS.
2. FOR CMG REVIEW AND APPROVAL.

CMG COMMENTS
APPROVED
MDC-TSD-RFA-AR-AVT2-157-21
AVT2 - MACRO AIR WALL SYSTEM COMPOSITE PHYSICAL SAMPLE (200MM WALL THICKNESS & 150MM WALL THICKNESS) BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. PROVIDE ACTUAL SITE MOCKUP FOR JOINT TEAM INSPECTION AND APPROVAL.
2. SUBMIT SAMPLE FOR 100MM THKNESS MACROWALL FOR SIGNOFF.
3. FOR IDG APPROVAL, CMG COST QUALIFICATION.

TCT COMMENTS
FOR RECORD ONLY
NO FURTHER COMMENTS FROM TCT.

IDG COMMENTS
APPROVED AS COMMENTED
FOLLOW AS PER ARCHITECT'S COMMENTS:
PROVIDE ACTUAL SITE MOCKUP FOR JOINT TEAM INSPECTION AND APPROVAL.
FOLLOW AS PER CM COMMENT
MOCK UP OF MACROWALL SHALL INCLUDE FULL SCOPE OF AWARD

CMG COMMENTS
APPROVED AS COMMENTED

MDC-TSD-RFA-AR-AVT2-158-21
AVT2 - METHODOLOGY FOR SUPPLY & INSTALLATION OF MACRO AIR WALL SYSTEM T&B UTILITY PARTITION

V.A COMMENTS
APPROVED AS COMMENTED
1. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS.
2. PROVIDE WARRANTY AND CERTIFICATION OF WATER TIGHTNESS IF TO PUSH THROUGH WITH BUILT-IN ZOCALO FOR FURTHER APPROVAL.
3. FOR IDG APPROVAL AND CMG COST QUALIFICATION.

TCT COMMENTS
APPROVED AS NOTED
1. NOTED ON INSTALLATION METHODOLOGY. UPDATE PHOTOS FOR BETTER APPRECIATION.
2. ENSURE CLASH FREE DESIGN ON INSTALLATION OF DOWELS.

IDG COMMENTS
APPROVED AS COMMENTED
1. FOLLOW AS PER ARCHITECTS COMMENTS
2. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS.
3. PROVIDE WARRANTY AND CERTIFICATION OF WATER TIGHTNESS IF TO PUSH THROUGH WITH BUILT-IN ZOCALO FOR FURTHER APPROVAL.
4. FOLLOW AS PER TCT COMMENTS
5. NOTED ON INSTALLATION METHODOLOGY. UPDATE PHOTOS FOR BETTER APPRECIATION.
6. ENSURE CLASH FREE DESIGN ON INSTALLATION OF DOWELS.
7. FOLLOW AS PER CM COMMENT
8. ENSURE SCOPE OF WORK IS CLEAR DURING AWARD

CMG COMMENTS
ON-GOING

MDC-TSD-RFA-AR-AVT2-161-21
AVT2 - ARCHITECTURAL WORKS SHOP DRAWING BY MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. HAVE WE ALREADY VERIFIED WITH MACROWALL IF WALL TILE THICKNESS & ADHESIVE CAN BE ACCOMMODATED TO ACHIEVE T&B WIDTH CLEARANCE?
2. MAKE SURE OPENINGS ARE AS PER AR INTENT.
3. ATTACH TESTING CERTIFICATION AND WARRANTY FOR BUILT-IN ZOCALO FOR APPROVAL OF PROJECT TEAM.
4. FOR CMG REVIEW AND COMMENTS.

CMG COMMENTS
APPROVED AS COMMENTED
CONSIDER THE STUDY ON THE WALL THICKNESS

TCT COMMENTS
APPROVED AS COMMENTED
1. VALIDATE CONSTRUCTABILITY OF EPS W/ COATING ON BOTH SIDES, FOR PIPE CHASES.
2. CHECK CLEARANCES INSIDE T&BS WITH THE PROPOSED EPS THICKNESS.
3. VALIDATE USE OF MULTIPLE WALL THICKNESS IN THE PROJECT. CHECK APPROVED OPR.
4. ALWAYS CHECK DRILLING SITES OF DOWEL BARS, AND ENSURE THAT NO CONDUITS/PIPES WILL BE PUNCTURED.

IDG COMMENTS
APPROVED AS COMMENTED
1. SUBMIT UPDATED KEYPLAN FOR SEPARATE APPROVAL REFLECTING ADJUSTMENTS ON TOILET WALL SETTING OUT TO FOLLOW TOILET CLEAR WIDTHS AS PER PLAN
2. FOLLOW AS PER ARCHITECT'S COMMENTS:
3. VERIFY WITH MACROWALL IF WALL TILE THICKNESS & ADHESIVE CAN BE ACCOMMODATED TO ACHIEVE T&B WIDTH CLEARANCE?
4. MAKE SURE OPENINGS ARE AS PER AR INTENT.
5. ATTACH TESTING CERTIFICATION AND WARRANTY FOR BUILT-IN ZOCALO FOR APPROVAL OF PROJECT TEAM.
6. FOLLOW AS PER TCT COMMENTS:
7. VALIDATE CONSTRUCTABILITY OF EPS W/ COATING ON BOTH SIDES, FOR PIPE CHASES.
8. CHECK CLEARANCES INSIDE T&BS WITH THE PROPOSED EPS THICKNESS.
9. VALIDATE USE OF MULTIPLE WALL THICKNESS IN THE PROJECT. CHECK APPROVED OPR.
10. ALWAYS CHECK DRILLING SITES OF DOWEL BARS, AND ENSURE THAT NO CONDUITS/PIPES WILL BE PUNCTURED.
11. FOR CM REVIEW AND APPROVAL

CMG COMMENTS
APPROVED

MDC-TSD-RFA-AR-AVT2-165-21
AVT2 - WALL STAKING PLAN 8TH FLOOR TRANSITION FLOOR (MACRO WALL) -15TH FLOOR TRANSITION FLOOR (MACRO WALL) -16TH-17TH FLOOR EF AND PH (MACRO WALL)

V.A COMMENTS
APPROVED AS COMMENTED
SUPPLIER TO SUBMIT UPDATED WALL STAKING PLAN AS PER COMMENTS FROM AR & IDG FOR FINAL APPROVAL
1. ONGOING STUDY AND APPROVALS ON THICKNESS AND/OR MATERIAL OF WALLS AT COMMON AREAS
IN RELATION TO REQUIREMENTS OF FIRE RATED ROOMS.
2. SUBMIT FIRE RATING CERTIFICATION FOR SINGLE PLASTERED WALLS.
3. FOR IDG APPROVAL, CMG COST QUALIFICATION

IDG COMMENTS
REVISED AND RESUBMIT
1. UPDATE WALL STAKING PLAN BASED ON ACG APPROVED DIRECTION:
2. USE WALLQRETE 150MM LWP FOR FIRE RATED ROOMS
3. FOLLOW AS PER ARCHITECT'S COMMENTS
4. SUPPLIER TO SUBMIT UPDATED WALL STAKING PLAN AS PER COMMENTS FROM AR & IDG FOR FINAL APPROVAL
5. SUBMIT FIRE RATING CERTIFICATION FOR SINGLE PLASTERED WALLS.

CMG COMMENTS
ON-GOING

MDC-TSD-RFA-AR-AVT2-167-21
AVT2- METHOD STATEMENT FOR INSTALLATION OF MACRO AIR WALL SYSTEM- TOILET & BATH AND UTILITY PARTITION BY: MACRO INDUSTRIAL PACKAGING PRODUCTS CORP.)

V.A COMMENTS
REVISED AND RESUBMIT
1. METHODOLOGY DID NOT INCLUDE OR DID NOT MENTION BUILT-IN ZOCALO.
2. ONGOING DISCUSSIONS REGARDING APPROVAL OF ALVEO FOR BUILT-IN ZOCALO.
3. FOR CM REVIEW AND COMMENTS.
NOTE: AS OF DATE, TSD HAS SUBMITTED ADDITIONAL METHODOLOGY FOR BUILT-IN ZOCALO AS REQUESTED DURING THE DCM VIA EMAIL. APPROVAL PENDING OK FROM
ALVEO TECHNICAL TEAM AND IDG.

CMG COMMENTS
REVISED AND RESUBMIT
MDC-TSD-RFA-AR-AVT2-170-21
AVT2 - METHOD STATEMENT FOR INSTALLATION OF MACRO AIR WALL SYSTEM- TOILET & BATH AND UTILITY PARTITION BY:MACRO INDUSTRIAL

V.A COMMENTS
APPROVED AS COMMENTED
1. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS.
2. OK WITH BUILT-IN ZOCALO AS PER APPROVAL FROM SIR PETE OF ALVEO.
3. FOR IDG APPROVAL, CMG COST QUALIFICATIONS

TCT COMMENTS
APPROVED AS COMMENTED
ENSURE TO FOLLOW THE MANUFACTURER'S RECOMMENDATION ON INSTALLATION.

IDG COMMENTS
APPROVED AS COMMENTED
1. OK WITH BUILT IN ZOCALO AS PER TCT APPROVAL
2. FOLLOW AS PER ARCHITECT'S AND TCT COMMENTS:
3. FOLLOW RECOMMENDED PROCEDURE AND METHODOLOGY AS PER MANUFACTURER'S SPECIFICATIONS.
4. FOR CM REVIEW AND APPROVAL

CMG COMMENTS
APPROVED

PREPARED BY : CHECKED BY :

RADZMER C. SABDANI ALEXANDER PARCON


TSD COORDINATOR TSD OFFICER

You might also like