Bmt5118 - Operations Management Digital Assignment-1: 0.625 Loan/labour Hours
Bmt5118 - Operations Management Digital Assignment-1: 0.625 Loan/labour Hours
DIGITAL ASSIGNMENT-1
ANUSHA R [20MBA0126]
QUESTION 1: Karnataka Union Bank employs three loan officers, each working eight hours
per day. Each officer processes an average of five loans per day. The bank’s payroll cost for the
officers is Rs. 8000 per day, and there is a daily overhead expense of Rs.6000.
A). Calculate the labour productivity:
So, it’s worth purchasing a new software for the bank proceedings.
QUESTION 2: Rajasthan Toys has four distribution centres located at the location coordinates
given. The monthly demand at each centre is also given.
Distribution Co-ordinates Monthly
Centre (Km) Demand
A (100, 150) 50
B (250, 250) 30
C (150, 150) 15
D (200, 300) 100
A). Management is considering locating a new plant at the site of one of the four
distribution centres. Which Location should be selected (Use rectilinear distance)?
Rectilinear Distance = 𝐝 (𝐢, 𝐣) = [𝐗𝐢 − 𝐗𝐣] + [Yi – Yj]
A 50 200 10000
B 30 50 1500
D 100 200 20000
Total 31500
A 50 250 12500
B 30 100 3000
C 15 200 3000
Total 18500
The load distance score table of distribution center, A, B, C are higher compared to D,
Distribution centre D (200, 300) can be considered for new plant location.
350
300 200, 300
250 250, 250
Axis Title
200
150 100, 150 150, 150
100
50
0
0 50 100 150 200 250 300
Axis Title
B). If the management decides to locate the new plant at the centre of gravity what
would be the co-ordinates of the new facility?
C). Also determine the load-distance score if the new facility is located at COG.
If the new facility is located at COG point the load-distance score will be as 20648.2.