0% found this document useful (0 votes)
28 views16 pages

NW Model-Temp-Sec B

The document presents input data on the production and transportation costs from various supply regions to meet demand in different regions for two companies, TelecomOne and HighOptic. It provides the transportation costs per ton and distance between supply and demand locations, production capacities and costs for each supply region, and the monthly demand for each demand region. The objective is to determine the lowest cost network to meet all demand requirements.

Uploaded by

Melvin Shaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views16 pages

NW Model-Temp-Sec B

The document presents input data on the production and transportation costs from various supply regions to meet demand in different regions for two companies, TelecomOne and HighOptic. It provides the transportation costs per ton and distance between supply and demand locations, production capacities and costs for each supply region, and the monthly demand for each demand region. The objective is to determine the lowest cost network to meet all demand requirements.

Uploaded by

Melvin Shaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Input Data-SunOil

Demand Region
Production and Transportation Cost per 1,000,000 Units Fixed
Cost Low
Supply Region N. America S. America Europe Asia Africa ($) Capacity
N. America 81 92 101 130 115 6000 10
S. America 117 77 108 98 100 4500 10
Europe 102 105 95 119 111 6500 10
Asia 115 125 90 59 74 4100 10
Africa 142 100 103 105 71 4000 10
Demand 12 8 14 16 7

What is the lowest cost network?


Model
DV
Demand Region
Production and Transportation Cost per 1,00,000 Units Low capacity High capacity
Supply Region N. America S. America Europe Asia Africa plant open plant open
N. America 0 0 0 0 0 0 0
S. America 12 8 0 0 0 0 1
Europe 0 0 0 0 0 0 0
Asia 0 0 4 16 0 0 1
Africa 0 0 10 0 7 0 1
6000 10 9000 20
4500 10 6750 20
6500 10 9750 20
4100 10 6150 20
4000 10 6000 20

Supply RegionN. America S. America Europe Asia Africa


N. America 81 92 101 130 115
S. America 117 77 108 98 100
Europe 102 105 95 119 111
Asia 115 125 90 59 74
Africa 142 100 103 105 71
Fixed
Cost High
($) Capacity
9000 20
6750 20
9750 20
6150 20
6000 20

Demand Constraint
N. America S. America Europe Asia Africa
Unmet demand 0 0 0 0 0

Supply Constraint Objective Function


Excess Capacity
N. America 0 Cost= 23751.00
S. America 0
Europe 0
Asia 0
Africa 3
Input Data -Steel Appliances
Transportation Quantity Coordinates
Distance
Sources/Markets Cost ($)/Ton in Tones
Xn Yn (dn)
Mile (Fn) (Dn)
Buffalo 0.9 500 700 1200 318.55288
Sources Memphis 0.95 300 250 600 515.31023
St.Louis 0.85 700 225 825 459.84943
Atlanda 1.5 225 600 500 390.5527
Boston 1.5 150 1050 1200 486.89163
Markets Jacksonville 1.5 250 800 300 593.97685
Philadelphia 1.5 175 925 975 260.8403
New York 1.5 300 1000 1080 375.19717

Model
DV
X 681
Y 882

Objective Function
Cost 1265235
Demand city production and transportation cost per thousand units (Thousand $)
Supply city
Atlanta Boston Chicago Denver Omaha Portland

Baltimore 1675 400 685 1630 1160 2800


TelecomOne Memphis 380 1355 543 1045 665 2321
Wichita 922 1646 700 508 311 1797
Cheyenne 1460 1940 970 100 495 1200
HighOptic
Salt lake city 1925 2400 1425 500 950 800
Monthly demand (Thousand 10 8 14 6 7 11
units)

Model- TelecomOne Model- HighOpti


Monthly
capacity
(Thousand
units)
18
22
31
24
27

Model- HighOptic
TC
Demand city production and transportation cost per thousand units (Thousand $)
Supply city
Atlanta Boston Chicago Denver Omaha Portland
Baltimore 1675 400 685 1630 1160 2800
TelecomOne Memphis 380 1355 543 1045 665 2321
Wichita 922 1646 700 508 311 1797
Cheyenne 1460 1940 970 100 495 1200
HighOptic
Salt lake city 1925 2400 1425 500 950 800
Monthly demand (Thousand 10 8 14 6 7 11
units)

Model- Telecomoptic
Monthly Annual Fixed
capacity cost
(Thousand (Thousand$)
units)
18 7650
22 4100
31 2200
24 3500
27 5000
Demand city production and transportation cost per thousand units (Thousand $)
Supply city
Atlanta Boston Chicago Denver Omaha Portland
Baltimore 1675 400 685 1630 1160 2800
TelecomOne Memphis 380 1355 543 1045 665 2321
Wichita 922 1646 700 508 311 1797
Cheyenne 1460 1940 970 100 495 1200
HighOptic
Salt lake city 1925 2400 1425 500 950 800
Monthly demand (Thousand 10 8 14 6 7 11
units)

Model- Telecomoptic
Monthly Annual Fixed
capacity cost
(Thousand (Thousand$)
units)
18 7650
22 4100
31 2200
24 3500
27 5000

You might also like