GF - rt23m Tower Boq. (G.F)

This document is a bill of quantities (BOQ) for site work at site ID MB5854. It includes 19 items with descriptions, specifications, units, planned quantities, built quantities, and variations for tasks like site preparation, security, documentation, tower foundation works including reinforced concrete and rebar, grouting, plastering and coatings. The tasks are for a 40m tower on an outdoor unit site, with work starting on July 24, 2011 by contractor Munir Sukhtian International Ltd.

Uploaded by

Nadira Pervin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
620 views42 pages

GF - rt23m Tower Boq. (G.F)

This document is a bill of quantities (BOQ) for site work at site ID MB5854. It includes 19 items with descriptions, specifications, units, planned quantities, built quantities, and variations for tasks like site preparation, security, documentation, tower foundation works including reinforced concrete and rebar, grouting, plastering and coatings. The tasks are for a 40m tower on an outdoor unit site, with work starting on July 24, 2011 by contractor Munir Sukhtian International Ltd.

Uploaded by

Nadira Pervin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 42

MB5854 Submitted On

PO No. Airtel Bangladesh Infra/PUR/939


Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


1. SITE PREPARATION & FINAL DOCUMENTATION
1 Initial Mobilisation / Demobilisation Mobilisation of the initial resources needed, temporary working facility, transportation, Providing Layout. Per Site 1.00 1.00 0.00
2 Site Security SP will be responsible for security at site during since Site Kick-off period and upto RFTI Per Site 1.00 1.00 0.00

Includes preparation and updates of followings documents

# As planned BOQ (APB) to be submitted on Kick-off


# Site Kick-off Documents
# Redline Drawings (RD) to be prepared and approved during PAT (1 set in A4 paper)
3 Site Documents # As Built Drawing (ABD) to be prepared and submitted after final Acceptance and Snag clearance (1 set in A3 Per Site 1.00 1.00 0.00
and 1 set in A4 paper)
# As Built BoQ (ABB) to be submitted on RFTI declaration
# Power Connection Documents (Demand Note, Payment Receipt, Consumer Meter Order/Meter Card)
# All Test Reports (Concrete, Earth Resitance, Tower)
# All warranty Certificates (AC, ACU, AVR, Aviation Light, MDB, Galvanization to tower)

2. Tower Foundation/Towre Frame


Stone chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and specified cement
RCC Works (1:1.5:3) with wooden
4 with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using wooden cu. m
formworks for RT Sites Formworks/shuttering, props and necessary supports etc, Strength fc = 21Mpa
Stone chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and specified cement
RCC Works (1:1.5:3) with wooden
5 with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using wooden cu. m 19.00 18.94
formworks for GF Sites Formworks/shuttering, props and necessary supports etc, Strength fc = 21Mpa
Stone chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and specified cement
RCC Works (1:1.5:3) with steel
6 with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using steel cu. m
formworks for both GF and RT Sites Formworks/shuttering, props and necessary supports etc. Strength fc = 21~23Mpa

Picked Jhama Brick chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and
RCC Works (1:2:4) with steel
7 specified cement with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using cu. m
formworks for both GF and RT Sites Steel Formworks/shuttering, props and necessary supports etc. Strength fc = 17~19Mpa

Picked Jhama Brick chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and
RCC Works (1:2:4) with wooden
8 specified cement with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using cu. m
formworks for both GF and RT sites Wooden Formworks/shuttering, props and necessary supports etc., Strength fc = 17Mpa

40 Grade Reinforcement with material, labour, straightening, placement and binding with nail and wire and all
9 Mild Steel Deformed Bar (G-40) other acitivities
kg 2,489.00 2,372.83
10 Mild Steel Deformed Bar (G-60) Includes supplying, fabricaion, binding and fixing, fy = 415 Mpa, fu = 620 Mpa kg

Tower Anchor bolts and Templates


11 This includes pick-up, transportation and installation on sites of the tower anchoring bolts and setting template. Per site 1.00 1.00 0.00
(for 15 m Tower)
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


12 Tower Base Grouting 25mm thick grouting at tower base with Non-Shrinkage Grouting sq. m 2.56 1.78 0.78
13 Plaster Plaster (12mm, 1:4) sq. m 11.59 11.15 0.44
14 Weather coating Applying 3 coats of weather coat on walls with all necessary accessories and cleanig sq. m 0.00
15 Pole Royal bolts and Templates Per Pole 0.00
RCC (1:1.5:3) Cast-in-situ pile with specified Cement, Sylhet sand (FM 2.2) and shingles (20mm down graded)
including rebar (G-40)(9 nos, dia 20mm), boring/drilling with a 6m (min) long casing, hire charge of rig set with
winch machine, tripod stand, trimie pipe, using bentonite slurry etc. and other necessary accessories, providing
Casting of Cast-in-Situ bored pile,
16 and making point welding at contact point of spiral binders at 600mm intervals and making welded splice by m 348.000 348.00 0.00
500mm dia (1:1.5:3) with shingles welding 300mm length at the lap to of main reinforcements by electric arc welding and breaking of pile head
upto specified length (min 600mm) by any means and removing the dismantled materials -- all as per approved
design upto 20m (max)
17 Neat cement finishing (NCF) Cement with smooth finishing m2 23.720 23.72 0.00
18 Earth Excavation Excavation with filling by excavated soil and dressing cu. m 45.000 40.24 4.76
19 Lean Mix Concrete Mass concrete (1:3:6) with specified cement, sand (FM 1.2) and brick chips (12mm down graded) cu. m 2.250 2.25 0.00
20 Sand Filling Backfilling with sand (FM 1.2) in 150mm layers including carrying, watering, leveling, dressing and compacting cu. m

3. EQUIPMENT SHELTER
21 Brick works (250mm) First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) cu. m 1.63 1.63 0.00
22 Brick works (125mm) First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) sq. m 0.00
23 90mm hollow block fixing for floor (100mmX100mmX80mm) on Floor(1:4, with sand of FM 1.2) sq. m 0.00
24 Lean Mix Concrete Mass concrete (1:3:6) with specified cement, sand (FM 1.2) and brick chips (12mm down graded) cu. m 2.58 2.42 0.16
25 Walls Tiles Fitting Cement:Sand Morter(1:4), FM 1.2 sq. m 0.00
26 Floor Tiles Fitting Cement:Sand Morter(1:4), FM 1.2 sq. m 0.00
27 Plaster (12mm) (1:4) cement and local sand (FM 1.2) ratio (1:4) for walls sq. m 138.00 137.63 0.37
28 Weather coating on Outside wall Applying 3 coats of weather coat on walls with all necessary accessories and cleanig sq. m 165.00 163.64 1.36
29 Flexible Roof Compound Applying 2 coats of Flexible Roof Compound on roof with all necessary accessories and cleaning sq. m 0.00
30 Steel Door for equipment room Based on attached drawing (Supply and fixing) no 0.00
Indoor Cable Ladders (Aluminium, 400 This includes supply, delivery & installation of outdoor cable ladder with all accessories - Reference : Model
31 m 0.00
mm wide) Drawings
32 Rain water pipe 75mm uPVC with bend m 0.00
33 Corrugated steel sheet with Purling Reference Model Drawing as attached (Supply and fixing) m2 55.00 50.50 4.50
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


34 Girder/ Steel Beam Reference Model Drawing as attached (Supply and fixing) m 0.00
35 Outdoor Wire-mesh Fencing Reference Model Drawing as attached (Supply and fixing) no 0.00
36 Outdoor Wire-mesh Door Reference Model Drawing as attached (Supply and fixing) no 0.00
6mm dia MS rod @ 114 mm c/c with outer frame having 38 x 38 x 6 mm MS Angle. (Supply and fixing)
37 Outdoor Grill Fencing sq. m 56.00 54.16
Reference Model Drawing as attached
38 Outdoor Grill Door Reference Model Drawing as attached (Supply and fixing) no 1.00 1.00
Picked Jhama Brick chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and
RCC Works (1:2:4) with wooden
39 specified cement with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using cu. m 26.00 24.63 1.37
formworks for both GF and RT sites Wooden Formworks/shuttering, props and necessary supports etc., Strength fc = 17Mpa

40 Grade Reinforcement with material, labour, straightening, placement and binding with nail and wire and all
Mild Steel Deformed Bar (G-40) other acitivities
kg 3,596.00 3,590.58

Mild Steel Deformed Bar (G-60) Includes supplying, fabricaion, binding and fixing, fy = 415 Mpa, fu = 620 Mpa kg
40 125 Brick works sq. m
41 Plaster (12mm) (1:4) cement and local sand (FM 1.2) ratio (1:4) for walls sq. m 27 26.01 0.99
42 Earth Excavation Excavation with filling by excavated soil and dressing cu. m 55 51.68 3.32
43 Neat cement finishing (NCF) Cement with smooth finishing sq. m 46 46.14 -0.14
44 Column with base no 6 6.00
45 Sand Filling Backfilling with sand (FM 1.2) in 150mm layers including carrying, watering, leveling, dressing and compacting cu. m
Synthetic enemel paint sq.m 57.00 54.16 2.84

4. GENERATOR SHELTER
46 Corrugated steel sheet with Purling Reference Model Drawing as attached (Supply and fixing) sq.m
47 Girder/ Steel Beam Reference Model Drawing as attached (Supply and fixing) m
48 Outdoor Wire-mesh Fencing Reference Model Drawing as attached (Supply and fixing) sq.m
49 Outdoor Wire-mesh Door Reference Model Drawing as attached (Supply and fixing) no
6mm dia MS rod @ 114 mm c/c with outer frame having 38 x 38 x 6 mm MS Angle. (Supply and fixing)
50 Outdoor Grill Fencing Reference Model Drawing as attached
sq.m
51 Outdoor Grill Door Reference Model Drawing as attached (Supply and fixing) no
Picked Jhama Brick chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and
RCC Works (1:2:4) with wooden
52 specified cement with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using cu.m
formworks for both GF and RT sites Wooden Formworks/shuttering, props and necessary supports etc., Strength fc = 17Mpa

53 125 Brick works sq.m


54 Plaster (12mm) (1:4) cement and local sand (FM 1.2) ratio (1:4) for walls sq.m 0.00
55 Earth Excavation Excavation with filling by excavated soil and dressing cu.m 0.00
56 Neat cement finishing (NCF) Cement with smooth finishing sq.m 0.00
57 Sand filling cu.m
58 Column with base no 0.00
59 Synthetic enemel paint sq.m 0.00
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


5. Boundary Wall
Barbed Wire (with angle post) (50 x
Supplying, fitting and fixing 12BWG barbed (2 ply, 4 points @ 112mm c/c)wire @ 150mm c/c with Angle 52 52.77
60 (50x50x5 mm) post[ (300mm embeded in RCC) 600mm vertical and 300 mm inclined with all necessary sq.m
50 x 5) accessories. Ref: Model Drawing
61 250mm brick works First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) cu.m 0.63 0.57
62 125mm brick works First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) sq.m 145 149.53
63 Earth Excavation Excavation with filling by excavated soil and dressing cu.m 115 114.38
64 Weather coating Applying 3 coats of weather coat on walls with all necessary accessories and cleanig sq.m 458 457.84
65 Plaster (12mm) (1:4) cement and local sand (FM 1.2) ratio (1:4) for walls sq.m 459 409.84
17.36
Picked Jhama Brick chips (20mm down graded), Sylhet sand (FM 2.2)(50%), local sand (FM 1.2) (50%) and
RCC Works (1:2:4) with wooden
66 specified cement with reinforcement placing, mixing with mixer machine, compacting with vibrator etc. and using cu.m 17.39
formworks for both GF and RT sites Wooden Formworks/shuttering, props and necessary supports etc., Strength fc = 17Mpa

67 Mild Steel Deformed Bar (G-40) Includes supplying, fabricaion, binding and fixing, fy = 276 Mpa, fu = 482 Mpa kg 2259 2,287.99

Mild Steel Deformed Bar (G-60) Includes supplying, fabricaion, binding and fixing, fy = 415 Mpa, fu = 620 Mpa kg
68 Main gate Set 1.00 1.00 0.00
69 Lean Mix Concrete Mass concrete (1:3:6) with specified cement, sand (FM 1.2) and brick chips (12mm down graded) cu. m 1.600 1.60
70 Sand Filling Backfilling with sand (FM 1.2) in 150mm layers including carrying, watering, leveling, dressing and compacting cu.m
Neat cement finishing (NCF) Cement with smooth finishing sq. m 53.6 53.50 0.10
6. ELECTRICAL WORKS
Double Tube Light fittings with Tube
71 Supply, Delivery and Installation to site no 1 1.00 0.00
Light
Supply, Delivery and Installation to site (Outside the equipment room) (Enegery Saving Spot light fitting with
Security Light (Spot Light) with
72 23W energy saving light, made of steel sheet base, powder coated paint etc. with all necessary wiring and m 1 1.00 0.00
Energy Saving bulb accessories
73 Weather Proof Switch Supply, Delivery and Installation to site (Outside the equipment room) m
74 3 pin switch Socket 13A Flat type Supply, Delivery and Installation to site (for AC) m

75 3 Pin switch Socket 13A Round type Supply, Delivery and Installation to site (for equipments) m
76 2 Pin Socket with switch Supply, Delivery and Installation to site no 1 1.00 0.00
77 2 Gang Switch Supply, Delivery and Installation to site no 2 2.00 0.00
78 Plastic Board Supply, Delivery and Installation to site (Plastic board 75mm x 75mm 50mm) no 0.00
79 Wiring Cable (2.5rm) Supply, Delivery and Installation to site 40 40.00
80 Wiring Cable (6rm) Supply, Delivery and Installation to site no 0.00
81 PVC Channel (25mm) Supply, Delivery and Installation to site m 2 2.00
82 Flxible Pipe (25mm) Supply, Delivery and Installation to site m 28 25.00
83 MDB installation Delivery from Warehouse and Installation to site no 1.00 1.00 0.00
84 AVR (15 KVA) installation Delivery from Warehouse and Installation to site no
85 AC Installation Delivery from Warehouse and installation to site (Window type) no
Supply & Installation of TriPOD Stand
86 MDB tripod Reference as per attached Drawing
no

87 Air Conditioner Control Unit (ACU) Delivery from Warehouse and Installation to site no
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


no
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


7. External Alarm System
Unauthorized intrusion detector/Door
88 Supply, Delivery and Installation to site no
Alarm
Water leak monitoring Sensor/Water
89 Supply, Delivery and Installation to site m
Sensor
Temperature Monitioring
90 Supply, Delivery and Installation to site no
sensor/Thermostat
91 Fire detector Supply, Delivery and Installation to site no
92 Smoke detector Supply, Delivery and Installation to site no
93 Genset Monitoring Alarms Supply, Delivery and Installation to site no
8. Cable Access To site
Outdoor Cable Ladder (G.I) This includes supply, delivery & installation of outdoor cable ladder with all accessories - Reference : Model 15.00
94 m 22.00 7.00
(400mm wide) Drawings
This includes supply, delivery & installation of outdoor cable ladder with all accessories - Reference : Model
95 Indoor cable ladder Drawings
m
9. SITE GROUNDING SYSTEM (EXCLUDING TOWER GROUNDING ABOVE PEDESTAL) and ladder support
96 Grounding pit (550mm x 550mm X 600mm) Grounding PIT with 125mm Brick wall Pcs. 4.00 2.00 2.00
97 RCC Grounding pit Cover 550mm x 550mm x 75mm RCC (1:2:4) cover with reinforcement (G-40) Pcs. 2.00 2.00 0.00
98 Boring (2 no. of boring, 20m each) m 126.00 40.00 86.00
99 37mm G.I Pipe Used in the pit and in the RT site from pit m 12.00
50rm Copper Cable/ Green Cable for 115.00
100 In the grounding pit and for pit to pit connection only m 63.00 -52.00
boring pit
101 MGB Bar with required nuts (400mm x 75mm x 6mm Thick with 6 no 10mm holes) no 20.00 3.00 17.00
102 16mm dia Copper Rod Used in the pit and in the loop of GF site m 20 18.00 2.00
103 Insulator Used in fixing the bas bar in the grounding system no 10 10.00
104 MGB Bar with required nuts (300mm x 75mm x 6mm Thick with 6 no 10mm holes) m 30.00 3.00 27.00
105 80 rm Aluminium Cable 80rm aluminum cable used in RT site from pit to tower legs. m 0.00
106 50 rm Aluminium Cable used in the site for grounding purpose m 65 60.00
107 50 rm Copper Cable 50rm Copper cable in the loop for GF site only m
Installation Cost (Gas welding, Cable
108 for joinging the cable with cupper rod per site 1 1.00
Lux)
109 C Clamp Used for cable clampling no 0.00
Supplying and fixing with fitting accessories, i.e. bends, sockets, elbows, tee, union etc; wall thickness 4.05 mm,
110 GI pipe ( 25mm) m 4.00 3.00
Outside dia 33.4mm, weight 2.97 kg/m, strength 50 kg/cm 2
Supplying and fixing with fitting accessories, i.e. bends, sockets, elbows, tee, union etc; wall thickness 4.05 mm,
111 GI pipe (38mm) Outside dia 48mm, weight 4.43 kg/m, strength 50 kg/cm 2
m
Supplying and fixing with fitting accessories, i.e. bends, sockets, elbows, tee, union etc; wall thickness 4.05 mm,
112 GI pipe ( 50mm) m
Outside dia 59.8mm, weight 6.17kg/m, strength 50 kg/cm 2
Supplying and fixing with fitting accessories, i.e. bends, sockets, elbows, tee, union etc; wall thickness 4.05 mm,
113 GI pipe ( 75mm) for ladder support Outside dia 88.1mm, weight 10.10kg/m, strength 50 kg/cm 2
m
MB5854 Submitted On
PO No. Airtel Bangladesh Infra/PUR/939
Final BOQ 24-Nov-11

Site ID. MB5854 RFTI CW Start 24-Jul-11


Munir Sukhtian
Site type: 40m tower, ODU GF/RT: GF CW SP: International Ltd.(Nour
Bangla)

Item No Description Specification/Brand Unit As Planed Qty As Built Qty Variation


10. PERMANENT / COMMERCIAL POWER
This includes supply and Installation of 16rm cables with necessary sockets/connectors from electric pole to 25.00 25.00
114 16rm Electric Cables meter
m
This includes, application fees, supply of 3-phase meter, security deposit money for 12 KW, meter board, meter
115 Power Application & Facilitation case, Coordination, and facilitation. The SP has the responsibility to have commercial power connected to the sq. m
said site at the point of site handover to Warid/RFTI.
11. TESTING
Concrete Test Report for Tower Concrete test report from BUET or any Concrete testing authority for Tower Beam(3days and 28 days, Total 6 1.00 1.00 0.00
116 cylinders
per site
Foundation
11. Access Road
117 Access road, type-A As per design and specification m 12.00
118 Access road, type-B As per design and specification m
119 Access road, type-C As per design and specification m
120 Access road, type-D As per design and specification m
121 Excavation Excavation with filling by excavated soil and dressing m3
122 250mm Brick First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) m3
123 Plaster Plaster (12mm, 1:4) m2
124 NCF Cement with smooth finishing m2
125 Brick Flat Soaling One layer (75mm) brick flat soling with first class bricks, filling the interstices with local sand (FM 0.8) m2
126 Sand filling Backfilling with sand (FM 1.2) in 150mm layers including carrying, watering, leveling, dressing and compacting m3
127 125mm brick wall First class brick with specified cement and local sand (FM 1.5) mortar ratio (1:4) m3
128 Lean mix cement concrete Mass concrete (1:3:6) with specified cement, sand (FM 1.2) and brick chips (12mm down graded) m3
12. Others
129 Head Carring m 300.00
130 Sand filling m3 153.00
131 Brick Flat Soaling m2 67.30
132 4" G.I Pipe m 6.00
133 Earth Excavation for Access Road m3 54.00
134
135
136
137
Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

1. Tower Foundation
1.1 RCC Works (1:1.5:3) with wooden formworks for RT Sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Beam-B3 0 0 0 0 0.00
2 Beam-B2 0 0 0 0 0.00
3 Beam-B1 0 0 0 0 0.00
4 Column-C 0 0 0 0 0.00
5
Total 0.00
1.2 RCC Works (1:1.5:3) with wooden formworks for GF Sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 13
1 Pile cap 2,300 2,300 774 4 16.38
2 Pedestal 800 800 1,000 4 2.56
0.00
3 Tie Beam 6,200 300 600 0 0.00
Total 18.94
1.3 Casting of Cast-in-Situ bored pile, 500mm dia (1:1.5:3) with shingles
Item No Structure Description Length (mm) Structure no. Length (m) RLD Ref. Page No. 12
1 Pile length 21,750 16 348.00
2 0 0 0.00
Total 348.00
1.4 Pole Base
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Pole base 0.00
2 Guy base 0.00
Total 0.00
1.5 RCC Works (1:2:4) with wooden formworks for both GF and RT sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 0 0 0 0 0.00
2 0 0 0 0 0.00
3 0 0 0 0 0.00
Total 0.00
1.6 Lean mix concrete
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 13
1 Pile cap 2,300 2,300 100 4 2.12
2 lader suport base 760 600 300 1 0.14
3 0.00
4 0 0 0 0 0.00
Total 2.25
1.7 Neat cement finishing
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 13
1 Top of pedestal 800 800 4 2.56
2 Pedestal 2,300 2,300 4 21.16
0.00
0.00
3 Tie Beam 6,200 1,800 0 0.00
Total 23.72
1.8 Plaster
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 13
1 Beam-B3 0.00
2 Beam-B2 0.00
3 Beam-B1 0.00
4 Column-C 0.00
5 Pedestal 700 800 800 4 9.52
6 Tie Beam 0 0 0 0 0.00
7 Deduction for B-1 face 0.00
8 Deduction for B-2 face 0.00
9 Tower Ladder Support base 2,720 300 1 1.63
10 0.00
Total 11.15
1.9 Weather coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Beam-B3 0.00
2 Beam-B2 0.00
3 Beam-B1 0.00
4 Column-C 0.00
5 Pedestal 0.00
6 Pole base 0.00
7 Deduction for B-1 face 0.00
8 Deduction for B-2 face 0.00
9 0.00
10 0.00
Total 0.00

Munir Sukhtian International Ltd.( Nour Bangla) Page 8 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

1.10 Earth excavation


Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 13
1 Pile cap 2,900 2,900 1,174 4 39.49
Tower Ladder Support base 1,500 1,000 500 1 0.75
0.00
2 0 0 0 0 0.00
Total 40.24
1.11 Sand filling
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 13
1 Pile cap 2,300 2,300 100 4 2.12
2 0 0 0 0 0.00
Total 2.12
1.12 Mild Steel Deformed Bar (G-40)
1 Bar type No of Bar(No) Bar dia.(mm) Length (mm) Struc. Qty (No) WT in Kg RLD Ref. Page No. 13
Main 0 0 0 0.00
Tortional bar 0 0 0 0.00
Main stirrup 0 0 0 0.00
3
B-

Mid stirrup 0.00


Separator 0 0 0 0.00
Main 0 0 0 0.00
Tortional bar 0 0 0 0.00
2

Main Stirrup 0 0 0 0.00


B-

Mid stirrup 0 0 0 0.00


Separator 0 0 0 0.00
Main 0 0 0 0.00
Tortional bar 0 0 0 0.00
Main Stirrup 0 0 0 0.00
1
B-

Mid stirrup 0.00


Separator 0 0 0 0.00
Main 12 20 7,600 0.00
am

Main Stirrup 51 10 700 0.00


Be
tie

Mid stirrup 2 12 7,000 0.00


Main 24 20 1,911 4 452.42
Main Stirrup 12 10 3,000 4 86.86
al
st
de

Mid stirrup 12 10 2,140 4 61.96


Pe

Additional binder 8 16 2,700 4 136.36


ST long bar in longer direction 41 16 2,874 4 743.91
ST long bar in shorter direction 41 16 2,874 4 743.91
p
ca

Chair 4 16 2,800 4 70.71


le
Pi

Cross bar 24 12 900 4 76.71


Total 2,372.83
2. Shelter Foundation
2.1 RCC Works (1:2:4) with wooden formworks for both GF and RT sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 14
1 Footing 3,900 3,100 425 2 10.28
2 Column 3,430 300 300 4 1.23
3 GB 6,581 300 400 2 1.58
4 Floor beam 5,402 300 400 2 1.30
5 Floor slab 8,181 5,151 165 1 6.95
6 Floor beam 8,181 300 400 2 1.96
7 Stair slab 4,500 1,000 150 1 0.68
8 stair Beam 1,000 250 300 1 0.15
9 stair step 1,000 250 250 8 0.50
Total 24.63
2.2 Lean mix concrete
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 14
1 Footing 3,900 3,100 100 2 2.42
2 0 0 0 0 0.00
3 0 0 0 0 0.00
Total 2.42
2.3 Plaster `
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 14 & 15
1 Column 2,470 300 300 4 11.86
2 Floor beam 5,402 1,100 0 2 11.88
3 Floor beam 8,181 1,100 0 2 18.00
4 Slab top 8,181 5,151 0 1 42.14
5 Slab bottom 7,581 4,551 0 1 34.50
6 Slab Side 26,664 0 165 1 4.40
7 Stair slab 4,500 1,000 1 4.50
8 Stair slab site 9,000 0 150 1 1.35
9 stair step 1,000 500 0 8 8.00
10 stair step side 31,064 1 0 8 0.50
11 stair Beam 1,000 250 0 1 0.50
12
Total 137.63

Munir Sukhtian International Ltd.( Nour Bangla) Page 9 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

2.4 Neat cement finishing


Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 14, 15 & 16
1 Column 0 0 0 0.00
2 Slab 8,181 5,151 1 42.14
3 Floor beam 0 0 0 0.00
4 Scatting 0 0 0 0.00
5 Stair step 1,000 500 8 4.00
6
Total 46.14
2.6 Earth excavation
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 14
1 Footing 4,500 3,700 1,500 2 49.95
2 GB 2,881 600 500 2 1.73
3 0 0 0 0 0.00
Total 51.68
2.7 Sand filling
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0.00
2 0 0 0 0 0.00
Total 0.00
2.8 Mild Steel Deformed Bar (G-40)
Item Name Bar type No of Bar(No) Bar dia.(mm) Length (mm) Struc. Qty (No) WT in Kg RLD Ref. Page No. 16, 17 & 18
ST long bar in longer direction 0 0 0 0 0.00
CKD bar in longer direction 0 0 0 0 0.00
Extra top in longer direction 0 0 0 0 0.00
Top Binder in longer direction 0 0 0 0 0.00
ST long bar in shorter direction 0 0 0 0 0.00
b
la

CKD bar in shorter direction 0 0 0 0 0.00


fS
o
Ro

Extra top in shorter direction 0 0 0 0 0.00


Top Binder in shorter direction 0 0 0 0 0.00
Corner Bar 0 0 0 0 0.00
Cantilever Binder shorter &
0 0 0 0 0.00
longer
ST long bar in longer direction 152 10 5,113 1 479.90
CKD bar in longer direction 46 10 3,785 0 0.00
Extra top in longer direction 14 10 6,800 0 0.00
Top Binder in longer direction 5 10 6,800 0 0.00
ST long bar in shorter direction 91 10 8,143 1 456.25
b
sla

CKD bar in shorter direction 0 0 0 0 0.00


or
Flo

Extra top in shorter direction 24 10 3,785 1 0.00


Top Binder in shorter direction 3 10 3,785 1 0.00
Corner Bar 0 0 0 0 0.00
Cantilever Binder shorter &
longer 0 0 0 0 0.00
Main 6 20 7,605 2 225.06
Tortional bar 0 0 0 0 0.00
Main Stirrup 34 10 1,100 2 45.99
GB

Mid stirrup 0.00


Separator 0 0 0 2 0.00
Main 8 16 4717 4 238.23
n
m

Main Stirrup 26 10 1148 4 73.93


lu
Co

Mid stirrup 26 10 949 4 61.08


Main 8 20 8,605 2 339.53
Main 8 16 5,826 2 147.12
am
be

Main Stirrup 79 10 1,200 2 116.52


or
Flo

Mid stirrup 0 0 0 0 0.00


ST long bar in longer direction 86 12 4125 2 629.89
ST long bar in shorter direction 108 12 3325 2 637.61
g
tin

Chair 4 12 1,900 2 13.49


o
Fo

0 0 0 0 0.00
Main bar R2 10 12 6317.25 1 57.43
Main bar R1 10 12 2625 1 23.86
Short Bar Top in longer direction 14 10 924 1 7.76
r
ai

Short Bar Bott.in longer direction 26 10 924 1 14.81


St

Waste Beam Main Bar 6 16 1650 1 15.63


Waste Beam Stirup 7 10 1500 1 6.47
Total 3,590.58

Munir Sukhtian International Ltd.( Nour Bangla) Page 10 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

2.9 Plaster
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 20
1 Column 0.00
2 GB 0.00
3 Floor beam 0.00
4 Floor slab 0.00
5 Roof slab 0.00
6 Brick wall 2,550 2,550 2 26.01
7 Brick wall 0.00
8 Brick wall 0.00
9 Brick wall 0.00
10 Parapet wall 0.00
Total 26.01
2.10 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Volume (m3) RLD Ref. Page No. 20
1 BTS room wall all sides 2,550 250 2,550 1 1.63
2 Subtruct for door 0 0 0 0 0.00
3 Subtruct for cable duct 0 0 0 0 0.00
4 0.00
Total 1.63
2.11 125mm Brick Wall
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Parapet wall 0 0 0 0.00
2 0 0 0 0.00
3 0 0 0 0.00
Total 0.00
2.12 Wall Tiles (Glazed) fitting
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Wall in longer direction 0 0 0 0.00
2 Wall in shorter direction 0 0 0 0.00
3 Deduction for door 0 0 -1 0.00
Total 0.00
2.13 Floor Tiles (Homogeneous) fitting
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Floor area 0 0 0 0.00
2 Deduction 0 0 -1 0.00
3 0 0 0 0.00
Total 0.00
2.14 90mm hollow block fixing for floor
Item No Structure Description Length (mm) Width (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Floor area 0 0 0 0.00
2 Deduction 0 0 -1 0.00
3 0 0 0 0.00
Total 0.00
2.16 Weather Coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Column 0.00
2 GB 0.00
3 Floor beam 0.00
4 Floor slab 0.00
5 Roof slab 0.00
6 Brick wall 0.00
7 Brick wall 0.00
8 Brick wall 0.00
9 Brick wall 0.00
10 Parapet wall 0.00
Total 163.64
2.17 Patent Stone
Item No Structure Description Length (mm) Width (mm) Thickness (mm) Structure no. Volume (m3) RLD Ref. Page No. 16
1 Floor 2,450 1,450 100 1 3.55
2 Roof slab 0 0 0 0 0.00
3 Deduct lader access 0 0 0 0 0.00
Total 3.55
2.18 Corrugated steel sheet with Purling
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No. 20
1 Sheet and purling 8,781 5,751 1 50.50
0 0 0 0.00
0 0 0 0.00
Total 50.50

Munir Sukhtian International Ltd.( Nour Bangla) Page 11 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

2.19 Ootdoor Wire Mesh Fencing


Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Outdoor Wire-mesh Fencing in longer direction 0 0 0.00
Outdoor Wire-mesh Fencing in shorter direction 0.00
Deduction for door -1 0.00
Total 0.00
2.20 Ootdoor Grill Mesh Fencing
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No. 20 & 22
1 Outdoor grill-mesh Fencing in longer direction 7,981 2,550 2 40.70
2 Outdoor grill-mesh Fencing in shorter direction 5,051 2,700 1 13.64
3 Outdoor grill-mesh Fencing in shorter direction 5,051 2,400 1 12.12
4 Deduction for wall 4,191 2,200 -1 -9.22
5 Deduction for door 1,400 2,200 -1 -3.08
6 54.16
2.21 Synthetic Enamel Paint
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No. 20 & 22
Outdoor grill-mesh Fencing in longer direction 0.00
Outdoor grill-mesh Fencing in shorter direction 0.00
Deduction for door 0.00
Total 54.16
2.22 Flexible roofing compound
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Roof area 0 0 0 0.00
Carnish 0.00
Deduction -1 0.00
Total 0.00
3. Generator Shelter
3.1 RCC Works (1:2:4) with wooden formworks for both GF and RT sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0 0 0.00
2 Column 0 0 0 0 0.00
3 GB 0 0 0 0 0.00
4 Floor beam 0 0 0 0 0.00
5 Floor slab 0 0 0 0 0.00
6 Roof slab 0 0 0 0 0.00
Total 0.00
3.2 Lean mix concrete
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0 0 0.00
2 0 0 0 0 0.00
3 0 0 0 0 0.00
Total 0.00
3.3 Plaster `
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Column 0.00
2 Floor beam 0.00
3 Slab top 0.00
4 Slab bottom 0.00
5 Stair 0.00
6 0.00
7 0.00
8 0.00
9 0.00
10 0.00
Total 0.00
3.4 Neat cement finishing
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Column 0 0 0 0.00
2 Slab 0 0 0 0.00
Floor beam 0 0 0 0.00
Scatting 0 0 0 0.00
Stair 0 0 0 0.00
0 0 0 0.00
Total 0.00
3.6 Earth excavation
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0 0 0.00
GB 0 0 0 0 0.00
0 0 0 0 0.00
Total 0.00
3.7 Sand filling
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0 0 0.00
0 0 0 0 0.00
Total 0.00

Munir Sukhtian International Ltd.( Nour Bangla) Page 12 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

3.8 Mild Steel Deformed Bar (G-40)


Item Name Bar type No of Bar(No) Bar dia.(mm) Length (mm) Struc. Qty (No) WT in Kg RLD Ref. Page No.
ST long bar in longer direction 0 0 0 0 0.00
CKD bar in longer direction 0 0 0 0 0.00
Extra top in longer direction 0 0 0 0 0.00
Top Binder in longer direction 0 0 0 0 0.00
ST long bar in shorter direction 0 0 0 0 0.00
d
Pa

CKD bar in shorter direction 0 0 0 0 0.00


et
ns
Ge

Extra top in shorter direction 0 0 0 0 0.00


Top Binder in shorter direction 0 0 0 0 0.00
Corner Bar 0 0 0 0 0.00
Cantilever Binder shorter & 0 0 0 0 0.00
longer
ST long bar in longer direction 0 0 0 0 0.00
CKD bar in longer direction 0 0 0 0 0.00
Extra top in longer direction 0 0 0 0 0.00
Top Binder in longer direction 0 0 0 0 0.00
ST long bar in shorter direction 0 0 0 0 0.00
b
sla

CKD bar in shorter direction 0 0 0 0 0.00


or
Flo

Extra top in shorter direction 0 0 0 0 0.00


Top Binder in shorter direction 0 0 0 0 0.00
Corner Bar 0 0 0 0 0.00
Cantilever Binder shorter & 0 0 0 0 0.00
longer
Main 0 0 0 0 0.00
Tortional bar 0 0 0 0 0.00
Main Stirrup 0 0 0 0 0.00
GB

Mid stirrup 0.00


Separator 0 0 0 0 0.00
Main 0 0 0 2 0.00
n
m

Main Stirrup 0 0 0 0 0.00


lu
Co

Mid stirrup 0 0 0.00


Main 0 0 0 0 0.00
am

Main Stirrup 0 0 0 0 0.00


be
or
Flo

Mid stirrup 0 0 0 0 0.00


ST long bar in longer direction 0 0 0 0 0.00
ST long bar in shorter direction 0 0 0 0 0.00
g
tin

Chair 0 0 0 0 0.00
o
Fo

0 0 0 0 0.00
Total 0.00
3.9 Plaster
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Column 0.00
2 GB 0.00
3 Floor beam 0.00
4 Floor slab 0.00
5 Roof slab 0.00
6 Brick wall 0.00
7 Brick wall 0.00
8 Brick wall 0.00
9 Brick wall 0.00
Total 0.00
3.10 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Side wall 0 0 0 0 0.00
2 0 0 0 0 0.00
Total 0.00
3.11 125mm Brick Wall
Item No Structure Description Length (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Side wall 0 0 0 0.00
2 0 0 0 0.00
3 0 0 0 0.00
Total 0.00

Munir Sukhtian International Ltd.( Nour Bangla) Page 13 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

3.12 Soil Excavation


Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0.00
2 GB 0.00
3 0.00
Total Volume 0.00
3.13 Weather Coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Column 0.00
2 GB 0.00
3 Floor beam 0.00
4 Floor slab 0.00
5 Roof slab 0.00
6 Brick wall 0.00
7 Brick wall 0.00
Total 0.00
3.14 Corrugated steel sheet with Purling
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Sheet and purling 0 0 0 0.00
0 0 0 0.00
0 0 0 0.00
Total Area 0.00
3.15 Ootdoor Wire Mesh Fencing
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Outdoor Wire-mesh Fencing in longer direction 0 0 0 0.00
Outdoor Wire-mesh Fencing in shorter direction 0.00
Deduction for door -1 0.00
Total Area 0.00
3.16 Ootdoor Grill Mesh Fencing
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Outdoor grill-mesh Fencing in longer direction 0 0 0 0.00
Outdoor grill-mesh Fencing in shorter direction 0.00
Deduction for door -1 0.00
Total Area 0.00
3.17 Synthetic Enamel Paint
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Outdoor grill-mesh Fencing in longer direction 0 0 0 0.00
Outdoor grill-mesh Fencing in shorter direction 0.00
Deduction for door -1 0.00
Total Area 0.00
3.17 Lean mix cement concrete
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
Floor area 0 0 0 0.00
Deduction -1 0.00
0.00
Total Area 0.00

Munir Sukhtian International Ltd.( Nour Bangla) Page 14 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

4. Boundary Wall
4.1 Barbed Wire (with angle post) (50 x 50 x 5)
Item No Structure Description Length (mm) Width (mm) Structure no. Area (m2) RLD Ref. Page No. 5,6 & 7
1 Barbed wire 69,160 800 1 55.33
2 Barbed wire 0.00
3 Deduction for main gate 3,200 800 -1 -2.56
Total Area 52.77
4.2 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Volume (m3) RLD Ref. Page No. 6 & 7
1 Brick wall 4,080 250 310 1 0.32
2 Brick wall 3,310 250 310 1 0.26
3 Brick wall 0 0 0 0 0.00
4 Deduction 0 0 0 -1 0.00
Total 0.57
4.3 125mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Structure no. Area (m2) RLD Ref. Page No. 6 & 7
1 Brick wall gate side 4,080 2,450 3 29.99
2 Brick wall side -1 4,080 2,450 3 29.99
3 Brick wall side -1 4,080 2,350 1 9.59
4 Brick wall side -2 4,080 2,450 4 39.98
5 Brick wall side -4 4,080 2,450 4 39.98
6 Deduction for main gate 3,250 2,850 0.00
Total Area 149.53
4.4 Earth excavation
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 14 & 5
1 Footing 1,600 1,600 2,500 16 102.40
2 GB 43,560 550 500 1 11.98
3 0.00
Total Volume 114.38
4.5 Weather Coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Brick wall 68,800 0 0.00
2 Top beam 68,500 250 0.00
3 Column 2,000 200 200 30 48.00
4 Deduction 0.00
5 0.00
Total 457.84
4.6 Plaster
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No. 6 & 7
1 Brick wall gate side 4080 2350 3 57.53
2 Brick wall gate side 4080 210 1 1.71
3 Brick wall side-1 4080 2350 3 57.53
4 Brick wall side-1 4080 2710 1 22.11
5 Brick wall side-2 4080 2350 4 76.70
6 Brick wall side-3 4080 2350 4 76.70
7 Column 250 250 2600 5 13.06
8 Column 250 250 3610 12 43.38
9 Top beam 61080 250 150 1 48.86
10 T2. Beam 4080 250 250 3 12.24
11 Deduction for main gate -1 0.00
12 GB 52,800 250 250 0 0.00
Total 409.84
4.7 RCC Works (1:2:4) with wooden formworks for both GF and RT sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No. 14 & 5
1 Footing 1,000 1,000 250 16 4.00
2 GB 65,160 250 400 1 6.52
3 T-beam 61,080 150 250 1 2.29
T2-beam 4,080 250 250 1 0.26
3 Column 3,750 250 250 12 2.81
Column 4,860 250 250 5 1.52
Total 17.39
4.8 Reinforcement Calculation
Item Name Bar type No of Bar(No) Bar dia.(mm) Length (mm) Struc. Qty (No) WT in Kg RLD Ref. Page No. 14 & 5
Main 6 16 19,634 4 743.72
Stirrup 336 10 1,100 1 227.87
GB

Separator 0 0 0 4 0.00
Main 4 16 4,162 15 394.13
n
um

Main Stirrup 26 10 1,025 15 250.37


l
co

Mid Stirrup 26 10 750 0 0.00


Main 4 16 5,272 2 66.57
n
um

Main Stirrup 34 10 1,025 2 43.58


l
co

Mid Stirrup 27 10 750 0 0.00


St in Longer direction 12 12 1,300 16 221.59
St in shorter direction 0 0 0 16 0.00
g
tin

Main Stirrup 0 0 0 16 0.00


o
Fo

Chair 0 0 0 16 0.00
Main 4 12 61,216 1 217.39
am

Stirrup 259 10 600 1 95.69


Be
p

Stirrup 0 0 0 0 0.00
To

Main 4 12 4,654 1 16.53


-2
am

Stirrup 21 10 800 1 10.55


Be

Stirrup 0 0 0 0 0.00
p
To

Total 2,287.99

Munir Sukhtian International Ltd.( Nour Bangla) Page 15 MB-5854


Site ID. MB5854 Site Type: 40m tower, ODU RFTI: 2-Nov-11 CW Started: 24-Jul-11

Munir Sukhtian PO No. Airtel


Site Address: ROUTHGOAN,KULAURA,MOULAVIBAZAR. GF/RT GF CWSP: International Ltd. Bangladesh
(Nour Bangla) Infra/PUR/939

1.6 Lean mix concrete


Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 1,000 1,000 100 16 1.60
2 0 0 0 0 0.00
3 0 0 0 0 0.00
Total 1.60
4.9 Sand filling
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Footing 0 0 0 0 0.00
0 0 0 0 0.00
4.1 NCF
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Guide Wall 69,160 1 300 2 41.50
2 Stair 2,000 200 200 30 12.00
3 0.00
Total 53.50
5. Access Road
5.1 Excavation
Item No Structure Description Length (mm) Width (mm) Depth Volume (m3) RLD Ref. Page No.
Guide Wall 52,800 2,000 1 0.11
Stair 0.00
3,000 1,500 -1 -4.50
Total Volume -4.39
4.2 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Guide Wall 0 0 0 0 0.00
2 Stair 0 0 0 0 0.00
3 0 0 0 0 0.00
4 0 0 0 -1 0.00
Total 0.00
4.3 Brick Flat Soaling
Item No Structure Description Length (mm) Width (mm) Structure no. Area (m2) RLD Ref. Page No.
Access Road 5,000 3,250 1 16.25
Access Road 18,000 1,000 0 0.00
3,250 2,850 0 0.00
Total Area 16.25
4.3 125mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Area (m2) RLD Ref. Page No.
72,000 2,850 0.00
18,000 1,000 0.00
3,250 2,850 0.00
Total Area 0.00
4.6 Plaster
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Guide Wall 0.00
2 Stair 2,000 200 200 30 12.00
3 0.00
Total 12.00
4.6 NCF
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no. Area (m2) RLD Ref. Page No.
1 Guide Wall 69,160 1 300 0 0.00
2 Stair 2,000 200 200 30 12.00
3 0.00
Total 12.00
1.6 Lean mix concrete
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Guide Wall 1,000 1,000 100 18 1.80
2 Stair 0 0 0 0 0.00
3 0 0 0 0 0.00
Total 1.80
4.9 Sand filling
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no. Volume (m3) RLD Ref. Page No.
1 Access Road 0 0 0 0 0.00
0 0 0 0 0.00
Total 0.00
Others Brick Flat Soling for Entrance
Item No Structure Description Length (mm) Width (mm) 0 Area (m2) RLD Ref. Page No.
one layer Brick soling 6,320 5,444 1 34.41
Slope 11,774 2,794 1 32.90
3,250 2,850 0 0.00
Total 67.30

Munir Sukhtian International Ltd.( Nour Bangla) Page 16 MB-5854


Banglalink Project- 2011
Munir Sukhtian International L
Details of Estimating & Costing
Site ID SYL_X0566
Address
Totel Height GF.RT
Tower
B.1.1 Civil Works (Work done quantities)
Detail Calculation
SL Item Code Work Description
No Length
Tower Pile Cap Base 4 2.6
Tower Pile Cap Base 2 2.6
Earth Exavation Deduction Tri-Angle Portion 2
GB Long 2 2.125
GB Short 3 3.075

Tower Pile Cap Base 4 2.3


Tower Pile Cap Base 2 2.3
Earth Filing
GB Long 2 2.125
GB Short 3 3.075

Detail Calculation
SL Item Code Work Description
No Length
Boundary wall base 1 42.61
1 Sand Filing Corner Column 3 0.775
Intermediate Column 25 0.625

Detail Calculation
SL Item Code Work Description
No Length
Tower Pile Cap Base 4 2.3
Tower Pile Cap Base 2 2.3
PC Casting
under pile 14
Deduction Tri-Angle Portion 2

SL Detail Calculation
Item Code Work Description
No Length
Tower Pile 14 0.20

Sub total
Cement
Stone (single
Sylhet Sand
Local Sand
Tower Pile Cap 4 2.30
Tower Pile Cap 2 2.3
Deduction Tri-Angle Portion 2
Sub total
Cement
Stone (3/4 Down sto
Sylhet Sand
Local Sand
R.c.c GB Long 2 5.4
GB Short 3 3.1
BTS Column (C-1)) 6 12.85
Slab Beam(B-1) out long 2 7.25
Slab Beam(B-1) out Short 2 5.10
Slab Beam(B-1) Mid Long 1 7.75
Slab Beam(B-1) Mid Short 1 5.90
Slab Beam(B-2) out long 2 7.25
Slab Beam(B-2) out Short 2 5.10
Slab Beam(B-2) Mid Short 1 5.90
Slab Beam(B-2) out long 2 7.25
Slab Beam(B-1) out Short 2 5.10
Slab Beam(B-1) Mid Short 1 5.90
Slab-1 1 6.70
Slab -2,3 2 6.70
Pit 2 0.55

Detail Calculation
SL Item Code Work Description
No R.C.C Qty
Supply and use of Admixture ASTM C-494 Type E as per PWD item # 58 (b)(v)
b
specifications and irrespective of the floor of works

Detail Calculation
SL Item Code Work Description (m)
No Length

patanstone
Generator Pad 1 2.45

Detail Calculation
SL Item Code Work Description
No Length
Tower Pile Cap Base
16mm Ø Top 4 2.670
16mm Ø Top 4 1.370
16mm Ø Bottom 4 2.670
16mm Ø Bottom 4 1.370
16mm Ø Top Tri-angle 2 2.670
16mm Ø Bottom Tri-angle 2 2.670
16mm Ø Top Tri-angle 2 1.699
16mm Ø Bottom Tri-angle 2 1.699
12mm Ø Chair 4 1.00
Tower Pile Rod
16mm Ø Rod (Up Portion) 16 12.00
10mm Ø Spiral 16 1.25
10mm Ø close Ring 16 1.186
16mm Ø Rod ( Down Portion) 16 6.55
GB
16mm Ø Rod 1 34.98
10mm Ø Stirrup 1 1.51
BTS Column(C-1)
16mm Ø Rod L/S 6 13.15
10mm Ø Stirrup 6 2.210
10mm Ø Stirrup Mid 6 0.47
10mm Ø Stirrup Mid 6 2.35
CB-1
16mm Ø Rod 3 9.90
16mm Ø Rod 3 8.80
10mm Ø Stirrup 3 1.81
Beam B-2
16mm Ø Rod 1 8.25
12mm Ø Rod 1 6.30
12mm Ø Rod 1 6.30
20mm Ø Rod 1 6.65
20mm Ø Rod 1 6.65
10mm Ø Stirrup 1 2.41
10mm Ø Stirrup 1 2.08
20mm Ø Seperator 1 0.34
Beam B-1
16mm Ø Rod 2 8.15
12mm Ø Rod 2 6.30
12mm Ø Rod 2 6.30
20mm Ø Rod 2 6.65
20mm Ø Rod 2 6.65
10mm Ø Stirrup 2 2.11
10mm Ø Stirrup mid 2 0.93
10mm Ø Stirrup Seperator 2 0.29
CB-2
16mm Ø Rod 2 9.90
16mm Ø Rod 2 8.80
10mm Ø Stirrup 2 1.81
Beam B-3
16mm Ø Rod 2 7.95
Mild steel deromed bar(G-60) 12mm Ø Rod 2 6.30
BSRM,RAHIM
C21
STEEL,BASHUNDHARA,MAGNUM
12mm Ø Rod 2 6.65
STEEL 10mm Ø Stirrup 2 1.71
10mm Ø Stirrup 2 1.71
20mm Ø Seperator 2 0.19
Beam B-4
16mm Ø Rod 1 7.95
12mm Ø Rod 1 6.30
16mm Ø Rod 1 6.65
16mm Ø Rod 1 6.65
10mm Ø Stirrup 1 1.71
16mm Ø Seperator 1 0.19
CB-3
20mm Ø Rod 2 10.50
20mm Ø Rod 2 8.80
16mm Ø Rod 2 8.60
16mm Ø Rod 2 8.60
20mm Ø Rod 2 8.80
20mm Ø Rod 2 10.50
12mm Ø Rod 2 2.31
20mm Ø Rod Seperator 2 0.29
Beam B-3
16mm Ø Rod 2 7.95
12mm Ø Rod 2 6.30
12mm Ø Rod 2 6.65
10mm Ø Stirrup 2 1.71
10mm Ø Stirrup 2 1.71
20mm Ø Seperator 2 0.19
Beam B-5
20mm Ø Rod 2 8.35
20mm Ø Rod 2 6.65
16mm Ø Rod 2 6.50
16mm Ø Rod 2 6.50
20mm Ø Rod 2 6.65
20mm Ø Rod 2 8.35
10mm Ø Stirrup 2 2.61
10mm Ø Stirrup mid 2 2.06
20mm Ø Rod Seperator 2 0.44
Slab
10mm Ø Rod ST( Long Direction Stright) 1 8.89
10mm Ø Rod st (short Direction) 1 6.74
10mm Ø Rod 2300 1 2.48
10mm Ø Rod 2200 1 2.38
10mm Ø Rod 1450 4 1.63
12mm Ø Rod ST( Long Direction Stright) 1 8.89
12mm Ø Rod st (short Direction) 1 6.74
12mm Ø Rod 1350 2 1.60
12mm Ø Rod 2300+1350 1 3.80
12mm Ø Rod 1400 2 1.13
10mm Ø Rod ST( Long Direction Stright) 1 8.89
10mm Ø Rod st (short Direction) 2 6.74
10mm Ø Rod 2100 2 2.27
10mm Ø Rod 1500 1 1.70

SL Item Code Work Description


No Length
Bick wall with Beam +4m level 2 40.721
Bick wall with Beam +8m level 2 5.100
paraphet wallwall with Beam 2 31.100
C19 Plaster (12mm)(1:4)
Bick wall with Beam 0m level 2 31.100
column 6 9.510
Slab 3 8.850

Detail Calculation
SL Item Code Work Description
SL Item Code Work Description
No Length
Under GB 1 22.175
Brick Work 250mm
Indor BTS 1 1.3

Detail Calculation
SL Item Code Work Description
No Length
Under GB 1 24.7
indoor GB 1 8.1
Brick Work 125 mm
8 m Height 1 3.80
paraphet wall 1 23.90

Item Code
SL Work Description
No Length
Floor Slub 1 8.181
Stair Trad & Rise 2 2.500
BTS Column 4 1.200
C23 Neat cement finishing(NCF)
Boundary Wall 0 73.160
Pedestal 4 3.200
Pedestal Top 4 0.800

Detail Calculation
Item Code Work Description
SL (m)
No Length

C28 Cement Painting Works(BERGER,AQUA) As same palaster work


Project- 2011
International Ltd.
mating & Costing
Date:

Tower / Pole Ht: 23 M Tower BTS Type:

Detail Calculation (m)


Total Volume Unit Remarks
Breadth Height Volume
1.3 1 13.52 o.k
2.725 1 14.17
-1.12 27.78275 o.k
0.45 0.2 0.3825
0.45 0.2 0.83 o.k
Sub Total: 27.78 m3 29.04
Sub Total: 980.18 cft
1 0.8 7.36 o.k
2.125 0.8 7.82
15.854
0.25 0.2 0.2125
0.25 0.2 0.46 o.k
Sub Total: 15.85 m3
Sub Total: 559.32 cft
Detail Calculation (m)
Total Volume Unit Remarks
Breadth Height Volume
0.5 0.075 1.597875 o.k
0 M3
0.775 0.075 0.135140625
0.625 0.075 0.732421875
Sub Total: 0.00 cft
Filling Sand 0.00 cft
Detail Calculation (m)
Total Volume Unit Remarks
Breadth Height Volume
1 0.1 0.92 o.k
2.125 0.1 0.98
1.76
0.05 0.70
-0.14 o.k
1.76 m3
Sub Total: 62.07 cft
Sub Total with wastage: 62.07 cft
Cement: 7.45 beg
Local Sand: 24.83 cft
Brick chips: 49.66 cft
Detail Calculation (m)
Total Volume Unit
Breadth Height Volume
1.00 10.80 29.635
29.635

Sub total 29.635


Cement 207.446
Stone (singles) 836.424
Sylhet Sand 209.106
Local Sand 209.106
1.00 0.7 6.440
2.125 0.7 6.84
-0.98 12.303 o.k
Sub total 12.303
Cement 86
Stone (3/4 Down stone) chips 347
Sylhet Sand 87
Local Sand 87
0.25 0.4 1.085
0.25 0.4 0.92 o.k
0.40 0.80 24.672
0.25 0.60 2.175
0.25 0.60 1.530
0.25 0.60 1.163
0.25 0.60 0.885
0.25 0.60 2.175
56.34
0.25 0.70 1.785
0.25 0.70 1.033
0.35 0.90 4.568
0.25 0.70 1.785
0.35 0.90 1.859
8.85 0.150 8.894
8.85 0.140 16.603
0.55 0.08 0.045
Total: 56.34 m3
Sub Total: 1987.68 cft
Cement: 281.70 beg
Local Sand: 795.07 cft
Brick chips 1590.14 cft
Detail Calculation (m)
Unit Remarks
R.C.C Qty Qty per cum (L)
0.00 L
Sub Total: L

Unit Remarks
Breadth Height Volume
0.36
1.45 0.10 0.355
Sub Total: 0.36 m3
Sub Total: 12.53 cft
Sub Total with wastage: 12.95 cft
Cement: 1.55 beg
Local Sand: 5.18 cft
Brick chips: 11.40 cft
Detail Calculation (m)
Total Weight (kg) Unit Remarks
No of Bar Unit Wt. (kg/m) Weight (kg)

5.00 1.578 84.27


12.00 1.578 103.77
7.00 1.578 117.97
12.00 1.578 103.77
3.00 1.578 25.28
4.00 1.578 33.71
12.00 1.578 64.34
12.00 1.578 64.34
4.00 0.887 14.19
Total
10 1.578 3029.76
89 0.616 1096.48
9 0.616 105.20
10 1.578 1653.74
Total
8 1.578 441.59
230 0.616 213.94

20 1.578 2490.08
79 0.616 645.28
79 0.616 138.40
79 0.616 686.16

4 1.578 187.47
4 1.578 166.64
48 0.616 160.55

4 1.578 52.07
2 0.887 11.18
2 0.887 11.18
4 2.466 65.60
5 2.466 81.99
27 0.616 40.08
27 0.616 34.59
27 2.466 22.64

4 1.58 102.89
2 0.89 22.35
2 0.89 22.35
3 2.47 98.39
4 2.47 131.19
31 0.62 80.59
31 0.62 35.52
31 2.47 44.34

4 1.578 124.98
4 1.578 111.09
48 0.616 107.04

3 1.578 75.27
2 0.887 22.35
4 0.887 47.19
26 0.616 54.77
26 0.616 54.77
26 2.466 24.36

3 1.578 37.64
2 0.887 11.18
2 1.578 20.99
4 1.578 41.97
26 0.616 27.39
26 1.578 7.80

4 2.466 207.14
4 2.466 173.61
2 1.578 54.28
2 1.578 54.28
4 2.466 173.61
4 2.466 207.14
49 0.887 200.80
49 2.466 70.08

3 1.578 75.27
2 0.887 22.35
4 0.887 47.19
26 0.616 54.77
26 0.616 54.77
26 2.466 24.36

5 1.578 131.76
5 0.887 58.99
2 0.887 23.06
2 0.616 16.02
5 0.616 40.96
5 2.466 205.91
35 0.616 112.54
35 0.616 88.96
35 2.47 75.95

42 0.616 230.00
56 0.616 232.50
57 0.616 86.90
57 0.616 83.39
42 0.616 168.17
42 0.887 331.19
56 0.887 334.79
56 0.887 158.95
56 0.887 188.75
43 0.887 85.82
42 0.616 230.00
56 0.616 465.01
42 0.616 117.46
57 0.616 59.69
Sub Total- 13766.00 kg 13.766

Total Volume Unit Remarks


Breadth Height Volume
4.000 325.77
4.000 40.80
0.500 31.10
1123.63
3.750 233.25
2.400 136.94
6.700 355.77
Sub Total: 1123.63 m2
Sub Total: 12095.85 sft
Sub Total with wastage: 12095.85 sft
Cement: 120.96 beg
Sand: 230.61 cft
Detail Calculation (m)
Total Volume Unit Remarks
Total Volume Unit Remarks
Breadth Height Volume
0.25 2.65 14.691
15.76
0.25 3.3 1.0725
(250mm) Sub Total: 15.76 m3
(250mm) Sub Total: 556.13 cft
(250mm) Sub Total with wastage: 556.13 cft
Cement: 31.53 beg
Sand: 157.63 cft
Brick: 6463.01 nos

Detail Calculation (m)


Total Volume Unit
Breadth Height Volume
2.65 65.5
3.3 26.7
116.68
3.30 12.5
0.50 12.0
(125mm) Sub Total: 116.68 m2
(125mm) Sub Total: 1255.42 cft
(250mm) Sub Total with wastage: 1255.42 cft
Cement: 31.50 beg
Sand: 175.01 cft
Brick: 6067.10 nos

Total Volume Unit Remarks


Breadth Height Volume
5.051 41.32
1.050 2.63
0.300 1.44
56.91 m2
0.300 0.00
0.700 8.96
0.800 2.56
Sub Total: 56.91 m2
Sub Total: 612.60 sft
Sub Total with wastage: 612.60 sft
Cement: 3.41 beg
Sand: 0.00 cft

Total Volume Unit Remarks


Breadth Height Volume

1123.632 1123.63 m2

Sub Total: 1123.63 m2


Sub Total: 12095.85 sft
Sub Total with wastage: 12216.81 sft
Plastic Paint: 171.92 Liter
Chalk powder: 146.60 Kg
BOQ,Site code:GFRT (27m tower+13m bs)

SI. Names of Item Unit Qty


1 Site Survey & Engineering

Perform Technical Site Survey and Report (TSSR), the price includes
1.1 providing full D2B full report as well as general arrangement drawings set
"attached" for 3 candidates for each site

Detailed Design Drawing DDD (including drawings and calculation notes)


1.2 set
OPTIONAL

Supply of the As built drawings for the final candidate, including all
construction details as well as power and grounding details, Site Document
1.3 set 1
including consultant drawings, lease agreement, all equipment gurantee
certificates, as well as earth certi

2 Site Acquisition
Site Acquisition only will be valid if lease agreement is submitted, this will be
2.1 Unit
only for sucssiful candidate
3 Pre Fabricated Shelter:
3.1 Prefab Shelter with min dimension 3.00 x 4.00x 2.90 (L x W x H) with the unit
following specifications: -Shelter envelope with a minimum IP 54 protection.
- The floor must be able to support a uniformly distributed load of
1000kg/m2, a concentrated force of
(2) Door handle, lever type, powder coated "stainless stell" (3) Door lock,
Open able from inside without the use of a key, (4) Stainless lock door open,
(5) metal door label with high Voltage sign, site Code and Banglalink logo,
and 1.11.3. Red label w

Carrying and Installation of Prefab Shelter with min dimension 3.00 x 4.00x
3.2 Unit
2.90 (L x W x H)
3.3 the same like 3.1 but with 4.00 x 5.00 x 2.90 Unit
Access steps with the following dimensions: - Max. Height 20 cm., - Min.
3.4 Unit
width 28 cm. - Min length 90 cm
4 Brick Shelter
4.2 the same but 3.00 x 3.60 x 2.90 m Unit
4.3 the same but 4.00 x 5.00 x 2.90 m Unit
4.4 the same but 4.00 x 6.00 x 2.90 m Unit
Extra reinforcement concrete for brick shelter base, the concrete strenght
4.5 will not be less than 300 kg/cm2 after 28 days, the price including M3
reinforcement steel
5 Electrical Work
5.1 Multi core cables of standard copper conductors are insulated with XLPE compound, assembled together and covered with an ove
5.1.1 Paradise cable 1 x 2.5 mm(RED)2(Including Guard shade) M 45

Paradise cable 1 x 2.5 mm(Yellow) 2 M 25

Paradise cable 1 x 2.5 mm(Blue) 2 M 25

Paradise cable 1 x 2.5 mm(Black) 2(Including Guard shade) M 85

Paradise cable 1 x 2.5 mm(Green) 2 M 45


5.1.2 Paradise cable 4 x 10 mm2 M
Paradise cable 1 x 4 mm2(RED) M 12
Paradise cable 1 x 4 mm2(YELLOW) M 12
Paradise cable 1x 4 mm2(BLUE) M 12
Paradise cable 1x 4 mm2(BLACK) M 36
5.1.3 Paradise cable 1x 4 mm2(GREEN) M 36
5.1.4 Paradise cable 4 x 25 mm2 M 0
5.1.5 Paradise cable 4 x 16 mm 2 (Only Indoor ) (Approximate) M 6
5.1.5.1 The same but with reduced neutral, 3 x 35 mm + 16 mm
2 2 M 0
5.1.6 Paradise cable 4 x 70 mm2 M 0
5.1.6.1 The same but with reduced neutral, 3 x 70 mm2 + 35 mm2 M 0

Metal enclosure for power meter, Weatherproof IP 55 minimum, Sheet


metal, Lockable, Conform to IEC 439-1 and NF EN 60439-1, the enclosure
5.2 Unit 0
should be enough to install two power meters+ 100 A C>B” the price
including wiring as well as installation materials
GEDP metal enclosure with IP 55, with an independent equipped with rails
and earth terminal blocks, insulating faceplates for each row, the panel
5.3 Unit 0
dimension must be suitable for 72 modules at least, on 4 rows- supplied
with 2 blanking plates for modular wi
5.3.1 Transportation And Installation of MDB Unit 1

Modular distribution box with transparent door, with IP 30 minimum, self


extinguished in accordance with NF C 20-455 for installation in public
5.4 Unit 0
buildings, supplied with blanking plates, the capacity of the panel must be
not less than 54 modules, the price
Transportation and installation of the same but with capacity of 13 modules
5.4.1 Unit 1
for surge arrestor and 100A. MCCB
Circuit breaker, Multi 9, K60N series or similar with at least 6K breaking
5.5 capacity, manufactured by GROUPE SCHNEIDER, conform to IEC 947-2,
NF C 63-1
5.5.1 Circuit breaker 3 poles, 100A. MCCB (Legrand: Italy/ France) Unit 0
5.5.2 Circuit breaker 3 poles, 63A. MCCB (Legrand: Italy/ France) Unit 0
5.5.3 Circuit breaker 3 poles, 40A. (Legrand: Italy/ France) Unit 0
5.5.4 Circuit breaker SP, 32A. (Legrand: Italy/ France) Unit 0
5.5.5 Circuit breaker 2 poles, 20A. (Legrand: Italy/ France) Unit 0
5.5.6 Circuit breaker SP, 16A. (Legrand: Italy/ France) Unit 0
5.5.7 Circuit breaker SP, 10A. (Legrand: Italy/ France) Unit 0

Surge arrestor of class B, to provide common mode protection live &


neutral with the following specs: System rated voltage 220 Volts, Rated
5.6 Unit 0
discharge current 15 KA, Full discharge current 60 KA, Permanent
operating current: <1mA, Permanent operating full
Automatic fire detection system with the following specifications: Mix of
ionic and optical smoke detectors, Automatic shutdown of air-conditioning
5.7 Unit 0
upon a fire alarm, Reporting of fire through the BTS to the MSC. Fire
detection unit will be installed ac
5.8 Portable CO2 fire extinguisher, 5 kg Unit 0

Transportation & installation of Automatic fire detection system and


5.8.1 Unit 1
Portable CO2 fire extinguisher, 5 kg
5.9.1 Same like 5.9, but another Brand "Please Specify" Unit 0
5.9.2 the same like 5.9 but 24,000 BTU Unit 0
5.9.3 Same like 5.9.2, but another Brand "Please Specify" Unit 0

5.9.4 Transportation and Installation of window type AC 1.5 ton (18000 BTU) Unit 1
A/C control unit, including run idicator,Timer with a 7 hours-cycle will be
installed to put in order either A/C1 (3 hours) followed by A/C2 (4hours) and
5.10 Unit 0
vice versa to monitor both A/C units;this timer will ensure only one of the
units will cooling in th
5.10.1 Transportation and Installation of A/C control unit Unit 0

Neon lights of 40W (length: 1.2m) with the following specification:


Construction of the fixture: Polycarbon housing or profiled sheet steel
5.11 Unit 3
having white epoxy finish or baked enamel white, supporting all the
electrical components with injection molded pol
Stand-by lighting system with a battery range of 3hrs to be installed above
the entry door. Self contained auto test emergency luminaires non-
5.12 Unit 1
permanent type. The luminaires runs periodic functionality tests and
autonomy test, the result of which is displa

High temperature sensor, placed 1.30m above the floor to generate an


alarm when the temperature reaches 40°C. In case of alarm it shall report
5.13 Unit 1
through the BTS to the MSC. The high temperature sensor will be placed in
the proximity of BTS racks, the signa

5.14 Door Open sensor Unit 1


15 KVA AVR (Automatic Voltage Regulator), the voltage range between 280
5.15 Set 0
volts to 480 volts (L-L)
the same like 5.15 but 20 KVA with voltage range between 160 volts to 480
5.15.1 Set 0
volts (L-L)
5.15.2 the same like 5.15 but 20 KVA Set 0
5.15.3 the same like 5.15 but 30 KVA Set 0
5.15.4 Transportation and Installation of 20KVA AVR Set 1

Obtaining Power connection for electric supply authority for sanction load of
5.16 Set 1
10 kW, 3 Phase including all necessary formalities & security deposit.

5.16.1 the same but 15 KW, 3 Phase Set 0


5.16.2 the same but for 30 KW, 3 Phase Set 0
5.18 Power inlet for pluging in an emergency mobile generator Unit 0

6 Cable Run
6.0 Out Door cable ladder, Aluminum Type, 400 mm width M 12.60
6.1 IN Door cable ladder, Aluminum Type, 400 mm width M 12.60
6.1.1 the same but 200 mm width M 0
3 inches PVC Schedule 40 conduct for power cable, with high resistance to
6.2 M 0
sun effect, supported with U-clamps every 1 meter,

6.3 Roxtec or similar for cable entry, the price includes frame, sealing
modules and a compression unit
Roxtec G frame, galvanized mild steel, suitable for 6 modules RM40 + 6
6.3.1 Unit 0
modules RM20 for coaxial cables
Roxtec G frame, galvanized mild steel, suitable for 6 modules RM60 + 6
6.3.2 Unit 0
modules RM20 for coaxial cables
6.3.3 Roxtec R100 frame, with 4 modules RM 30 for air conditioning Unit 0

6.3.4 Round seal for single cable entries, Roxtec RS 50 seal, for power cable Unit 0

6.3.5 Round seal for single cable entries, Roxtec RS 43 seal, for earth cable Unit 0
6.4 Cable fed through for feeder entry "in case of No Roxtec" Unit 1
6.5 Gland for Air conditioning pipes and power "in case of No Roxtec" Unit 0
6.6 Cable gland for power cable entry "in case of No Roxtec" Unit 0
6.7 Cable gland for earth cable "in case of No Roxtec" Unit 0
1.5"dia G.I Pole for G.I. cable ladder support, price including all
6.8 Unit 0
accessories, fixation and installation material
GI. electric pole-4" dia 6m bottom and 3" dia for 3m top with RCC base,
6.9 Unit 0
price including all accessories, fixation and installation material
7 Grounding works for Roof Top site
7.2 Earth cable, isolated green/ yellow cable
7.2.1 16 mm(Copper) M 0
16 mm(Alluminium) M 10
7.2.2 35 mm M 0
7.2.3 Earthing cable (green) 50 mm BYA M 0
Earthing cable 50 mm BYA(Alluminium) M 135
7.2.3 Non insulated earthing cable 50mm (Bare copper) M 0

7.3 Access pit for earth


7.3.1 20 x 20 cm Unit 0
7.3.2 30 x 30 cm Unit 0

8 Antennae system and VSWR test


8.1 Feeders 7/8 inch + jumpers cables and Connecters including earthing kits M 340
8.1.1 the same but for feeders 1 1/4" M 0
8.2 GSM Antennae Installation (tilt & Azimuth) Unit 3

Radio Measurment report including the following measurement: Feeder


8.3 Site 1
length, VSWR for feeder, VSWR Antenna + feeder, Attenuation; etc…

9 Masts and/ or Short Towers: Design Wind Speed: 210km/hr Basic wind speed,
Supply and Installation of MW 3.00 m Mast, Design Wind Speed:
210km/hr Basic wind speed, wind area 2 MW dishes 1.2m diameter as the
9.1 Unit 0
attached detailed drawings, price including mast base, fixation as well as all
installation material
Supply and Installation of 6.00 m Mast, Design Wind Speed: 210km/hr
Basic wind speed, wind area 2 GSM antennae + 1 MW dish 1.2m diameter
9.2 Unit 0
as the attached detailed drawings, price including mast base, fixation as well
as all installation material
Supply and Installation of 9.00 m or 8.00m Mast, Design Wind Speed:
210km/hr Basic wind speed, wind area 3 GSM antennae + 2 MW dish 0.6m
9.3 Unit 0
diameter as the attached detailed drawings, price including mast base,
fixation as well as all installation material

Supply and Installation of 12.00 m short tower, Design Wind Speed:


210km/hr Basic wind speed, wind area 6 GSM antennae + 2 MW dish 1.2m
9.4 Unit 0
diameter + 4 MW dish 0.6m diameter "as the attached detailed drawings",
price including fixation ,all installation mat

Supply and Installation of 15.00 m short tower, Design Wind Speed:


210km/hr Basic wind speed, wind area 6 GSM antennae + 2 MW dish 1.2m
9.5 Unit 0
diameter + 4 MW dish 0.6m diameter "as the attached detailed drawings",
price including fixation ,all installation mat

Supply and Installation of 18.00 m short tower, Design Wind Speed:


210km/hr Basic wind speed, wind area 6 GSM antennae + 2 MW dish 1.2m
9.6 Unit 0
diameter + 4 MW dish 0.6m diameter , price including fixation ,all installation
material, as well as supply and insta
Supply and Installation of 20.00 m short tower, Design Wind Speed:
210km/hr Basic wind speed, wind area 6 GSM antennae + 2 MW dish 1.2m
9.7 Unit 0
diameter + 4 MW dish 0.6m diameter "as the attached detailed drawings",
price including fixation ,all installation mat

Supply and Installation of 23.00 m short tower, Design Wind Speed:


210km/hr Basic wind speed, wind area 3 GSM antennae + 2 MW dish 1.2m
9.8 Unit 0
diameter "as the attached detailed drawings", price including fixation ,all
installation material, as well as supply
Reinforcement concrete for tower foundation , the concrete strenght will not
9.9 be less than 300 kg/cm2 after 28 days, the price including reinforcement M3 0.00
steel
9.10 extra MW side arm Hot dip galvanized, 114 mm Dia, 2.00 long unit 0
Supply & Installation Cable Rack for Tower Vertical Ladder unit 0

9.12 GSM side arm Hot dip galvanized, 75mm Dia, 3.00 long, wall mounted unit 0

9.13 MW side arm Hot dip galvanized, 114mm Dia, 2.00 long, wall mounted unit 0

10 Extra items
10.1 Alarm cable (Telephone) m 45
10.2 Security light unit 3
10.3 Junction box unit 0
10.4 PVC pipe 1" m 15
10.5 GI pipe 1.5 " pcs 1
10.6 Flexible pipe 1.5 " m 10
Flexible pipe 1" m 10
10.7 PVC Pipe 1.5" m 15
10.18 Copper rod (1 m) Pcs 0
10.19.1 Power socket 16A double pole and ground type for 230V, Unit 2
10.19.2 13A 3Pin Soket + Switch Combined Unit 1
10.19.3 15A 3Pin Soket + Switch Combined Unit 3
10.19.4 Supply and Installation of Gang switch Unit 2
10.19 PVC Duct (4× 6) cm Pcs 14
10.20 PVC Duct (2× 1.5) cm (Including Generator room wiring) Pcs 15
10.21 Non insulated earthing cable 50mm (Alluminium)Indoor Grounding M 25
10.22 Master Ground Bar (400×100×5) mm Pcs 0
Steel Bar (400×100×5) mm Pcs 2
10.23 Ground Bar (300×50×5) mm Pcs 0
10.24 Ground Bar (150×50×5) mm Pcs 0
10.30 Supply and installation of Hatch bolt Pcs 0
10.25 AC Sequrity Grill unit 2

Reinforcement concrete for tower foundation , the concrete strenght will not
10.9 be less than 300 kg/cm2 after 28 days, the price  including reinforcement M3
steel
10.10 3/4inch Plaster work for Tower base m2
10.11 CC for shelter base m3
10.12 3/4inch Plaster work for cabin CC base m2
10.13 NCF work for cabin CC base m2
10.14 Supply and installetion of Steel Access Ladder with CC Base m
10.15 Supply and installetion of climbing Ladder m
10.16 Carrying & setting of templet & anchor bolt for 15 m tower unit
10.17 1/2" - 3/4"  Plaster work m2
10.20 Welding at Tower Base Column 16mm Dia Bar Pcs

10.21 Welding at Tower Base Column 20mm Dia Bar Pcs

10.22 Carrying and Setting of Template and Anchor Bolt NOS

10.23 Drilling and epoxy for 16mm Dia Bar at Tower Base Column Pcs

Drilling and epoxy for 20mm Dia Bar at Tower Base Column Pcs

11.0 Below iteam not Added in BOQ


11.01 Copper Bar (30cmx5cmx5mm) Pcs 0
Steel Bar (30cmx5cmx5mm) Pcs 1
11.02 Master Ground Bar (400×100×5) mm Pcs 0
11.03 Copper Bar (15cmx5cmx5mm) Pcs 3
Steel Bar (15cmx5cmx5mm) pcs 2
11.06 Non insulated earthing cable 50mm (Bare copper) Mtr 0
11.07 Copper Bar Connector/ Isulator Pcs 16
Cable Lugs (16 rm) Pcs 0
11.08 Cable Lugs (16 rm)(Alluminium) Pcs 40
Cable Lugs (50 rm) Pcs 0
11.1 Cable Lugs (50 rm)(Alluminium) pcs 40
11.11 Clamp For Copper Strip (Metal) Pcs 65
11.12 Line Connector Pcs 5
11.13 Hose Clamp 4" (Metal) Pcs 10
11.14 Hose Clamp 6" (Metal) Pcs 25
11.17 MK Box (Socket +Switch) Pcs 7
11.18 PVC Duct (4× 6) cm Pcs 0
11.19 PVC Duct (2× 1.5) cm Pcs 0
11.2 P.V.C. Socket 25mm Pcs 5
11.21 P.V.C. Elbow 25mm Pcs 5
11.22 Clips with two holes galvanized (PVC 25mm clamp) Pcs 25
11.24 P.V.C Socket 1.5" (37.5mm) Pcs 4
11.25 P.V.C Elbow 1.5" (37.5mm) Pcs 4
11.26 P.V.C Clamp 1.5" (37.5mm) Pcs 25
11.27 IN Door cable ladder, Aluminum Type, 400 mm width M 0
11.28 Indoor Cable Ladder Support Pcs 12
11.29 J Clamp With Screw Pcs 24
11.3 Cutting Disc 3'' Pcs 3
11.31 Royal Plug Pcs 400
11.32 Steel Screw Pcs 400
11.33 Warrning Sign Env.(Hi voltage d. sign) Pcs 1
11.34 Revet 5mm Pcs 50
11.35 Royal Bolt (10mm) Pcs 30
11.36 Royal Bolt (8mm) Pcs 30
11.37 Self Drilling Screw 5mm Pcs 50
Silicon Gel Pcs 8
Spray "Silver" Pcs 1
Welding Tape( B,G,R.Y,Blu,W) Pcs 10
Copper Screw Pcs 0
Steel Nut bolt pcs 50
Galvanaised Nut Bolt 8mm With Duble Washer Pcs 12
Cable Tireap 20cm White (Plastic) Pcs 100
Cable Tireap 30cm Black (Plastic) Pcs 200
Cost for material

Civil
ITEM UNIT QTY
1 If Digging in a soft soil Less than or equal to 3.00 m depth m3 41.00
2 Filling using clean sand m3
3 Backfilling by excavated soil m3 24.00
4 Mass cement concrete, 0.8m3 stone chips : 0.4m3 sand(FM: 2.5): 250kg portland m3
1.94
cement
5 Patent Stone concrete 38 mm thick for site leveling and floor of generator room
m2 57.00

6 450 dia pile NOS 12.00


7 Increase-decrease m 30.60
8 Reinforced concrete including rebar for Tower Basel and Brick shelter m3 72.86
9 60 Grade Reinforcement ton 16.17
10 10" Brick Wall m³ 28.32
11 5" Brick Wall m² 19.68
12 Brick flat soling with cement mortar joint in faces, m² 0.00
13 Supply and Installation of 4 line birbet wire ( hot deep galvanised ) including angles m²
0.00
for fitting as per drawing.
14 Neat Cement finishing, for floor finishing m² 93.00
15 1/2" to 3/4" plaster work ( 1: 4 ) m² 480.00
16 Floor Tiles m² 10.80
17 Wall tiles m² 45.95
18 Durocem paint (3 Coat) m² 387.00
19 Berger Enamel (2 coat) Paint with primer (1 coat) m² 30.00
20 neat Cement finishing, for floor finishing NOS 54.00
21 Grill Work m² 7.27
22 Supply and Install of boundary gate (3m X 3m) including 4 line galvanised birbet wire m²
as per specifications. Price including Berger Enamel (2 coat) Paint with primer (1 8.40
coat)
23 Steel door for Generator Room m2 0.00
24 Guard Room Shed UNIT 0.00
25 3Nos Boring , Earth Resistant <1 ohm, 100ft depth, 1.5" X 2mm Basundhora GI pipe, NOS
1.00

26 Access PIT 60X60X60 NOS 3.00


27 Carrying and setting of template and anchor bolts. Contractor must return the site
1.00
template to OI office within two days of casting padestal
28 BTS Room Door (16 gauge body and 14 gauge Frame) according to attach drawing. m²
Price including Hatch bolt, Tower Bolt, Berger Enamel (2 coat) Paint with primer (1 2.52
coat). Door must be air tight
29 Supply and installation of Climbing Ladder for Roof Access m 11.70
30 Supply and installetion of Steel Access Stair m 4.00
31 AC Wooden box with Frame NOS 2.00
32 Tower Erection and Painting ton 0.00
33 Brick Wall Dismantling m2 0.00
34 RCC Dismantling m3 0.00
35 Site Cost ( Transport & Hotel) Day 35.00
36 Site Preparation & Mobilization with Temporary Facilities NOS 1.00
37 Food Allowance Day 35.00
TOTAL BUDGET
er+13m bs)

Actual Unit Price Total

her and covered with an overall jacket of PVC


0
0
0
0
0

0
0
0
0
0

0
0

0
0
0

0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

BDT 0.00

RATE TOTAL
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00