Quality Inspection Assurance System - : Supplier Management
Quality Inspection Assurance System - : Supplier Management
Supplier Name:
1) Rank A X (Not Acceptable)
Total Score:
Supplier Management :
Items
∆
Self Audit Date: TKM Audit Date (With Improvement Plan)
Checked By Approved By
2) Rank No.of "O" items /
B items
X, ∆ (With Improvement Plan) OK Ratio: Total items (70)
(Quality Incharge) (Quality Head)
Inspection Station: Over all
3) OK Ratio > 85% Acceptable
Judgement
No.of Parts Inspected in station Based on Critera 1), 2) & 3) the Overall Judgement will be ( O, ∆ ,X,)
Score
Judgeme Category
Cat Sub-Cat. Sl No. Check item Ranking Remarks/Comments/Improvement Plan Evidence
nt Result
0 1 2 3 4
1 Skilled inspectors (level : can do inspection without support ) are being designated to perform inspection A Inspector Skill level chart availability at each location
Training Content
2 Training plan and schedule available for each inspector B Training plan
5 Training on (i)Repair/Rework procedure (ii)Abnormality handling (iii) Standard work should be available A
MAN- Inpector with Right Skill,Knowledge,Attitude
6 Inspector Skill evaluation Plan is available with pre decided frequency A Skill Evaluation plan
7 Master Trainer is available for each inspection process and sufficient master trainers are available B Master trainer certification
Checksheet for evaluation of the inspector is available in areas of (i) Basic Skill (ii)Technical Know-How Evaluation checksheets for dummy check,sensory
8
(iii)Operation Area (Standard workCheck,Inspection sequence check, Dummy Test)
B check,parts knowhow check
10 Actual Confirmation of adherence to established procedures should be done periodially B Evaluation checksheets should contain these points
Handling
11 Inspector must have awareness on handling major Quality Defect - Stop Call and Wait and inform supervisor A Question Inspector
Defect
Parts
12 Supervisor role during major Quality defect should be clearly defined B Question Supervisor
13 Confirm availability of equipments,tools for good condition as per pre-authorised schedule B Supervisor Daily activity should have these items
15 Supervisor ensures Training and Evaluation of each inspector as per schedule B Supervisor authorization of training and evaluation
16 Daily Defect Monitoring and feedback to process is ensured A Supervisor authorization on inspection report
17 Supervisor Role during 4M change has been made clear and visaulized A 4M change confirmation method(checksheet)
18 5S should be ensured daily by supervisor around the inspection area B 5S audit checksheet
Sufficient area for inspection - easy movement of part and inspector during inspection ( inspection area layout
19
) A Inspection Area Genchi
MACHINE/TOOL - Facility for inspection with essential tools and its efficient
20 Area for before inspected and after inspected parts has been identified clearly A
21 Good Lighting for good visibility of the part condition - Required lux level ( for appearance aspect of part ) A Lux level Standards
22 Noise around the inspection area - Decibel level ( for inspection of functional parts ) B Decibel level Standards
Measuring Instruments
B
Inspection tools and
26 Instruction to use Checking Fixtures/Gauges/Tools/Equipments should be available and displayed B Instruction procedure
27 Plan for calibration of inspection tools at set frequency should be avialable and adhered A Calibration plan
30 Plan for Review of boundary samples as per SQAM section 3-3 (temporary or permanent boundary samples) B Boundary Sample check plan
Ensure the good condition of the all the display sheets in inspection area (skill matrix,inspection instruction
35
sheets,one point lessons,defects list and all the standard documents)
B
Storage and recording of all the inspection documants (checksheets,inspection reports,training
36
material,evaluation sheets) for future reference and traceability B Check data recording and storage system
37 List of Check items decided are available - Master check item list B Master check item list
38 Rule for revision of Inspection Instruction sheet is available - addition or deletion or modification of check items B Authorised Rule/Procedure
(check items)
Each inspection item has Sequence of check,Inspection instruction (what to check) with inspection time
Inspection
41 Criticality of each check item to be mentioned in IIS ( Rank ,Kaku S ) A Check Inspection instruction sheet
44 Red Bins (reject parts) Yellow Bins (rework parts) at each inspection table are available A Genchi at inspection
Inspection report & Defects classification for severity,type of defect,defect description,responsibility are
45
available
B Inspection report
47 NG parts are counted at end of shift and red paint is applied to prevent Mixup B
49 Elementary Instruction Sheet for major repairs (Repair Checksheet-to confirm all affected areas) B Repair checksheet
50 Lincensed Repair member are made available for repair confirmation B Licensing of repair member
Instant feedback to process,to immediately confirm quality assurance level when a serious quality defect is
53
detected (forum to discuss quality defects ) A
54 Stop Call Wait display to create awareness to inspectors B Display at inspection line
Dropped part handling - Dropped parts should not be passed without inspection
55
Non Regular part - Trial part,first off sample,try out part - ensure no mixing with mass prod parts A Rule for non regular parts handling
Forums to address Major quality defects should be available - Emergency meetings,Internal Quality problem
Feedback
reports
57 Counter measures are made available for major Quality Problems at morning meeting area B Countermeasure reports
Improve Std Work is modified continuously to improve defect detectability (based on suggestion by operators and
ments/ 58
observation by supervisors B Kaizen activity
kaizens Management confirm daily quality status at Cross Functional Team Meetings in the quality review area
59
/Monitoring area
A Management attendance monitoring in meetings
60 Management follow up and confirm the countermeasures for major quality defects at work place A Meeting reports and minutes
63 Quality Targets are set & Available for monitoring and targets are revised dynamically B Signatures on all documents
MANAGEMENT
65 Internal audit by management to assess Quality Status by genchi A Display at inspection line
Problem solving capability of Engineers are developed by use of Quality Tools in analysing defects with
67
Management Review
B Audit reports
Sub-Supplier Quality Assurance -1) Receiving parts inspection (sampling and 100% inspection) 2) Quality
68
status monitoring of subsuppliers (ppm,defects monitoring) 3) Management visits to sub-suppliers
A Evidence